What to deduct and what not to deduct in concrete quantities: rebar / bolts / embedded steel items / tensioning ducts not deducted, rigid-skeleton structural steel deducted, the 0.3m2 single-opening threshold and the distinction from door and window openings (criteria compared across building GB/T 50854, municipal GB/T 50857, rail transit GB/T 50861, railway TB/T 10831 and local consumption standards)

Concrete quantities are measured by design-shown dimensions in volume (m3): the volumes occupied by rebar, bolts, embedded steel items and tensioning ducts in cast-in-place members are never deducted; openings of no more than 0.3m2 each are not deducted (over 0.3m2 is deducted); but the volume of rigid-skeleton structural steel is deducted. The 0.3m2 test is on the area of each single (single-hole) opening, not on cumulative area; door and window openings are always deducted from walls, and the concept does not apply to slabs.

Applicable Codes

  • GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. E 第E.7.1条
  • GB/T 50857-2024 · Standard for Measurement of Quantities of Municipal Works App. C 第C.9.4条
  • GB/T 50861-2024 · Standard for Measurement of Quantities of Urban Rail Transit Works App. C 第C.8.3条、第C.8.4条
  • SJG 181.2-2024 · Consumption Standard for Municipal Works (Volume 2) (Shenzhen) 第2.2.1条
  • SJG 111.2-2022 · Consumption Standard for Urban Utility Tunnel Works (Volume 2: Utility Tunnel Architectural and Decoration Works) (Shenzhen) 第3.2.1条、第3.2.2条
  • TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明十、工程量计算规则
  • 北京市《2021预算消耗量标准》房屋建筑与装饰工程(京建发〔2021〕201号)第五章
  • 江苏省《建筑与装饰工程消耗量定额》(2026版)第五章 混凝土及钢筋混凝土工程
  • 《陕西省新编消耗量定额》(征求意见稿)混凝土工程量计算规则

Topic positioning

Answers the set of judgements most often got wrong in concrete measurement: which embedded items and what size openings in a member are deducted or not, and why structural steel (rigid skeleton) is the sole reverse exception. Covers the criteria of the building, municipal bridge, urban rail transit, railway and utility tunnel standards plus local consumption quotas.

Core conclusions

Verbatim rules of three sector measurement standards (cast-in-place members)

  • Building GB/T 50854-2024 Annex E, E.7.1 'general notes on cast-in-place concrete members', item 2: 'For cast-in-place reinforced concrete members, the volumes occupied by rebar, bolts, embedded steel items and tensioning ducts within the members are not deducted, but the volume of structural steel of rigid skeletons shall be deducted.'
  • Municipal bridges GB/T 50857-2024 Annex C, C.9.4: 'Where quantities of concrete members are measured by volume, the volumes occupied by rebar, bolts, embedded steel items, tensioning ducts and openings of no more than 0.3m2 each within the member are not deducted, but the volume of structural steel within the member shall be deducted.'
  • Urban rail transit GB/T 50861-2024 Annex C, C.8.3 item 1: 'Quantities of cast-in-place (precast) concrete do not deduct the volumes occupied by rebar, bolts, embedded steel items, tensioning ducts and openings of no more than 0.3m2 each within members; the volume of rigid steel skeletons is deducted.' Item 2 of the same clause: the item description 'type of concrete' may be described as ready-mixed (commercial) concrete, site-mixed concrete, fair-faced concrete, coloured concrete, underwater concrete, waterproof concrete, acid-resistant concrete, rubble concrete, lightweight-aggregate concrete, etc.

Criterion caution (guarding against over-generalisation): the building E.7.1 general note lists only the four non-deduct items 'rebar, bolts, embedded steel items, tensioning ducts' plus deduction of structural steel, it does not contain the 0.3m2 sentence; the 0.3m2 threshold sits in the calculation rules of wall, slab and other items. When reading the building BOQ, read both the general note and the item-specific rule.

