施工质量验收
- 01
Inspection-lot division rules for installation works: general principle (one design system or equipment group), plan preparation/review procedure, and discipline details for water/sewer, electrical, HVAC, energy saving, industrial, and intelligent buildings
Installation inspection lots are generally divided as one lot per design…
GB 50300-2013《建筑工程施工质量验收统一标准》第4.0.5、4.0.7条GB 55032-2022《建筑与市政工程施工质量控制通用规范》第4.1.1、4.1.2条GB 50242-2002《建筑给水排水及采暖工程施工质量验收规范》第3.1.5条2026-09-12 - 02
GB 55032-2022 "General Code for Construction Quality Control of Building and Municipal Engineering": effect rules and five-chapter framework overview
GB 55032-2022 is a fully mandatory engineering-construction code (implem…
GB 55032-2022 建筑与市政工程施工质量控制通用规范GB 50210-2018 建筑装饰装修工程质量验收标准GB 50300-2013 建筑工程施工质量验收统一标准2026-08-11