accrual basis
- 01
Diagnosing "profitable but cash-strapped" construction projects: a five-step indicator system for the divergence between accrual-basis profit and cash-basis cash flow
Put accrual-basis book profit side by side with cash-basis operating net…
企业会计准则(财政部令第5号)第16、45条企业所得税法实施条例 第9条GB/T 50326-2017 第11.4.3、14.6.3条2026-09-25 - 02
Determining cross-period manipulation of project cost data: accrual basis + three-synchronization dual yardsticks and three-layer screening
To judge cross-period adjustment, first set two yardsticks: (1) accrual…
企业会计准则——基本准则(财政部令第5号)第16条GB/T 50326-2017 建设工程项目管理规范 第11.4.2/11.4.3条国发〔1984〕34号 国营企业成本管理条例 第17条2026-09-25 - 03
Construction project funding and finance overview: the four revenue measures (contract / invoiced / settled / collected), divergence diagnostics, receivables and cash-flow linkage
One project, four revenue bases, each in its place: contract revenue rec…
中华人民共和国财政部令第5号 企业会计准则(权责发生制、长期工程合同完成进度法确认收入)中华人民共和国国务院令第709号 发票管理办法(2019修订)第十九条中华人民共和国财政部令第4号 企业财务通则 第二十九条2026-09-25