Budget pricing of custom cabinets, partitions, and ready-made furniture: BOQ listing calibers (011501/011207) and three pricing paths
Pricing custom cabinets/partitions/ready-made furniture first splits two routes — "site-built" vs "ready-made procurement": GB/T 50854-2024 Appendix Q.1.1 cabinets/frames/counters 011501 — site-built cabinets by orthographic projection area (011501001~003), ready-made cabinets by count/set (011501004); Appendix M.7.1 partition walls 011207 — by frame peripheral area (011207001~002), ready-made partitions 011207003 installation only. Three pricing paths: site-built per quota (materials adjusted per developed drawings), ready-made per purchase price + installation labor (ready-made is an unpriced main material requiring inquiry and listing), partitions in two tiers of site-built and ready-made. Where ready-made items are listed as provisional sums, only the material cost is adjusted after price confirmation (GB/T 50500-2024 Clause 8.4.6).
Applicable Codes
- GB/T 50854-2024 App. Q.1.1柜架台(011501)
- GB/T 50854-2024 App. M.7.1隔墙隔断(011207)
- GB/T 50500-2024 第8.4.5/8.4.6条 暂估价调整
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
Topic Positioning
The BOQ listing calibers and budget pricing paths for custom cabinets, partitions, and ready-made furniture (cabinets/frames/counters): first distinguish the two routes of "site-built" and "ready-made procurement", then list and price by the corresponding calibers, preventing double charging and unit mismatches.
Core Conclusions
BOQ calibers (GB/T 50854-2024): under cabinets/frames/counters 011501, decorative cabinets/frames/counters (site-built) 011501001~003 are computed by orthographic projection area per the design dimensions, with work content including fabrication, installation, painting, and hardware; ready-made cabinets/frames/counters 011501004 are computed by count (set), including installation and hardware only. Under partition walls 011207, light partition walls/partitions 011207001~002 are computed by area of the frame peripheral dimensions, without deducting openings <=0.3 m2; ready-made partitions 011207003 by frame peripheral area, including installation and joint sealing/ stuffing only.
Three pricing paths: (1) site-built cabinets priced with cabinet fabrication quotas, materials adjusted per developed drawings (e.g., Shaanxi quota 15-9 embedded wooden wardrobe: plywood + veneer panels + moldings + full hardware set, material cost dominating, hardware listed separately); (2) ready-made cabinets/furniture priced at "ready-made purchase price + installation labor" — ready-made items are unpriced main materials requiring separate inquiry and listing (including freight and procurement-keeping); when employer-supplied, installation only; (3) partitions in two tiers — site-built with partition quotas (e.g., railway Volume 10 FY-1473 fully-glazed partition etc., priced per 10 m2 with a labor/material/machinery structure), ready-made at ready-made price + installation. Where ready-made items are listed as provisional sums, after price confirmation only the material cost is adjusted per GB/T 50500-2024 Clause 8.4.6 (pre-tax price difference) — labor, machinery, management fee, profit unchanged.
Error-prone points: BOQ (orthographic projection/frame peripheral area) and quota (count, 10 m2) measurement units must be converted and unified; ready-made and site-built must not be double charged (the ready-made path must not further apply quotas containing fabrication, finish, painting); the custom cabinet quota already includes hardware and painting; ready-made cabinet hardware is inside the ready-made price.
Applicable Boundaries
Applies to BOQ pricing of building and decoration works and estimate/budget preparation with the railway building works quota; provincial quotas (Shaanxi, Beijing, etc.) differ slightly in item calibers — the current local quota prevails; the railway quota general explanation states installation items exclude equipment costs and ready-made prices must be listed separately; not applicable to pure furniture procurement (non-construction) scenarios.
Further Reading
GB/T 50854-2024 Appendix Q.1.1 (cabinets/frames/counters 011501), Appendix M.7.1 (partition walls 011207); GB/T 50500-2024 Clauses 8.4.5, 8.4.6 (provisional sum adjustment); TB/T 10831-2024 Railway Engineering Budget Quota Volume 10 Building Works, decoration works chapter (partition items from FY-1473); Shaanxi newly compiled consumption quota cabinet items (15-9 embedded wooden wardrobe etc.).