Exact application of the 0.3m2 threshold

  • The comparison is the area of each single (single-hole) opening, not the cumulative area of several openings in one member, nor an opening volume ratio. SJG 181.2-2024 clause 2.2.1: 'Quantities of cast-in-place concrete beds, foundations, pile caps, beams, pier shafts and abutment shafts are measured in cubic metres on the solid volume shown on the design drawings (solid volume excludes the void volume of beams and slabs); the volumes occupied by rebar, wire, embedded items, reserved grouting ducts and bolts are not deducted; for cast-in-place concrete walls and slabs the volumes of openings with a single-hole area within 0.3m2 are not deducted.' SJG 111.2-2022 clause 3.2.1: 'Concrete quantities are measured in cubic metres on design-shown dimensions; the volumes occupied by rebar and embedded steel items in concrete members and by openings of single area within 0.3m2 in walls and slabs are not deducted.'
  • Direction: within (no more than) 0.3m2 not deducted, over 0.3m2 deducted. Urban rail transit GB/T 50861-2024 C.8.4 item 3: 'Concrete walls: the wall height is taken from the top of the base slab (or floor slab) to the top of the floor slab above. The wall volume deducts door and window openings and openings with a single area over 0.3m2. Wall pilasters (attached columns), concealed columns, concealed beams and protruding parts are merged into the wall volume. Where slab and wall overlap, the overlap counts as wall; where beam and wall overlap, it counts as beam.' Jiangsu 2026 edition: 'Reinforced concrete walls: measured by volume on design-shown dimensions. Door and window openings and openings with single area over 0.3m2 are deducted; wall columns, wall beams and parts protruding from the wall face are merged into the wall volume.'
  • Boundary value: exactly 0.3m2 counts as 'within' and is not deducted. Railway TB/T 10831-2024 volume notes item 10: '(2) Cast-in-place walls and slabs do not deduct the concrete volume of openings with area within 0.30m2.' '(6) Walls are measured in volume as the centre-line length shown on the design drawings times wall height and thickness; door and window openings and openings beyond 0.30m2 are deducted; wall pilasters and protruding parts are merged into the wall volume.'
  • Companion sentence: side faces of openings are not added, and the extra labour and materials for formed openings are not separately charged. Jiangsu 2026 edition: 'Unless otherwise provided, concrete quantities are measured by volume on drawn dimensions. Volumes occupied by rebar, supports, bolt holes, bolts, embedded steel items and openings within 0.3m2 in walls and slabs are not deducted. The extra labour and materials for formed openings are not further charged.'

Read walls and slabs separately: door and window openings are a must-deduct for walls (wall rule = deduct door and window openings + deduct openings over 0.3m2); slabs have no door or window concept - slabs deduct only openings over 0.3m2 (some local quotas also spare columns and pilasters). The Shaanxi quota: 'Slabs: measured by volume on design-shown dimensions; volumes of column-pilasters and openings of single area within 0.3m2 are not deducted; slab ends built into brick walls are merged into the slab volume'; 'composite hollow slabs are measured by volume on design-shown dimensions (deducting the hollow part)'.

Structural steel (rigid skeleton) - the sole reverse exception: the non-deduct list covers flexible or small-section embeds such as rebar, bolts, embedded steel items and tensioning ducts; structural steel is a rigid skeleton and is listed separately as a deduction (consistent in GB/T 50854-2024 E.7.1, GB/T 50857-2024 C.9.4 and GB/T 50861-2024 C.8.3). Two conversion rules on the ground: (1) Shaanxi quota: 'The volume occupied by structural steel shall be deducted... the volume of structural steel is taken at 7850kg/m3'; (2) Beijing 2021 budget consumption standard, chapter 5: 'In steel-reinforced concrete frames the volume of structural steel is deducted at 0.127m3 of concrete per tonne of steel' (that clause is poorly printed or poorly recognised in the original; verify against the paper original before use).

Detail exceptions: bolt holes, service ducts and grooves, pile heads, etc.

  • Cast-in-place: bolt holes, supports and the bolts themselves are not deducted (Jiangsu 2026 edition); pile heads built into pile caps or foundations are not deducted (Beijing 2021 standard: 'the volumes occupied by rebar, embedded steel items and pile heads entering pile caps and foundations are not deducted'; Jiangsu same criterion); but reserved openings in equipment foundations are deducted (TB/T 10831-2024 item 10(3)2: 'the volume of reserved openings in equipment foundations shall be deducted').
  • Precast: Jiangsu 2026 edition: 'Precast concrete members are measured by volume on design-shown dimensions. The volumes occupied by rebar, bolts, embedded steel items and tensioning ducts are not deducted, but the volume of structural steel of rigid skeletons is deducted'; 'precast slab members do not deduct the volumes of openings of single area no more than 0.3m2 and slab joints of width no more than 40mm, nor the void volume of hollow-core slabs'; the railway criterion runs opposite - 'precast concrete members... do not deduct rebar, embedded items, bolts and openings of area no more than 300x300 within the member; the void volume of hollow-core slabs is deducted'.
  • Precast utility tunnels: SJG 111.2-2022 clause 3.2.2: 'Erection of precast utility tunnels is measured in cubic metres on the volume of precast members. The volumes occupied by rebar, embedded steel items, conduits, sleeves, junction boxes, openings of single area no more than 0.3m2 and box housings are not deducted, and the volume of exposed rebar is likewise not added' - i.e. embedded services, sleeves and boxes are non-deduct exceptions.

