extension of time
- 01
FIDIC Red Book 2017 EOT (8.5/20.2) vs GB/T 50500-2024 Section 8.11 delay-claim regime: the 28-day cadence, cost-and-time in one case, three-way liability, and the critical-path causation threshold
FIDIC 2017 Red Book EOT (Sub-Clause 8.5; procedure per 20.2) and GB/T 50…
FIDIC Conditions of Contract for Construction, 2nd Edition 2017, Sub-Clause 8.5/8.7/20.2, Clause 18GB/T 50500-2024 建设工程工程量清单计价标准 第8.11节2026-09-25 - 02
FIDIC 2017 Red Book Sub-Clause 8.8 Delay Damages: trigger, daily rate, cap, sole-remedy character, and the linked risks of 8.2/20.2/15.2/17.4
Under FIDIC 2017 Red Book 8.8: where the contractor fails to complete by…
FIDIC Conditions of Contract for Construction, 2nd Ed. 2017 (Red Book): Sub-Clause 8.8 Delay Damages; 相关 8.2/8.5/8.9、15.2、17.4、20.2GB/T 50500-2024 建设工程工程量清单计价标准 第 8.11.3、8.11.4、8.11.19 条、第 2.0.33 条GB/T 50875-2013 建设工程造价术语标准 第 3.4.6 条2026-09-25 - 03
The non-equivalence of FIDIC 2017 Red Book delay machinery and the national-standard delay regime: delay fact / EOT / Delay Damages vs delay claims / extensions / delay damages / liquidated damages
Not equivalent. FIDIC never treats delay as a single term: it is a chain…
FIDIC Conditions of Contract for Construction (Red Book), Second Edition 2017, Sub-Clauses 8.2/8.5/8.8/10.1/20.2GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.33 条、第 8.11.3~8.11.19 条GB/T 50875-2013 · Standard glossary of project costs 第 3.4.6 条2026-09-25