Fire-stopping requirements where building vertical shafts and services cross fire-separating elements: locations (shafts at every floor slab; crossings of fire walls / partitions / shaft walls / deformation joints / slab openings), material selection (by gap and annular space size), fire performance (no lower than the penetrated element, and no less than 1h)
GB 55037-2022 clause 6.3.3 (mandatory in full): except for ventilation, supply-air and smoke-exhaust duct shafts, gas pipe shafts requiring ventilation and other shafts with special requirements, which need not be separated at the floor slabs between storeys, all other shafts shall take fire-separation measures at every floor slab, and the fire performance of the separation assemblies shall be no lower than that of the slab. Clause 6.3.4: the openings where electrical circuits and pipes of all kinds pass through fire walls, fire partitions, shaft walls, building deformation joints and floor slabs shall be fire-stopped, and the fire performance of the stopping assemblies shall be no lower than the requirement of the separated element. The fire resistance of cable stopping assemblies shall also be no less than 1h (GB 50217-2018 clause 7.0.3 item 4), and material performance shall comply with GB 23864.
Applicable Codes
- GB 55037-2022 第6.3.3条、第6.3.4条
- GB/T 51410-2020 第3.0.2、3.0.4、3.0.7、3.0.15条、第5.3.2条
- GB 50168-2018 第8.0.2条、第8.0.8条
- GB 50217-2018 第7.0.3条
- GB 23864 防火封堵材料
- GA 304 塑料管道阻火圈
- T/JSTJXH 18-2022 第6.5.1条
- https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=EB404BDD6BE5BC24EFF54513C4B89B46
- https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=2E9485D25A16E6221210477278938EB8
Topic positioning
How fire stopping is provided for vertical shafts in buildings - cable shafts, pipe shafts and the like - and for openings where electrical circuits and pipes of all kinds pass through fire walls, fire partitions, shaft walls, deformation joints and floor slabs: which locations are stopped, with which materials (selected by gap and annular space size), and to what fire performance.
Core conclusions
I. Locations to be stopped (mandatory)
GB 55037-2022 General code for fire protection of buildings, clause 6.3.3, verbatim: 'Except for ventilation duct shafts, supply-air duct shafts, smoke-exhaust duct shafts, gas pipe shafts requiring ventilation and other shafts with special requirements, which need not be separated at the floor slabs between storeys, all other shafts shall take fire-separation measures at every floor slab, and the fire performance of the fire-separation assemblies shall be no lower than that of the floor slab.' Commentary: pipe shafts, cable shafts, lift shafts and other vertical shafts are channels of vertical smoke and fire spread; every lift shaft in a building shall be independent, combustible gas and liquid pipes shall not be laid in or through them, and lift landing doors shall have adequate fire integrity; except for shafts not separated between storeys, each shaft shall be separated and stopped at every floor slab with non-combustible materials and fire-stopping assemblies equivalent to the slab's fire resistance, and the assemblies shall work in concert with the member or structure.
GB 55037-2022 clause 6.3.4, verbatim: 'Openings where electrical circuits and pipes of all kinds pass through fire walls, fire partitions, shaft walls, building deformation joints and floor slabs shall be fire-stopped. The fire performance of fire-stopping assemblies shall be no lower than the fire performance required of the fire-separating element.' The commentary confirms: all pipes (water supply and drainage, combustible gas or liquid, dust extraction and other process lines, ventilation and smoke control ducts) together with cables and electrical trunking crossing the above elements shall have their holes and gaps stopped; technical measures follow the current national standard GB/T 51410 Standard for application of building fire stopping.
GB 50168-2018 Standard for construction and acceptance of cable line installation works, clause 8.0.2, verbatim: 'The following openings shall be tightly stopped with fire-stopping materials: 1 openings where cables pass through walls and floor slabs; 2 openings where cables enter panels, cabinets, boxes and enclosures; 3 entries and exits where cables enter or leave cable shafts; 4 openings where cable trays pass through walls and floor slabs; 5 ports where cable conduits enter cable trays, cable shafts, cable trenches and cable tunnels.'
II. Material selection (by stopping location type and gap / annular space size)
GB/T 51410-2020 clause 3.0.2, verbatim: 'Building fire-stopping materials shall be determined by the type of stopping location, the size of the gap or opening and the fire performance requirement, and shall comply with: 1 for construction joints, flexible organic mastic, fire-resistant sealants, fire-resistant seal coatings and combinations thereof are advisable; 2 for penetrations with small annular spaces, flexible organic mastic, fire-resistant sealants, foam stopping materials, fire wrap bands, fire collars and combinations thereof are advisable; 3 for penetrations with large annular spaces, inorganic mastic, fire bags, fire blocks, fire-stopping boards, fire wrap bands, fire collars and combinations thereof are advisable.' Band boundaries (commentary to the same clause): generally 15mm to 50mm counts as a small annular space; above 50mm counts as large. Construction-joint measures are in chapter 4 of that standard, penetration measures in chapter 5.
GB/T 51410-2020 clause 5.3.2 (cable penetrations), verbatim: '1 where the annular space of the penetration is small, intumescent organic fire-stopping materials shall be used; 2 where the annular space is large, inorganic fire-stopping materials shall be used; or mineral wool or similar backing stuffed and covered with intumescent organic fire-stopping material; or fire-stopping boards or fire blocks used, with the gaps between cables and the boards or blocks stuffed with intumescent fire-stopping material; 3 gaps between cables shall be stopped with intumescent fire-stopping material; 4 for high-voltage cables, elastic fire-stopping materials shall be used.'
