Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-18

Fixing the income-tax basis of fixed assets, the start and stop of straight-line depreciation, and the minimum depreciation lives of five asset classes (EIT Implementation Regulation Article 60)

Under Article 60 of the EIT Implementation Regulation (State Council Decree No. 714, 2019 revision), fixed assets take historical cost (expenditure actually incurred on acquisition) as their tax basis, not adjustable for appreciation or depreciation during holding; the basis is fixed by six acquisition cases (purchased: purchase price + related taxes + other costs to bring the asset to intended use; self-built: expenditure before final account settlement; finance-leased: total contract payments + related costs, or fair value where the contract sets none; found in surplus: full replacement value; donated / invested / non-monetary exchange / debt restructuring: fair value + related taxes; reconstructed: increased by the reconstruction expenditure, save the items under EIT Law Article 13(1)(2)). Straight-line depreciation is deductible, charged from the month after the asset enters use and stopped from the month after use ceases; the estimated net residual value, once set, may not change. Minimum lives: buildings and structures 20 years; machinery and other production equipment 10 years; instruments, tools and furniture 5 years; transport means other than aircraft, trains and ships 4 years; electronic equipment 3 years.

Applicable Codes

  • 中华人民共和国企业所得税法实施条例(国务院令第714号,2019修订)第六十条
  • 中华人民共和国企业所得税法(主席令第23号,2018修正)第十一条、第十三条
  • 企业会计准则(财政部令第5号)第三十条
  • 计资〔1984〕2580号 第二十六条
  • 城镇供水定价成本监审办法(国家发展改革委、住房城乡建设部令第45号)第十三条

Positioning

For fixed assets under the income tax regime: how the tax basis is fixed, how depreciation runs and for how many years at minimum - i.e. Article 60 of the EIT Implementation Regulation: the six methods of fixing the basis, the depreciation method and its start/stop, the minimum lives of five asset classes, and the historical-cost principle against the accounting treatment.

Core conclusions

Historical cost principle (Article 60): "An enterprise's assets - fixed assets, biological assets, intangibles, long-term deferred expenses, investment assets, inventories etc. - take historical cost as their tax basis. Historical cost means the expenditure actually incurred by the enterprise in acquiring the asset. Appreciation or depreciation of assets during holding does not adjust the tax basis unless the finance and tax authorities of the State Council provide for recognition of the gain or loss."

Definition of fixed asset (same article): "A fixed asset under EIT Law Article 11 means a non-monetary asset held by an enterprise for producing goods, supplying services, renting out or business administration, used for more than 12 months, including houses, buildings, machinery, transport means and other equipment, instruments and tools related to production and business."

Six methods of fixing the tax basis (same article): (1) purchased - purchase price plus related taxes paid plus other expenditure directly attributable to bringing the asset to its intended use; (2) self-built - expenditure incurred before the project's final account is settled; (3) finance-leased - the total payments agreed in the lease contract plus related costs incurred by the lessee in concluding it; where the contract sets no total, the asset's fair value plus those costs; (4) found in surplus - the full replacement value of the same class of asset; (5) acquired by donation, investment, non-monetary asset exchange or debt restructuring - the asset's fair value plus related taxes paid; (6) reconstructed - increased by the reconstruction expenditure incurred, save expenditure under EIT Law Article 13(1) and (2).

Depreciation method and start/stop (same article): "Depreciation of fixed assets computed on the straight-line method is deductible. Depreciation is charged from the month after the month the fixed asset enters use; for assets ceasing use, depreciation stops from the month after the month of cessation. The enterprise shall reasonably set the estimated net residual value from the asset's nature and use; once set it may not be changed."

Minimum depreciation lives (same article, unless the State Council finance and tax authorities provide otherwise): (1) houses and buildings - 20 years; (2) aircraft, trains, ships, machinery and other production equipment - 10 years; (3) instruments, tools and furniture related to production and business - 5 years; (4) transport means other than aircraft, trains and ships - 4 years; (5) electronic equipment - 3 years.

Accounting and construction-period interest: Accounting Standards (MoF Decree No. 5) Article 30 - fixed assets "shall be recorded at actual cost on acquisition"; "borrowing interest and related costs incurred before delivery for use, or after use but before the final account is concluded, and exchange differences on foreign-currency borrowings, enter the value of the fixed asset; after that they enter current profit or loss." Ji Zi [1984] No. 2580 Article 26 likewise: "on completion of an appropriation-to-loan project, the construction-period loan interest enters the value of the fixed asset." For price-regulated cost verification (Urban Water Supply Pricing Cost Examination Measures, Article 13), "the original value of fixed assets is in principle verified on historical cost", with unused assets, government-subsidised or freely contributed assets and revaluation gains depreciated no further.

Applicable boundaries

  • The minimum lives are a floor for tax deduction, not a mandated value for financial appraisal or accounting estimates: accounting lives follow useful life, appraisal follows the project horizon and industry practice - the three may differ (temporary differences); estimate documents must not substitute tax lives for accounting lives.
  • Article 60 is the general rule; accelerated depreciation, one-off deduction or shortened lives under preferential policies "otherwise provided" follow those provisions.
  • No adjustment of tax basis for write-downs or write-ups save where permitted - revaluation gains adjust neither the basis nor depreciation (same in pricing cost review).
  • Whether reconstruction adds to the basis requires first excluding the capitalised expenditure items of EIT Law Article 13(1) and (2).

Further reading

  • EIT Implementation Regulation (Decree No. 714, 2019 revision) Article 60 (definition, six methods, straight line, start/stop, minimum lives).
  • EIT Law (Presidential Decree No. 23, 2018 amendment) Articles 11 (non-depreciable assets) and 13 (non-deductible and capital expenditure).
  • Accounting Standards (Decree No. 5) Article 30; Ji Zi [1984] No. 2580 Article 26; Urban Water Supply Pricing Cost Examination Measures (NDRC/MoHURD Order No. 45) Article 13 (historical cost, residual 3%~5%, straight-line).

Keywords

  • 固定资产计税基础
  • 历史成本
  • 最低折旧年限
  • 直线法折旧
  • 预计净残值
  • 重置完全价值
  • 企业所得税法实施条例第六十条
  • 建设期利息资本化

Cited By