Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-14

Current-version check of common railway/highway/urban bridge design and construction codes: TB 10064-2019, JTG D60-2015, CJJ 11-2011, TB 10005-2010, TB 10301-2020, Q/CR 9207-2017, GB 50111-2006 (2009 edition) all current, with citation pitfalls

All seven codes are current (checked 2026-09-08), with three citation pitfalls: (1) TB 10064's full title is "Code for design of concrete reinforcement of railway engineering" (contains "engineering"); (2) CJJ 11-2011 must be cited per the 2019 partial-revision text (MHURD announcement 2019 No. 222, effective 2019-09-01), and with GB 55011-2021 its clauses 3.0.8, 3.0.14, 3.0.19, 8.1.4, 10.0.2, 10.0.3, 10.0.7 (former mandatories) are repealed while the rest remain effective; (3) GB 50111-2006's current text is the 2009 edition (MHURD announcement No. 329 partial revision) — a third-party site mislabeling it "superseded" is a data error. Currency is judged by the approving authority's announcements, not third-party site status.

Applicable Codes

  • 《铁路工程混凝土配筋设计规范》TB 10064-2019(国铁科法〔2019〕20号)
  • 《铁路混凝土强度检验评定标准》TB 10425-2019
  • 《公路桥涵设计通用规范》JTG D60-2015
  • 《公路圬工桥涵设计规范》JTG 3361—2025
  • 《城市桥梁设计规范》CJJ 11-2011(2019年版,住建部2019年第222号公告)
  • 《城市道路交通工程项目规范》GB 55011-2021
  • 《铁路混凝土结构耐久性设计规范》TB 10005-2010
  • 《铁路工程基本作业施工安全技术规程》TB 10301-2020(国铁科法〔2020〕6号)
  • 《铁路混凝土工程施工技术规程》Q/CR 9207-2017
  • 《铁路工程抗震设计规范》GB 50111-2006(2009年版,住建部公告第329号)
  • https://www.nra.gov.cn/xxgk/gkml/ztjg/bzgf/jsbz/201905/t20190520_319428.shtml
  • http://www.nra.gov.cn/jglz/bzgf/gcbz/index.shtml
  • https://xxgk.mot.gov.cn/2020/jigou/glj/202509/t20250928_4177434.html
  • https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2019/art_17339_241567.html

Topic Positioning

Checking the current valid editions and citation pitfalls of a batch of common railway/highway/urban bridge design and construction codes — TB 10064-2019, JTG D60-2015, CJJ 11-2011, TB 10005-2010, TB 10301-2020, Q/CR 9207-2017, GB 50111-2006 (2009 ed.) — answering "are these the latest?" and where citations go wrong (titles, partial revisions, third-party mislabels).

Core Conclusions

As checked 2026-09 (local standard library originals + NRA/MHURD/MOT announcements + csres.com cross-checks), all seven are current. Ledger:

  1. TB 10064-2019 "Code for design of concrete reinforcement of railway engineering": current and latest. Published by NRA order Tieke Fafa [2019] No. 20, effective 2019-09-01. First edition (consolidating rebar clauses formerly scattered across discipline codes), unrevised since. Note: the full title contains "engineering" — "railway concrete reinforcement design code" is inaccurate.
  2. JTG D60-2015 "General specifications for design of highway bridges and culverts": current, MOT, effective 2015-12-01, replacing JTG D60-2004.
  3. CJJ 11-2011 "Code for design of urban bridges": number current, but citations must use the 2019 partial-revision text — MHURD announcement 2019 No. 222 of 2019-08-20, effective 2019-09-01 (clauses 10.0.2 and 10.0.7 remain mandatory; the replaced originals repealed). Further, upon GB 55011-2021 "General code for urban road traffic engineering projects", clauses 3.0.8, 3.0.14, 3.0.19, 8.1.4, 10.0.2, 10.0.3, 10.0.7 (mandatory provisions) were repealed simultaneously (their requirements absorbed by GB 55011-2021); the remaining clauses stay effective. Citing only the 2011 original or only its former mandatories both err.
  4. TB 10005-2010 "Code for durability design of railway concrete structures": current (no successor). Issued by Tie Jianshe [2010] No. 255, replacing the 2005 provisional provisions; bold-face clauses are mandatory; where inconsistent with related standards, this code governs.
  5. TB 10301-2020 "Code for safety technology of railway engineering basic operations": current and latest, Tieke Fafa [2020] No. 6, effective 2020-05-01, replacing TB 10301-2009.
  6. Q/CR 9207-2017 "Technical specification for construction of railway concrete engineering": current (effective 2017-06-01); note it is a China State Railway Group enterprise standard (Q/CR series), not an industry standard.
  7. GB 50111-2006 "Code for seismic design of railway engineering (2009 edition)": the current text is the 2009 edition — MHURD announcement No. 329 approving the partial revision effective 2009-12-01, with clauses 3.0.1A, 3.0.3, 4.0.1, 6.1.1, 6.1.2, 7.1.2, 7.2.4, 8.1.1, 8.1.2 mandatory; no update since. A third-party site (gongbiaoku) mislabels it "superseded" (treating the 2009 partial revision as a replacement) — a data error; status per MHURD announcements.

Method for "current and latest": judge by the approving authority's (NRA/MHURD/MOT) announcements — document numbers, effective dates, and replacements; third-party listings (csres.com etc.) are references only, to be cross-checked with official announcements.

Applicable Boundaries

  • Check date 2026-09-08; statuses evolve — later announcements govern.
  • Scope limited to these seven codes; not extended to same-numbered construction/acceptance standards.
  • CJJ 11-2011's pitfalls are two-dimensional — "text edition" and "mandatory-clause survival": lock the 2019 revision text and distinguish validity from mandatory status.
  • GB 50111-2006 (2009 ed.) already covers high-speed/passenger-dedicated content (the core of the 2009 revision) — no version conflict with TB 10621 etc.

Further Reading

  • CJJ 11-2011 partial-revision announcement (MHURD 2019 No. 222, via gov.cn): http://www.gov.cn/zhengce/zhengceku/2019-08/20/content_5454343.htm
  • TB 10064-2019 and TB 10425-2019 publication: Tieke Fafa [2019] No. 20 (NRA 2019-05-05), effective 2019-09-01, TB 10425-94 repealed.
  • TB 10005-2010 notice: Tie Jianshe [2010] No. 255 (2010-12-20); Annex A is the rapid test for sulfate resistance of cement/binders.
  • GB 50111-2006 partial revision: MHURD announcement No. 329 (2009-06-17, effective 2009-12-01) — the amended clauses (2009 ed.) are the current text.
  • General check channels: National Public Service Platform for Standards Information, MHURD announcements, NRA announcements, csres.com pages (e.g., GB 50111-2006 (2009 ed.)) — always verify repeal/replacement via official announcements first.

Keywords

  • 规范现行版本核查
  • TB 10064-2019
  • JTG D60-2015
  • CJJ 11-2011
  • TB 10301-2020
  • Q/CR 9207-2017
  • GB 50111-2006
  • 标准公告核验渠道