employer-supplied (free-issue) materials
Concept Guide
Concept
In Chinese construction practice, employer-supplied (free-issue) materials means materials procured and supplied by the employer for permanent works, such as steel, cement, cables and key equipment. The employer sources them, pays the supplier, and delivers them to site; the contractor receives, stores, uses and is responsible for them. Under GB 50500 and local cost-management rules, tender documents and contracts must state name, specification, quantity, delivery time, place, and deduction method. At settlement, the employer deducts the material value from the contract price, usually actual supplied quantity times agreed unit rate, and may separately add a procurement/storage fee. Published price information, quota norms and the all-in unit rate are common pricing references; the contractor's all-in unit rate should exclude the employer-supplied portion to avoid double counting. If actual issued quantity differs from settlement quantity, the contract governs over- or under-supply.
FIDIC Mapping
FIDIC Red Book and Yellow Book Sub-Clause 2.6, Employer-Supplied Materials and Employer's Equipment, is the direct anchor. It requires the Specification or Employer's Requirements to state details, times, arrangements, rates and prices; the employer makes them available accordingly. The contractor is responsible for each item of Employer's Equipment while in its possession, and risks and insurance interact with Sub-Clause 17.2 (liability for care), Sub-Clauses 17.4/17.5 (indemnities) and Clause 19 (insurance; Clause 18 is Exceptional Events in the 2017 suite). Key differences: FIDIC relies on contract-specified rates and prices rather than Chinese published prices and quota norms; risk allocation is expressly linked to the care/liability and indemnity provisions (Clause 17) and to insurance (Clause 19); notice and claim procedures are stricter. Chinese procurement/storage fee has no automatic FIDIC equivalent. When using this concept internationally, do not assume deduction rules carry over: if rates, prices, custody and risk are not written into the Specification and Particular Conditions, claims may arise.
| Chinese Term | English Term | FIDIC Term | Relation | Notes |
|---|---|---|---|---|
| 甲供材料 | employer-supplied (free-issue) materials | FIDIC Red/Yellow Book Sub-Clause 2.6 Employer-Supplied Materials and Employer's Equipment | adjacent | FIDIC 2.6 直接规定雇主列明材料细节、时间、安排、费率与价格并使其可用;中国制度还叠加信息价、定额、采保费和扣回规则,FIDIC 无自动采保费与信息价机制。 |
| 甲供设备 | Employer's Equipment | Sub-Clause 2.6 Employer's Equipment | adjacent | 2.6 将设备与材料并列,但设备通常涉及更严的照管、保险与接收义务;中国甲供设备在计价扣回上常单独列项,不宜与材料混同。 |
| 发包人风险 | employer-borne risks | Sub-Clause 17.2 [Liability for Care of the Works](2017 版已无 'Employer's Risks' 术语,该概念为 1999 版 17.3 口径) | adjacent | FIDIC 2017 以 17.1/17.2 安排照管责任、17.4/17.5 安排双方赔偿,取代 1999 版的 Employer's Risks 清单;中国甲供材料的风险分配多在合同专用条款约定,现场保管责任常归承包人。 |
| 工程保险 | insurance | Sub-Clause 19.2 [Insurance to be Provided by the Contractor](2017 版保险在第 19 条,第 18 条为 Exceptional Events) | adjacent | 2017 版 18.3 是除外事件下的减损义务(Duty to Minimise Delay),保险除外属第 19 条体系并与 2.6 供应安排衔接;中国合同对甲供材料的保险责任约定分散,国际项目须明确谁投保、谁受益、免赔与除外。 |
Updated 2026-09-13
- 01
The price-taking order for deducting employer-supplied materials where the contract is silent: fix the 2013 / 2024 pricing basis first, then descend supply-contract unit price -> the signed Schedule of Employer-Supplied Materials -> the parties' pre-purchase confirmed price -> the Civil Code statutory fallback, with the price and quantity rules of cost expert assessment
Silence never means a blanket published price or market price. Under GB/…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.6.1条GB/T 50500-2024 第3.6.2条GB/T 50500-2024 第3.6.3条2026-11-11 - 02