Three-column comparison of deductions (member type x deducted x not deducted)

Member type Deducted Not deducted
Cast-in-place columns, beams Volume of rigid-skeleton structural steel Rebar, bolts, embedded steel items, tensioning ducts
Cast-in-place walls Door and window openings; openings of single area over 0.3m2; structural steel Openings of single area no more than 0.3m2; rebar, bolts, embedded steel items, tensioning ducts
Cast-in-place slabs Openings of single area over 0.3m2; hollow part of composite hollow slabs; structural steel Openings of single area no more than 0.3m2 (local quotas also spare columns and pilasters); rebar, embedded items
Cast-in-place foundations, pile caps, pier and abutment shafts Structural steel; reserved openings in equipment foundations (railway criterion) Rebar, embedded items, bolts, reserved grouting ducts, pile heads entering pile caps; openings no more than 0.3m2
Precast members Rigid-skeleton structural steel; hollow-core slab voids (railway criterion) Rebar, bolts, embedded steel items, tensioning ducts; openings no more than 0.3m2; slab joints up to 40mm wide (Jiangsu criterion)
Precast utility tunnels - Rebar, embedded steel items, conduits, sleeves, junction boxes, box housings; openings no more than 0.3m2; exposed rebar volume not added

Applicability boundaries

  • Applies to BOQ preparation and quota pricing of concrete members measured by volume (m3); members measured by area, by length or by horizontal projection (stairs as a whole, balustrades, cantilever eaves, etc.) have other rules and must not borrow this card's deduction criteria.
  • The BOQ criteria (GB/T 50854/50857/50861 annexes) and the quota criteria may differ (the building general note lacks the 0.3m2 sentence; railway precast deducts hollow-core voids; Jiangsu spares precast slab joints); the two must not be mixed on one project; execution follows the measurement standard or quota edition agreed in the contract and its item rules.
  • 'Within 0.3m2 not deducted' does not apply to door and window openings: door and window openings in walls are deducted whatever their area.
  • The conversion factors for deducting structural steel (7850kg/m3, 0.127m3/t) are local-standard implementations; check the local quota notes before use across regions.
  • Treatment of hollow-core slab voids in precast members differs by sector (Jiangsu not deducted, railway deducted); do not carry it across sectors.

Further reading

  • Building BOQ: GB/T 50854-2024 Annex E, E.7.1 'general notes on cast-in-place concrete members'; the item calculation rules for walls and slabs are in the corresponding items of Annex E.
  • Municipal bridges: GB/T 50857-2024 Annex C, C.9.4; consumption criteria in SJG 181.2-2024 clause 2.2.1 (cast-in-place concrete works).
  • Urban rail transit: GB/T 50861-2024 Annex C, C.8.3 (deductions and concrete type descriptions) and C.8.4 (calculation rules by member - columns, beams, walls, slabs - including listing vent shafts, cable shafts and fire water tanks under the concrete lift shaft item, and cast-in-place beds under Annex B.2).
  • Railway: TB/T 10831-2024 Volume 10 'Building works', volume notes '10. Calculation rules for quantities', items (1)(2)(3)(6)(9).
  • Utility tunnels: SJG 111.2-2022 clauses 3.2.1 (cast-in-place) and 3.2.2 (precast, including the services, sleeves and boxes exception).
  • Local consumption standards: Beijing '2021 budget consumption standard', building and decoration works, chapter 5; Jiangsu 'consumption quota for building and decoration works' (2026 edition), chapter 5; Shaanxi new consumption quota, calculation rules for concrete quantities (consultation draft).

Keywords

  • 现浇混凝土工程量
  • 不扣除钢筋预埋铁件
  • 0.3m²孔洞
  • 劲性骨架型钢扣除
  • 门窗洞口扣除
  • 扣除与不扣除对照
  • 混凝土体积计算规则
  • 单孔面积口径