Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Rules for citing engineering standards: the name + code + year triple, clause-level positioning, and version locking

Citations must carry the triple of standard name + code + year; cross-citations of clauses use the standard sentence patterns for "chapter/section/clause/sub-clause/item"; standards subject to frequent revision are cited by dated reference to lock the version; AI citations must first retrieve the original text to verify the clause number, with a citation checklist appended for manual cross-checking.

Applicable Codes

  • DBJ50/T-352-2020 工程建设工法编制标准
  • T/TMHIA 006-2022 大厚度全深式低碳就地冷再生施工技术规范
  • DB14/T 2161-2020 公路配套房屋建筑工程设计文件编制办法
  • 建标字第219号 工程建设标准局部修订管理办法

Topic Positioning

This card covers the citation rules for engineering standards/specifications: how to make citations complete with "standard name + code + year", position clauses precisely to chapter/section/clause/sub-clause/item, and lock versions. It applies to standard citations in AI-generated compliance documents, project execution plans, method statements, and other engineering texts.

Core Conclusions

  1. A citation must have all three elements: the standard's name, code, and year (e.g., "Code for project execution plan of building engineering" GB/T 50502-2009); version-less citations with only the name are forbidden.
  2. Fixed sentence patterns for cross-citing clauses: by chapter, "shall comply with the relevant provisions of Chapter X of this standard"; by section, "Section X.X"; by clause, "Clause X.X.X" ("shall comply with ..." for conformity, "shall be implemented in accordance with ..." for execution); where multiple sub-clauses govern the same condition, refine to "Clause X.X.X, sub-clause X, item X".
  3. Distinguish dated from undated references: a dated reference applies only to the version bearing the date; an undated reference applies the latest version (including all amendments). For frequently revised standards (pricing standards, safety provisions, local standards), use dated references to lock the version and prevent execution deviation from "latest version applies automatically".
  4. AI citation control: retrieve the original text and verify the clause number before citing; fabricating clause numbers from memory is forbidden; append a Citation Checklist (standard name / code-year / clause number / whether the original text exists) at the end for manual spot-checking; verification must be "against content", not only "against numbers" — an existing clause number with distorted content is a more insidious error.

Applicable Boundaries

Applies to cross-citation among engineering standard texts and AI compliance-citation scenarios; not applicable to single-point price queries or general statements without a normative basis. Note: clauses newly added by partial revisions of a standard carry an uppercase-letter suffix (e.g., a clause added between Clauses 3.2.4 and 3.2.5 is numbered "3.2.4A"); such revision traces must be recognized when checking clause numbers to avoid wrongly judging "clause does not exist".

Further Reading

Citation format requirements: DBJ50/T-352-2020 "Standard for compiling construction methods in engineering" Clause 6.1.5; clause citation sentence patterns: T/TMHIA 006-2022 "Technical specification for full-depth reclamation of thick pavement with low-carbon in-place cold recycling" Appendix C, Clause C.2.3; dated/undated reference rules: DB14/T 2161-2020 Chapter 2; partial-revision clause numbering: "Measures for the administration of partial revision of engineering construction standards" (Jianbiao Zi No. 219), Article 10.