VAT invoice-category determination for material procurement: contractors buying materials should obtain "sale of goods" 13% special invoices; for pure material purchases the supplier must not be asked to issue "construction services" invoices

A material supplier selling materials performs a taxable "sale of goods" and should issue goods-category invoices (e.g., *steel* rebar) at 13% for general taxpayers; the contractor's 9% "construction services" invoice to the employer is its own output — the two categories differ without affecting deduction, and the supplier should not be asked to issue "construction services" invoices. Only two situations call for supplier-issued construction-services invoices: labor-and-materials subcontracting, and sales of self-produced goods together with construction-installation services (accounted separately); pure material sales invoiced as "construction services" are a goods-invoice mismatch — non-deductible under Article 9 of the Provisional Regulations on VAT, with false-issuance risk. The current 13%/9% rates apply from 1 April 2019 per MOF/STA/GAC Announcement No. 39 of 2019.

Applicable Codes

  • 《中华人民共和国增值税暂行条例》(国务院令第691号,2017年修订)第一条、第二条、第八条、第九条、第十条
  • 财政部 税务总局 海关总署公告2019年第39号(深化增值税改革,2019年4月1日起16%→13%、10%→9%)
  • 国家税务总局公告2017年第11号(销售自产货物同时提供建筑服务分别核算计税)

Topic Positioning

Answers the invoice-category question "when a contractor procures materials, should the supplier issue a 'sale of goods' or a 'construction services' invoice": pure material purchases should obtain goods-category 13% special VAT invoices, and the supplier must not be asked to switch to "construction services" invoices; only specific situations — labor-and-materials subcontracting, and self-produced goods + installation — call for construction-services invoices from suppliers.

Core Conclusions

(1) Category-rate correspondence

  • A supplier selling steel, cement, and other goods performs a taxable "sale of goods" with goods-category items (e.g., steel rebar, non-metallic mineral products cement), 13% rate for general taxpayers;
  • A contractor providing works construction to the employer performs "construction services" (engineering services / other construction services), 9% rate;
  • Under Article 1 of the Provisional Regulations on VAT (State Council Decree No. 691, 2017 revision), "sale of goods" and "sale of services" are parallel taxable acts taxed each at its own rate; Article 2's original 17%/11% rates (2017 text) were adjusted to 13%/9% from 1 April 2019 per the "MOF/STA/GAC Announcement on Policies Concerning the Deepening of VAT Reform" (No. 39 of 2019). Each party issues its own invoices with different categories — entirely normal, without affecting the contractor's input deduction.

(2) Only two situations warrant supplier-issued "construction services" invoices

  1. Labor-and-materials specialty/trade subcontracting: the contracted substance is providing construction services (e.g., steel-structure or M&E installation subcontracting) with materials within the contracted scope — a single "construction services * engineering services" invoice should be issued (9% under general taxation, or 3% under simplified), the material cost not split out as a separate goods invoice;
  2. Sales of self-produced goods together with construction-installation services (e.g., a precast-element plant selling elements and installing them): per the "STA Announcement on Further Clarifying VAT Pilot Collection and Administration Issues" (STA Announcement No. 11 of 2017), goods sales and construction-services sales shall be accounted separately and taxed at 13% and 9% respectively, with two invoices of different categories issued.

(3) Pure material sales invoiced as "construction services" = goods-invoice mismatch, with serious consequences

  • Article 9 original text: "where the VAT withholding vouchers obtained by a taxpayer for purchased goods, services, intangibles, or immovables do not conform to laws, administrative regulations, or the relevant provisions of the competent State Council tax authority, the input tax shall not be credited against output tax" — the entire input on such an invoice is non-deductible, and input already deducted must be transferred out with back taxes;
  • An item name inconsistent with actual business is a high-risk audit indicator of false invoice issuance, with joint exposure for both buyer and seller.

(4) Practice points

  1. Purchase contracts should state "goods trade", agree on special VAT invoices, and keep invoice item name = contract name = actual delivery (four flows aligned);
  2. General-taxation projects: request 13% goods special invoices and deduct in full; simplified-taxation projects: input is non-deductible (Article 10(1)) — ordinary invoices suffice, and supplier concessions on the tax-inclusive price can be pursued instead;
  3. Where a subcontract includes materials (labor-and-materials), confirm a compliant "construction services" invoice (9%, or 3% simplified) — the material input is deducted together with the construction-services invoice.

Applicable Boundaries

  • This card addresses "pure material procurement" (the contractor purchases goods for use in construction; title passes to the contractor first); the opposite conclusions apply to labor-and-materials subcontracting and self-produced goods + installation — see Core Conclusions (2);
  • The 17%/11% rates and the 11% agricultural deduction rate in the 2017-revision text have been superseded by current rules such as Announcement No. 39 of 2019: goods 13% and construction services 9% currently; agricultural input deduction rates follow current provisions;
  • Does not cover small-scale/individual issuance, the employer-supplied-materials mode, or the general-vs-simplified choice when input is short (see the referenced cards).

Further Reading

  • Provisional Regulations of the PRC on VAT (State Council Decree No. 691, 2017 revision), Articles 1, 2, 8, 9, 10. Article 8 originally lists the deductible vouchers: VAT on special VAT invoices, special customs import payment receipts, agricultural products computed as price x rate (11% in the 2017 text), and withholding-tax receipts; Article 9 — non-compliant withholding vouchers non-deductible; Article 10 — non-deductible situations (simplified-taxation items, exempt items, collective welfare or personal consumption, abnormal losses, etc.);
  • "MOF/STA/GAC Announcement on Policies Concerning the Deepening of VAT Reform" (No. 39 of 2019, from 1 April 2019): the former 16% rate lowered to 13% and 10% to 9%;
  • "STA Announcement on Further Clarifying VAT Pilot Collection and Administration Issues" (STA Announcement No. 11 of 2017): sales of self-produced goods with construction services accounted and taxed separately;
  • See the companion knowledge card "VAT input-deduction rules for material costs: deductible voucher types (Article 8), non-deductible situations (Article 10), and the invoice-compliance floor (Article 9)" — the two cards complement each other: that one covers which invoices can be deducted, this one covers which invoice category to request at procurement.