break-even
- 01
Selecting construction equipment rental pricing modes: break-even criteria for choosing among shift-rate, monthly-rate, and quantity-based pricing
Cost depends on monthly usage intensity, rental duration, and measurabil…
TB/T 10814-2024 铁路工程施工机具台班费用定额湖北省建筑安装工程费用定额(2024)湖南省消耗量标准机械台班附录2026-09-25 - 02
Lease vs. self-build economics for the construction camp (temporary works): the break-even duration method (external pricing unchanged)
Decide with the break-even duration T* = (self-build net cost - lease co…
TB 10801-2024TB 10811-2024GB 51114-20152026-09-25 - 03
Break-even point and minimum output value calculation for construction projects (CVP / break-even analysis)
Break-even output value = fixed costs ÷ contribution margin ratio; minim…
GB/T 50326-2017 建设工程项目管理规范GB/T 50502-2009 建筑施工组织设计规范RISN-TG 012-2011 建设工程项目经理执业导则2026-09-25