框外围面积
- 01
Quantity-calculation caliber for aluminum (metal) panel curtain walls: computed by the design outer surface / frame-perimeter area, not by the developed fabrication area of the aluminum sheet; projected area is the unitized-curtain-wall caliber, and developed area applies only to rib-stiffened full-glass walls (BOQ and quota calibers compared)
Component-type metal-panel (aluminum) curtain walls are computed by the…
GB/T 50854-2024 附录M 表M.6.1 幕墙工程(编码011206)DB11/T 2382-2024 第4.13.14条、第4.13.26条及附录A表A.12.9-3(子目A-12-269)TB/T 10831-2024 铁路工程预算定额 第十册 房屋工程 册说明(幕墙、隔断)2026-09-12 - 02
Budget pricing of custom cabinets, partitions, and ready-made furniture: BOQ listing calibers (011501/011207) and three pricing paths
Pricing custom cabinets/partitions/ready-made furniture first splits two…
GB/T 50854-2024 附录Q.1.1柜架台(011501)GB/T 50854-2024 附录M.7.1隔墙隔断(011207)GB/T 50500-2024 第8.4.5/8.4.6条 暂估价调整2026-08-11