Railway 2024 quotas: looking up base-period prices of sand — TB/T 10813-2024 sand table, medium-coarse sand by use, machine-made sand listed separately

The authoritative source is the "1. sand and mortar" subtable of Section 8 aggregate, Chapter 2 common materials, TB/T 10813-2024. Sands are not split by fineness modulus into medium/coarse: one "medium-coarse sand" by use in four bands — filling 60.63, masonry 65.48, beams 72.02, track slabs 73.46 yuan/m3; machine-made sand listed separately at 65.50; also fine sand 48.50 and refined sand (for CA mortar) 53.10. All Class A (base price = original price x (1 + procurement and custody rate); sand 4.47%), unit weight 1.43 t/m3. Base prices are 2020-level, ex-deductible-VAT; match the computer codes cited by each quota item — different parts use different codes of medium-coarse sand; do not mix.

Applicable Codes

  • TB/T 10813-2024 · Base Period Prices of Materials for Railway Engineering
  • TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works

Topic Positioning

How to look up, and the actual data of, sand base-period prices in the railway 2024 quotas: the table's location, computer codes, classification logic (medium-coarse sand by use, not fineness modulus), machine-made sand listed separately, price levels, and application essentials.

Core Conclusions

Source and lookup: TB/T 10813-2024 "Base-period prices of railway works materials", Chapter 2 "common materials" -> Section 8 "aggregate" -> "1. sand and mortar". General 1.0.2: the prices serve compiling quotas, estimates, and budgets; implementation-stage prices are market-determined; 1.0.3: prices are 2020-level and ex-deductible-VAT. In software, call by computer code (unified material codes; sands in the 1080xxx range).

The sand table (unit m3; Class A sand unit weight 1.430000 t/m3):

Code Name and spec Base price (yuan/m3) Class
1080105 Fine sand 48.50 A
1080209 Medium-coarse sand (filling) 60.63 A
1080313 Medium-coarse sand (masonry) 65.48 A
1080417 Medium-coarse sand (beams) 72.02 A
1080521 Medium-coarse sand (track slabs) 73.46 A
1080625 Machine-made sand 65.50 A
1080729 Refined sand (for CA mortar) 53.10 A
1081249 Green-bean sand 52.82 C

Also in the table: barite sand 0.57 yuan/kg, dolomite sand 1.26, black-carbon emery 7.28, quartz sand 0.38, epoxy colored sand (regular colors) 4.00 (all Class C); dry-mixed masonry mortars M5.0 476.93 yuan/m3, M7.5 483.55 (Class C).

Classification logic: the railway material library does not split "medium/coarse" by fineness modulus — one "medium-coarse sand" by use in four bands (filling / masonry / beams / track slabs), machine-made sand listed separately, plus fine and refined sands.

Price level: fine about 48.5 -> filling 60.6 -> masonry/machine-made about 65.5 -> beams 72 -> track slabs 73.5 yuan/m3, overall 48-74. Machine-made (65.50) is nearly level with masonry medium-coarse (65.48), about 8% above filling, about 10% below beams/track slabs.

Composition caliber: sand is Class A; per general 1.0.4 item 1, Class A base price = original price x (1 + procurement and custody rate); the rate per TB 10811-2024 Table 2.2.2 — sand 4.47% (cement 3.78%, crushed stone 3.45%, brick/tile/lime 4.98%, others 2.65%). Class A excludes freight; freight-outside-price to a delivery point is computed separately in the item estimate (budget).

Application essentials: match the sand to the quota item — different parts (masonry/beams/track slabs/filling) cite different codes of medium-coarse sand; do not mix. Machine-made sand appears in machine-made-sand concrete or items marked "machine-made sand" — check the code attached to the item's consumption table before pricing.

Applicable Boundaries

For looking up sand base-period prices when compiling railway quotas, estimates, and budgets (general 1.0.2). Base prices are 2020-level, ex-deductible-VAT; compilation-period prices are survey prices ex-deductible-VAT, determined by the designer (TB 10811-2024 Clause 2.2.3), with differences booked as price differences. Implementation-stage prices are market-determined. Figures are the uniform national base, not regional compilation-period prices; water (0.55 yuan/t) and power (0.47 yuan/kWh) bases are in TB 10811-2024 Clauses 2.2.4/2.2.5 — outside this card.

Further Reading

See TB/T 10813-2024 general articles 1.0.1-1.0.6 (scope, 2020 base, Class A/B/C formulas, code definitions, unit weights); Chapter 2 Section 8 "1. sand and mortar" (this table) and "2. stone" (crushed stone <=16-<=80 masonry 73.72-89.26 yuan/m3, <=16 beams 98.19, <=16 track slabs 101.13, unit weight 1.5 t/m3; cobble filling 49.90 yuan/m3, 1.55 t/m3 — for concrete aggregate comparison); TB 10811-2024 Table 2.2.2 (procurement and custody rates) and Clause 2.2.3 (sand is a main material: base per TB/T 10813, compilation-period by survey, freight-outside-price separate).