Deduction basis for cast-in-place concrete of steel-reinforced concrete (SRC) columns: embedded steel sections (rigid skeletons) deducted, shear studs and other bolt-type connectors not, with two algorithms - by drawn volume and by tonne conversion
The cast concrete quantity of SRC columns deducts the volume of the embedded steel sections (rigid skeleton) and does not deduct shear studs and other bolt-type connectors. Basis: GB/T 50854-2024 Appendix E general notes on cast components - cast reinforced concrete does not deduct rebar, bolts, embedments or post-tensioning ducts, but does deduct the steel sections of rigid skeletons - the sole exception to the no-deduction list. Deduction, one of two ways: 1 by the actual drawn volume of the sections; 2 by the simplified 0.127 m3 per tonne of sections (i.e. converted at 7850 kg/m3, expressly per Beijing DB11/T 2382-2024 Article 4.6.6). The sections themselves itemise separately in t under Appendix F metal structure works; shear studs neither join the concrete deduction nor the steel quantities, itemised separately per piece / set.
Applicable Codes
- GB/T 50854-2024 App. E 现浇混凝土构件通用说明
- GB/T 50854-2024 App. F F.10.4
- GB/T 50854-2024 App. F F.10.10
- GB 50861-2013 App. B B.9.1 高架桥工程
- GB 50205-2020 App. J 钢结构工程计量方法
- DB11/T 2382-2024 第4.6.6条
- 江苏省建筑与装饰工程消耗量(2026版)现浇混凝土构件总则
- 陕西省新编消耗量定额(2024征求意见稿)工程量计算规则
Scope of the question
For cast reinforced concrete members such as SRC columns: whether the steel sections (rigid skeleton) and the shear studs are deducted when computing concrete quantities, how, and where the deducted steel lands on the BOQ side.
Core conclusions
1. Sections (rigid skeleton) always deducted - a general-rule provision GB/T 50854-2024 Measurement Standard for Building and Decoration Works, Appendix E general notes on cast components, item 2: cast reinforced concrete members do not deduct the volumes of rebar, bolts, embedments or post-tensioning ducts, but do deduct the volume of the steel sections of rigid skeletons. The rule is general - columns, beams, walls and slabs alike; steel sections are the sole exception to the no-deduction list. Other disciplines and local standards agree:
- Urban rail: GB 50861-2013 Appendix B elevated works B.9.1 - concrete quantities do not deduct rebar, bolts, embedments, ducts or single holes up to 0.3 m2, but do deduct rigid steel skeletons.
- Local standards: Jiangsu (2026) general notes - same wording; Shaanxi new quota (2024 draft) - deduct steel section volumes, not rebar, embedments or holes up to 0.3 m2 in walls and slabs.
2. How to deduct - two algorithms
- By drawn volume (general practice): column concrete = drawn volume of the column - section volume per the drawn dimensions.
- By tonne conversion (local simplification):
- Beijing DB11/T 2382-2024 Article 4.6.6 paragraph 1: in steel-reinforced concrete frames, deduct 0.127 m3 of concrete per tonne of sections.
- Shaanxi new quota: section volumes computed at 7850 kg/m3. The two are the same: 1 t / 7.85 t/m3 = about 0.127 m3/t, i.e. deduct section mass (t) x 0.127 m3/t, cross-checkable against the drawn-section volume.
3. Where the sections land in the BOQ GB/T 50854-2024 Appendix F F.10.4: the rigid steel skeletons of SRC columns and beams and the tubes of concrete-filled tubes shall be itemised under this appendix's codes, their concrete and rebar under Appendix E. So sections sit outside the concrete volume, itemised in t under metal structure works.
4. Studs not deducted
- Concrete side: the no-deduction lists name rebar, bolts and embedments - shear studs as bolt-type shear connectors welded to the sections fall there; the sole exception is sections, not studs.
- Steel side: GB/T 50854-2024 Appendix F F.10.10 - high-strength bolts, bearings and shear studs are not counted into the steel member quantities, itemised separately by kind.
- Measurement: GB 50205-2020 Appendix J item 3 - fasteners (bolts) and studs are design quantities per specification, shape and size as counts (sets) or converted mass (count x unit mass).
5. Summary
- Column concrete: drawn volume less sections - Appendix E cast columns;
- Sections (rigid skeleton): outside the concrete - Appendix F metal structure, in t;
- Rebar, embedments, bolts in the column: not deducted - Appendix E;
- Shear studs: neither deducted nor merged into steel - Appendix F, itemised per piece / set.
Applicability limits
- This basis targets cast reinforced concrete members (SRC columns, beams, walls); precast members and other disciplines have their own rules.
- The 0.127 m3 per tonne is a Beijing / Shaanxi simplification; Jiangsu and others say only deduct section volumes without a coefficient - check the local standard before measuring; no cross-region borrowing of coefficients.
- After deducting section volume from the concrete, the sections itemise separately in t under Appendix F - two charging bases, no double counting.
- Where local standards lack a dedicated SRC column item, the concrete applies the ordinary cast column item (deducting sections per these rules), the sections the steel column items.
Further reading
- GB/T 50854-2024: Appendix E (general notes on cast components, E.7 concrete and reinforced concrete), Appendix F (F.10.4 skeleton coding, F.10.10 studs itemised);
- GB 50861-2013 Measurement Code for Urban Rail Transit Works, Appendix B elevated works B.9.1;
- GB 50205-2020 Standard for Acceptance of Construction Quality of Steel Structures, Appendix J item 3;
- DB11/T 2382-2024 Article 4.6.6 paragraph 1 (0.127 m3 per tonne);
- Jiangsu consumption standard (2026) general notes; Shaanxi new quota (2024 draft) measurement rules.
Keywords
- 型钢混凝土柱
- 劲性骨架
- 扣除型钢
- 剪力栓钉
- 现浇混凝土工程量
- 0.127m3/t
- 金属结构工程量
- GB/T 50854-2024