Inorganic mastic practice (GB/T 51410-2020 clause 3.0.4): 'Where inorganic mastic is used, its thickness shall match the thickness of the penetration, and after stopping the remaining gaps shall be stuffed with organic fire-stopping material to a depth of no less than 15mm.' ('m m' in the printed clause is mm.) Larger openings need suitable stiffness-enhancing measures.
Fire-resistant seal coating (clause 3.0.7): 'The applied thickness should be no less than 3mm and the dry thickness no less than 2mm; the length shall be the full length of the construction joint and the width greater than that of the joint; the interior of the joint shall be fully stuffed with mineral wool or similar backing. The lap width of the coating shall be no less than 20mm.'
Cable-tray penetrations (T/JSTJXH 18-2022 clause 6.5.1): all cable trunking shall be stopped both outside and inside the trunking; for large gaps a fire-stopping board system is advisable, with fire-resistant sealant in the gap between board and penetrated element; where gaps are too large for board stiffness, first reduce the opening or use fire bags with refractory boards (silicate or glass-magnesium boards), sealing the gaps between refractory board, penetrated element and tray with flexible organic mastic; for small gaps, stuff with mineral wool or similar backing and cover with elastic fire-resistant sealant or flexible organic mastic.
III. Fire performance and product performance
- General principle: the fire performance of stopping assemblies shall be no lower than the requirement for the penetrated element (wall, slab) (GB 55037-2022 clause 6.3.4; GB 50217-2018 clause 7.0.3 item 4).
- Floor value (power engineering cables): GB 50217-2018 clause 7.0.3 item 4: 'The fire resistance of fire-stopping assemblies such as fire stops, fire barriers and fire segments shall be no lower than that of the penetrated element (building walls, floor slabs and the like) and no less than 1h; their burning behaviour, physico-chemical properties and fire performance shall comply with the current national standard GB 23864 Fire-stopping materials, and test conditions shall match actual service conditions.'
- Product performance basis (GB/T 51410-2020 clause 3.0.15): the burning behaviour, physico-chemical properties and assembly fire performance of inorganic mastic, flexible organic mastic, fire-resistant sealants, foam stopping materials and the like shall comply with GB 23864 Fire-stopping materials; the burning behaviour, physico-chemical properties and fire performance of fire collars shall comply with GA 304 Fire collars for plastic pipes.
- Testing under actual conditions is mandatory: assembly fire performance depends on gap width and depth, penetrant type and opening size, and the type and nature of the penetrated element; complex cases (penetrants including pipes over 40mm in diameter, cable fill ratio above 45%) require dedicated testing - type-test results cannot be substituted.
- Structural support (GB 50217-2018 clause 7.0.3 commentary): fire bags and fire mastic have no self-adhesion and must be carried by support members; for slab and shaft stops with openings over 0.4m x 0.4m, board strength alone cannot assure the safety of inspection personnel - steel mesh, steel beams or carrier plates are needed.
- Workmanship appearance (GB 50168-2018 clause 8.0.8, verbatim): 'Cable openings shall be stopped tight and reliable, without visible cracks or visible voids, with a flat stop surface; larger openings shall be lined with refractory boards before stopping. Organic fire-stop mastic shall show no light transmission, air leakage, crazing, spalling or hardening; inorganic fire-stop mastic shall show no powdering or cracking. Fire bags shall be stacked tight and firm, neat in appearance, and shall not transmit light.'
Applicability boundaries
- GB 55037-2022 is a compulsory code in full; where current standards disagree, it prevails; GB/T 51410-2020, GB 50168-2018 and GB 50217-2018 govern detailed workmanship and acceptance.
- The clause 6.3.3 exceptions cover only ventilation, supply-air and smoke-exhaust duct shafts, gas pipe shafts requiring ventilation and shafts with special requirements; cable shafts, pipe shafts and other shafts take no exception and must be separated at every floor slab.
- 'No higher than the fire resistance of the penetrated element' must not be read in reverse: design takes no lower than the separation requirement; the value depends on the element's own fire rating - consult the design documents and the applicable fire codes.
- 1h is the fallback floor (cable stopping); where the penetrated fire wall has a higher rating (e.g. 3.0h between oil-immersed transformers), the opening stop matches it.
- Pricing of stopping work (per point / m2 / by mass, materials separate) is outside this card.
Further reading
- GB 55037-2022 General code for fire protection of buildings, clauses 6.3.3 and 6.3.4 (chapter 6, building construction and finishes).
- GB/T 51410-2020 Standard for application of building fire stopping, clauses 3.0.2, 3.0.4, 3.0.7, 3.0.15, chapter 4 (construction joints) and chapter 5 (penetrations; 5.3.2 covers cable penetrations).
- GB 50168-2018 Standard for construction and acceptance of cable line installation works, clauses 8.0.2 and 8.0.8 (chapter 8, fire-retardant measures for cable lines).
- GB 50217-2018 Standard for design of electric power engineering cables, clause 7.0.3 and its commentary; GB 23864 Fire-stopping materials; GA 304 Fire collars for plastic pipes.
- T/JSTJXH 18-2022 Technical standard for fire stopping in urban rail transit works, clause 6.5.1 (cable-tray penetrations, with figures 6.5.1-1 to 6.5.1-3 for three gap cases).
- National standards full-text system (version check): https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=EB404BDD6BE5BC24EFF54513C4B89B46 and https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=2E9485D25A16E6221210477278938EB8
Keywords
- 防火封堵
- 竖井每层封堵
- GB 55037-2022
- GB T 51410-2020
- GB 23864
- 环形间隙
- 贯穿孔口
- 耐火极限