施工顺序
- 01
Curb (kerbstone) vs pavement construction sequence and installation essentials: embedded curbs must be set before surface courses; curb bases preferably built with the road base
Overall curb sequence: survey and trench -> curb base (preferably with t…
GB 50092-96 沥青路面施工及验收规范 第10.5.4条CJJ 1-2008 城镇道路工程施工与质量验收规范 第16.1.5条CJJ/T 303-2020 中低速磁浮交通工程施工及验收标准 第9.3.6条2026-09-12 - 02
Determining construction sequence in construction schemes: compilation location, basis, principles, and operating steps (GB/T 50502-2009 construction-deployment framework)
The construction sequence is determined in the "construction deployment…
GB/T 50502-2009 建筑施工组织设计规范GB/T 50903-2013 市政工程施工组织设计规范T/CBDA 35-2019 建筑装饰装修工程施工组织设计标准2026-08-11