VAT and revenue recognition under the employer-supplied materials mode: sales amount basis, simplified taxation, and the net-method judgment
Two boundaries under employer-supplied materials: for VAT, employer-supplied materials do not enter the contractor's sales amount (employer-supplied works may elect the simplified method at 3%); for accounting, where the employer procures, prices, and bears the inventory risk, the contractor is an agent recognizing revenue on the net method, and employer-supplied materials are not counted into the contractor's revenue. The contract pricing mode (stripped / included) determines the settlement treatment.
Applicable Codes
- 财税〔2016〕36号 附件2
- 中华人民共和国增值税暂行条例(2017修订)第四条、第十条
- 企业会计准则 第四十五条(完成进度法)
- 企业会计准则第14号——收入
- T/ZBD 100.4-2023 第4.5.7条
- GB/T 50500-2024
Topic Positioning
This card sorts out the contractor's two treatment boundaries under employer-supplied materials: whether, for VAT, employer-supplied materials enter the contractor's sales amount, and whether, for accounting, they are counted into the contractor's revenue. Both answers are "in principle not included", but each must be confirmed item by item against the contract pricing mode and the standard's judgment elements.
Core Conclusions
① The contract pricing mode first: the stripped mode (employer-supplied materials not in the all-in unit rate; no recovery deduction at settlement) versus the included mode (first included in the cost, then deducted at settlement per actual consumption) determines all subsequent treatment. ② VAT: a general taxpayer providing construction services for employer-supplied works may elect the simplified method, taxed at the 3% levy rate (Caishui [2016] No. 36, Annex 2), with input tax non-deductible (Interim Regulation on VAT, Article 10); employer-supplied materials are procured by the employer — ownership, invoices, and input deduction all sit with the employer, not in the contractor's sales amount, generating neither output nor input for the contractor; the supplier invoices the employer directly, closing the three-flow match. Electing the general method (9%) means output minus input (Article 4), but employer-supplied works have shallow input pools, so practice mostly elects the simplified method. ③ Revenue recognition: judge principal versus agent per Accounting Standard No. 14 — where the employer procures, prices, and bears inventory risk, the contractor is an agent recognizing only the construction service revenue on the net method, with employer-supplied materials excluded; long-term construction recognizes revenue by completion progress (Article 45 of the standards). Where the contractor provides custody and coordination services, it may charge the main contractor's attendance and coordination provisions, recognized separately.
Applicable Boundaries
Applies to employer-supplied works where the employer supplies materials; if the contractor has procurement decision power, bears the risk of loss or damage, and pays for the materials first, it is the principal and should include the materials in revenue on the gross method. The simplified-method election is limited to general taxpayers. Revenue assessment must be read on the net basis — never take the total cost including employer-supplied materials as revenue, or the revenue profit margin is badly distorted.
Further Reading
Caishui [2016] No. 36, Annex 2 (employer-supplied works may elect the simplified method); Interim Regulation on VAT, Articles 4, 10 (output minus input; non-deductible inputs); Accounting Standard No. 14 — Revenue (principal/agent provisions) and Article 45 of the Accounting Standards (completion progress method); Measures for the Administration of Invoices, Article 19; T/ZBD 100.4-2023 Clause 4.5.7 (actual consumption of employer-supplied materials = requisition quantity − inventory); GB/T 50500-2024, employer-supplied materials and VAT accrual clauses.
Keywords
- employer-supplied (free-issue) materials
- 甲供工程
- value added tax (VAT)
- simplified VAT scheme
- 净额法
- 总额法
- 收入确认
- 主要责任人
- 代理人
- 销售额口径