Determining cross-period manipulation of project cost data: accrual basis + three-synchronization dual yardsticks and three-layer screening
To judge cross-period adjustment, first set two yardsticks: (1) accrual basis — costs are aggregated per quantities completed, actual consumption, and actual prices within the accounting period; planned/estimated/quota costs must not replace actual costs; (2) three synchronizations — physical progress, output-value statistics, and cost aggregation are synchronized and accounted per accounting cycles. Then screen in three layers: compliance (does the adjustment have trigger conditions and procedures), period matching (V-shaped cost-rate jumps, concentrated month-end rush requisitions, unfounded accruals and reversals, revenue-cost matching), and data stability (cumulative figures only increasing, red-letter entries examined one by one).
Applicable Codes
- 企业会计准则——基本准则(财政部令第5号)第16条
- GB/T 50326-2017 建设工程项目管理规范 第11.4.2/11.4.3条
- 国发〔1984〕34号 国营企业成本管理条例 第17条
Topic Positioning
A systematic method to determine whether construction project cost data has been shifted across periods (expenses moved into or out of the current period): set accounting yardsticks first, then screen in layers — applicable to monthly cost analysis, audits, and compliance checks.
Core Conclusions
Two hard yardsticks: (1) accrual basis — Accounting Standards for Enterprises Article 16 requires accrual-basis accounting; construction enterprises' costs must be aggregated per quantities completed, actual consumption, and actual prices within the accounting period; planned, estimated, or quota costs must not replace actual costs; (2) three synchronizations — cost accounting insists on synchronization of physical progress, output-value statistics, and cost aggregation (GB/T 50326-2017, Clause 11.4.3), accounted per prescribed accounting cycles (Clause 11.4.2). Three-layer screening: first, compliance — distinguish compliant adjustments (with trigger conditions such as changes/policies/prices/force majeure plus the review -> recalculation -> re-approval procedure) from rule-violating period shifting (unfounded); quick-check the three-piece set of adjustment-entry explanation, original vouchers, and approval signatures; second, period matching — V-shaped jumps in the monthly cost rate (cost/output value), cumulative cost diverging from physical progress, concentrated large requisitions at month-end reversed in early next month, payroll attendance periods misaligned with booking periods, large settlements booked by payment period instead of the corresponding work period, unfounded period-end accruals fully reversed at period start (a profit-smoothing signal), and cost and revenue recognition periods unmatched — all cross-period suspicion fingerprints; third, data stability — cumulative costs only ever increase (last month's approved figures rewritten retroactively is an anomaly), red-letter entries require reasons one by one, guard against the same voucher charged in two periods, and booking dates must not precede invoice/contract/sign-off dates.
Applicable Boundaries
Applies to project-level cost accounting and audits of construction enterprises. Not all period adjustments are anomalous: planned-price accounting adjusted to actual cost per the cost-accounting period is a normal procedure, and contract-agreed material price differences aggregated over the adjustment construction period are also compliant; single-point anomalies must be judged with contract provisions and vouchers — do not characterize by curve shape alone.
Further Reading
"Accounting Standards for Enterprises — Basic Standards" (Ministry of Finance Order No. 5) Article 16; GB/T 50326-2017 "Code for construction project management" Clauses 11.4.2, 11.4.3; "Cost Management Regulations for State-Owned Enterprises" (Guo Fa [1984] No. 34) Article 17. Three-synchronization implementation, monthly cost analysis, and four revenue calibers are covered in the cards cited by this card.
Keywords
- 跨期调整
- cost accounting
- accrual basis
- 三同步
- 成本率
- 红字冲销
- 利润平滑
- 成本期间归属