Bases of claim and evidentiary elements for suspension caused by late delivery of employer-supplied (free-issue) materials: the claim bases in Civil Code Arts. 803/804, costs and profit under GB/T 50500-2024 cl. 3.6.1/3.6.5, judicial relief where extension of time is uncertified, an elements table with itemised evidence, the 28-day claim procedure, and exclusion from the priority right
Yes, a claim lies, and it goes beyond an extension of time: under Civil…
《中华人民共和国民法典》第八百零三条、第八百零四条、第五百八十四条、第五百九十一条GB/T 50500-2024 第3.6.1条、第3.6.5条、第8.11.3条、第8.11.5条、第8.11.9条、第8.11.10条法释〔2020〕25号《建工解释(一)》第十条、第四十条2026-10-29 - 03
Dividing price and quantity gaps of employer-supplied (free-issue) materials: price gaps to the employer and outside the contractor's adjustment scope, quantity gaps bounded by the effective wastage rate, custody and freight splitting at the delivery point with unloading (GB/T 50500-2024 clauses 3.6.1, 3.2.4, 3.6.3, 6.2.4, 8.7.5; against GB 50500-2013 clause 3.2.1)
Price gaps are the employer's and never enter the contractor's adjustmen…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.6.1条GB/T 50500-2024 第3.6.2条GB/T 50500-2024 第3.6.3条2026-10-25 - 04
Deduction of employer-supplied (free-issue) materials from payments and allocation of costs: deduction mechanism, procurement/custody fee and wastage responsibility (GB/T 50500-2024, T/ZBD 100.4-2023)
Where employer-supplied (free-issue) material prices are not included in…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.2.4条、第3.2.11条、第3.6.1条、第3.6.2条、第3.6.3条、第3.6.4条、第3.6.5条、第3.6.6条、第3.7.4条、第6.2.4条、第8.5节、Ch. 8、App. G.1Table G.1.1GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第3.2.1条、第3.2.3条、第3.2.4条、第3.2.5条、第10.3.5条、App. L.1T/ZBD 100.4-2023 · Work Guideline for Construction Cost Appraisal 第4.5.7条2026-10-25 - 05
Pricing and clawback of over- and under-supply of employer-provided (free-issue) materials: at the supply-contract price, not published price information or market price (GB/T 50500-2024 clause set 3.6)
Contractor-caused over-drawing of free-issue materials is charged at the…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.6.1~3.6.6条GB/T 50500-2024 第3.2.4条、第3.7.4条GB/T 50500-2024 App. G.1 Table G.1.1 发包人提供材料一览表2026-10-18 - 06
GB/T 50500-2024 charging scope of the main contractor's attendance and coordination provisions: charged on free-issue materials and the employer's specialist subcontracts, not on the contractor's own subcontracting
Per GB/T 50500-2024, free-issue materials (materials provided by the emp…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准2026-09-25 - 07
VAT and revenue recognition under the employer-supplied materials mode: sales amount basis, simplified taxation, and the net-method judgment
Two boundaries under employer-supplied materials: for VAT, employer-supp…
财税〔2016〕36号 附件2中华人民共和国增值税暂行条例(2017修订)第四条、第十条企业会计准则 第四十五条(完成进度法)2026-09-25 - 08
Identifying duplicate measurement in subcontract final accounts: a four-layer investigation method — contract interfaces, stage settlements during construction, measurement rules, and cost composition
Identify duplicate measurement in subcontract final accounts by investig…
T/ZBD 100.5-2023 工程结算审核作业指引GB/T 50500-2024 建设工程工程量清单计价标准DB37/T 5130-2018 建设工程造价咨询服务规范2026-09-25 - 09
Free-issue materials (by the employer) in final account: deduction basis, consumption verification, over-draw and over-consumption liability, and supply-mode conversion pricing (GB/T 50500-2024, T/ZBD 100.5-2023)
Free-issue material amounts are deducted from the final account amount p…
GB/T 50500-2024 建设工程工程量清单计价标准T/ZBD 100.5-2023 建设工程结算审核作业指引T/ZBD 100.4-2023 建设工程造价鉴定作业指引2026-09-25 - 10
Identifying abnormal over-consumption in material requisitions: verification paths and an anomaly signal checklist
Five steps to identify abnormal over-consumption: set the baseline (plan…
GB/T 50500-2024 第3.6.2、3.6.3条GB/T 50875-2013 第2.3.16条T/ZBD 100.4-2023 第4.5.7条2026-09-25