Overall plumbness and overall planar bending tolerances of steel main structures: GB 50755-2012 Clause 14.5.5 (workmanship control) vs GB 50205 Tables 10.3.4 / 11.3.5 (acceptance)
For multi-story and high-rise steel structures the overall plumbness tolerance of the main structure is H/2500 + 10mm (H = height) and not greater than 50.0mm; for single-story steel structures H/1000 and not greater than 25.0mm; overall planar bending is L/1500 (L = width) and not greater than 25.0mm in all cases. Workmanship control per GB 50755-2012 Clause 14.5.5 (H/2500 + 10mm, <= 50.0mm); acceptance per GB 50205 Table 10.3.4 (single-story) / Table 11.3.5 (multi-story and high-rise).
Applicable Codes
- GB 50755-2012 · Code for Construction of Steel Structures 第14.5.5条
- GB 50205-2001 · Code for Acceptance of Construction Quality of Steel Structures 第10.3.4条、第11.3.5条(现行版为 GB 50205-2020《钢结构工程施工质量验收标准》)
Topic Positioning
Quick-reference for the allowable overall plumbness and overall planar bending deviations of steel main structures: workmanship control per Clause 14.5.5 of GB 50755-2012 "Code for construction of steel structures" (construction surveying chapter); acceptance per GB 50205 "Code for construction quality acceptance of steel structure works" Table 10.3.4 (single-story) / Table 11.3.5 (multi-story and high-rise), with directly applicable tolerance formulas, inspection quantities, and test methods.
Core Conclusions
1. Workmanship control (GB 50755-2012 Clause 14.5.5, current) The allowable overall plumbness deviation of the main structure is H/2500 + 10mm (H = height) but not greater than 50.0mm; the allowable overall planar bending deviation is L/1500 (L = width) and not greater than 25.0mm.
2. Acceptance (GB 50205, by structural form)
- Single-story steel structures (Clause 10.3.4, Table 10.3.4): overall plumbness H/1000, not greater than 25.0mm; overall planar bending L/1500, not greater than 25.0mm.
- Multi-story and high-rise steel structures (Clause 11.3.5, Table 11.3.5): overall plumbness H/2500 + 10.0, not greater than 50.0mm; overall planar bending L/1500, not greater than 25.0mm.
- H is the main-structure height and L the main-structure length (width), both in mm.
- Inspection quantity: all principal elevations checked; for each elevation checked, at least one interior column line in addition to the two corner column lines.
- Test methods: theodolite, total station, etc.; for multi-story and high-rise overall plumbness, laser theodolite or total station, or computation from the algebraic sum of the allowable per-column-section plumbness deviations; overall planar bending may likewise be computed from the algebraic sum of the generated allowable deviations.
3. Correspondence of the two calibers The GB 50755-2012 workmanship control values match the GB 50205 multi-story and high-rise acceptance values (H/2500 + 10mm, <= 50.0mm), i.e., process control must satisfy the high-rise acceptance standard; the single-story acceptance value is stricter (H/1000, <= 25.0mm) with a smaller absolute cap.
Applicable Boundaries
- Applies to overall plumbness and planar bending control and acceptance surveying after completion of steel main-structure erection; GB 50205 Table 10.3.4 is for single-story erection works and Table 11.3.5 for multi-story and high-rise erection works - the two must not be interchanged.
- Version note: GB 50205-2001 is superseded; the current edition is GB 50205-2020 "Standard for construction quality acceptance of steel structure works". The figures here derive from the 2001 text (Tables 10.3.4 / 11.3.5); the 2020 edition did not change these tolerance values, but formal acceptance shall follow the current GB 50205-2020 text. GB 50755-2012 "Code for construction of steel structures" is current and directly applicable to workmanship control.
- This card covers only overall (macro) deviations of the main structure; local tolerances such as per-column-section / per-member plumbness and beam levelness are outside its scope - consult the corresponding item tables of GB 50205.
Further Reading
- GB 50755-2012 "Code for construction of steel structures" Clause 14.5.5 (construction surveying chapter).
- GB 50205 "Code for construction quality acceptance of steel structure works" Clause 10.3.4 Table 10.3.4 (single-story erection) and Clause 11.3.5 Table 11.3.5 (multi-story and high-rise erection); current edition GB 50205-2020 "Standard for construction quality acceptance of steel structure works".
- Related extension: survey monitoring and assembly tolerances in steel erection - see the "key points of curved steel truss girder assembly and erection" card (truss assembly sequence, alignment survey monitoring, and tolerances).
Keywords
- 钢结构
- 整体垂直度
- tolerance (permissible deviation)
- 整体平面弯曲
- GB 50205
- GB 50755
- H/2500
- 施工测量
- 钢结构安装验收