TB/T 10828-2024 railway budget quota Volume 7 information works: scope, nine-chapter structure, and the information/communication volume-selection rules (avoiding the wrong volume)
TB/T 10828-2024 "Railway works budget quota, Volume 7: information works", effective 1 January 2025 (replacing TZJ 2007-2017), applies to new and rebuilt railway works, nine chapters. Its notes direct: trenches and ducts, optical (copper) cable laying/jointing/testing/protection, branch devices, pole lines, racks (cabinets), cable racks, incoming-wiring devices and cable placing, data networks, video surveillance, power supplies, and monitoring/maintenance should use Volume 5 communication works; disaster-monitoring cable lines Volume 6 signaling; lightning protection and grounding Volume 8 power. Optical-cable termination booked separately also borrows Volume 5.
Applicable Codes
- TB/T 10828—2024 · Budget Quota of Railway Engineering (Volume 7: Information Works)
- TB/T 10826—2024 · Budget Quota of Railway Engineering (Volume 5: Communication Works)
- TB 10811—2024 · Quota of Expenses for Capital Construction Design Estimates and Budgets of Railway Projects
- TB/T 10813—2024 · Base Period Prices of Materials for Railway Engineering
- TB/T 10814—2024 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering
- TB 10074 · Code for Design of Railway Passenger Service Information Systems
- TB 10427 · Standard for Construction Quality Acceptance of Railway Passenger Service Information System Works
- TB 10185 · Technical Specification for Railway Natural Disaster and Foreign Object Intrusion Monitoring Systems
Topic Positioning
The scope, nine-chapter structure, and volume-selection rules of TB/T 10828-2024 Volume 7 (information works), plus the boundaries with neighboring volumes like communication ("find the volume by the work") — to avoid picking the wrong volume.
Core Conclusions
- Edition and basis: issued under National Railway Administration Announcement No. 28 of 2024, effective 1 January 2025, replacing TZJ 2007-2017; compiled per TB 10074 "Code for design of railway passenger service information systems", TB 10427 "Standard for constructional quality acceptance of railway passenger service information systems", and TB 10185 "Technical rules for railway natural disaster and foreign-object intrusion monitoring systems".
- Scope (general note 3 as written): "This quota applies to new and rebuilt railway works." General note 2: "This quota is a consumption standard of labor, materials, construction plant, and instruments per unit of divided works, and the basis for compiling railway design estimates (budgets). Implementation-stage prices are market-determined." 13 volumes in all; information is Volume 7, between Volume 5 communication, Volume 6 signaling, and Volume 8 power.
- Nine chapters: conduits/troughs and cable trays; optical and copper cables; sockets and cabling; computer systems; passenger service information systems; ticketing systems; access control; vehicle entrance/exit control; disaster monitoring systems.
- Generality split (volume note 3 as written): "Chapters 1-4 are the common quotas of all subsystems. Chapter 1 is building works; the rest are installation works" — conduits/troughs and slotting/drilling are civil; the rest take installation fees.
- Borrowing for excluded contents (volume note 4, key text kept): "Trenches and ducts, optical (copper) cable laying, jointing and testing, protection, branch devices and key installations, pole lines, racks (cabinets), cable racks and other facilities, incoming-wiring devices and cable placing, data networks, video surveillance, power supplies, and monitoring and maintenance should use the relevant items of Volume 5 communication works; disaster-monitoring cable lines should use Volume 6 signaling; lightning protection and grounding should use Volume 8 power."
- Demolition (volume note 5 as written): when used for demolition, "no material cost is booked; labor and plant shifts (excluding instruments) are adjusted by the factors of Table 2".
- Chapter points: "optical-cable termination is booked separately, preferably per Volume 5 communication items" (Chapter 2); "information socket installation" comprehends information-point testing (Chapter 3); cable-tray items compile grounding as bonding jumpers; divider items by 100/200 mm height; drilling items per "spot", each wall counting one spot for parallel crossings (Chapter 1).
- Volume selection by work: passenger service information systems (displays, broadcasting, inquiry/alarm, intrusion alarm, security screening, clocks), ticketing, access control, vehicle entrance/exit control, disaster-monitoring equipment, and structured cabling (trays, sockets, patch cords/pigtails, computers and network-security equipment) -> Volume 7; trenches/ducts, cable laying/jointing/testing/protection, pole lines, branch devices, racks and trays, incoming-wiring devices, data networks, video surveillance, power, monitoring/maintenance -> Volume 5 (Volume 5's note 6 reciprocates: "the 'network equipment' and 'structured cabling' quotas not contained are in Volume 7"); disaster-monitoring cable lines -> Volume 6; lightning protection/grounding and grounding-electrode fabrication -> Volume 8; FRP cable troughs -> Volume 2 bridge and culvert works.
- Pitfalls: (1) optical-cable termination must not use Volume 7 (only placing here; termination borrows Volume 5); (2) structured cabling belongs to Volume 7, not 5; (3) Volume 5's demolition Table 1 examples: buried cables 0.7, ducted cables 0.9, towers 1.5, leaky feeders and antennas 1.0, indoor racks/trays/cables 0.6, communication equipment 0.5 (same factor for labor and plant) — compare with this volume's demolition caliber (labor + plant shifts adjusted, instruments excluded).
Applicable Boundaries
- Based on the TB/T 10828-2024 text; projects before 1 January 2025 follow the old TZJ 2007-2017 (different chapters: "cabling system" one whole chapter; no vehicle entrance/exit control or disaster monitoring chapters; cable models and tray-divider items changed).
- The borrowing rules say "should use" — directional guidance where items are missing; apply per the target volume's actual items.
- No price levels here: labor, materials, and plant per TB 10811-2024, TB/T 10813-2024, TB/T 10814-2024 (general note 8).
- General calibers: "within/below" include the number, "beyond/above" exclude it; unmarked dimensions mm; bracketed material quantities carry no "material cost" or "weight" — book per design materials.
Further Reading
- TB/T 10828-2024: general notes (13-volume structure, consumption calibers, concrete/mortar handling, price bases); volume notes (generality split, borrowing, demolition Table 2); chapter notes (all nine chapters).
- Borrowing targets: TB/T 10826-2024 Volume 5 preface and note 6 ("network equipment" and "structured cabling" in Volume 7; grounding electrodes in Volume 8; FRP cable troughs in Volume 2) and demolition Table 1; TB/T 10827-2024 Volume 6 (disaster-monitoring cable lines); TB/T 10829-2024 Volume 8 (lightning protection and grounding).