Automatic checking of standard citation accuracy: a five-step pipeline, six-dimension check items, and error grading

Citation checking runs in five steps: "extract -> structured parsing -> compare against the authoritative baseline database -> validity verification -> clause-level verification"; of the six check dimensions, format/code/year/validity/clause-number can be fully automated, while clause-content semantic matching requires AI + manual cross-checking; output a Standard Citation Checklist and handle errors in four grades: A fatal, B serious, C general, D advisory.

Applicable Codes

  • GB/T 1.1-2020 标准化工作导则 第1部分:标准化文件的结构和起草规则
  • GB/T 50500-2024 建设工程工程量清单计价标准
  • TB/T 10814-2024 铁路工程施工机具台班费用定额

Topic Positioning

This card gives the complete methodology of "automatic checking of standard citation accuracy": an actionable pipeline from extracting standard citations from documents, structured parsing, verification against the authoritative baseline database, to clause-level semantic verification and error grading — the deliverable is the Standard Citation Checklist.

Core Conclusions

Check basis: a standard citation must contain the triple of name + code + year; a dated reference applies only to that version, an undated reference applies the latest version (including amendments); clause-level citations must use the "chapter/section/clause/sub-clause/item" sentence patterns. Six check dimensions: (1) format completeness, (2) code-name matching, (3) year validity, (4) standard validity (replaced/repealed), (5) clause-number existence, (6) clause-content semantic matching. Dimensions 1-5 are fully automatable (rules + database comparison); dimension 6 can only be AI semantic checking + manual cross-footing closure. Five-step pipeline: citation extraction (regex/NER capturing GB, JGJ, DB, TB codes) -> parse into {name?, code, year?} triples -> compare against the authoritative baseline database outputting match/mismatch/suspect -> validity verification (dated: check whether that version is current; undated: lock the latest version, giving the replacement code when replaced, e.g., GB 50500-2013 replaced by GB/T 50500-2024) -> clause-level verification and checklist output (code | name | year | citation location | result | problem type | suggested handling). Error grading: A fatal (citing repealed/replaced standards, code-name mismatch) must be corrected; B serious (nonexistent clause number, quoting out of context) — verify against the original text item by item; C general (missing/outdated year) — complete or update; D advisory (only "per standard provisions") — add clause-level positioning.

Applicable Boundaries

Applies to checking standard citations in cost documents, technical documents, research reports, etc. Dimensions 1-5 are fully automatable; dimension 6 semantic comparison is the boundary of automation and requires manual cross-footing. Checking depends on the completeness and timeliness of the standards database; authoritative determination rests with official announcements of the standards' approving departments (MOHURD announcements, the National Public Service Platform for Standards Information).

Further Reading

Citation format and version rules per GB/T 1.1 "Directives for standardization — Part 1: Rules for the structure and drafting of standardizing documents" on dated/undated references; standard-repeal determination in the "judging whether an engineering construction standard has been repealed" card; current-version originals can be checked against new-version texts such as GB/T 50500-2024 and TB/T 10814-2024 to verify clauses and clause numbers.