Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-09

Construction of screed division joints and the charging boundary of their sealing: the cement mortar screed itself is not in the waterproofing quota and is chargeable, but membrane seams, edge terminations and screed joint sealing are already included and must not be recharged

The dividing line runs between the screed itself and the sealing of the screed: per the volume notes of TB/T 10834-2024 Volume 13 Station and Yard Works, the waterproofing quota does not include the cement mortar screed, which may be charged separately under the relevant quotas; but the seams and edge terminations of the waterproof membrane and the sealing of the screed are already included and must not be charged again. So under the railway station waterproofing items, sealing the screed division joints with waterproof mastic is not listed separately; only in systems carrying sealing as an independent item by metre (e.g. DB11/T 2382-2024 Table A.9.6-2 sealing, A-9-268 roof concrete division joint sealing, A-9-269 movement joint sealing) is it listed by metre under those items. Construction-wise the division joints are mandatory: screed division joints at spacing preferably not over 6 m both ways, width preferably 5-20 mm, with division joints also between the screed and parapets and the walls of roof-mounted tank rooms, stair enclosures and vent cowls, the joints filled with sealing mastic (DB11/T 1832.9-2022 Article 3.4.8).

Applicable Codes

  • TB/T 10834-2024 Vol. 13 站场工程 册说明 Ch. 2
  • DB11/T 2382-2024 App. A Table A.9.6-2
  • DB11/T 1832.9-2022 第3.4.8条

Scope of the question

Whether sealing the screed division joints with waterproof mastic is charged separately: first separate the screed itself from the sealing of the screed, then read what the chapter notes of the quota system in use provide.

Core conclusions

  1. Railway station works basis (TB/T 10834-2024 Railway Works Budget Quota Manual, Volume 13 Station and Yard Works, volume notes, Chapter 2):
  • The waterproofing quota does not include the cement mortar screed; where needed, charge separately under the relevant quotas - the screed itself is not in the waterproofing items and is chargeable;
  • The seams and edge terminations of the waterproof membrane and the sealing of the screed are already included in the quota and must not be charged again - membrane seams, terminations and screed sealing are all inside the waterproofing items' work content / consumptions, not to be listed separately;
  • The same chapter: this chapter covers masonry, pointing and rendering, movement joints and damp-proofing, and waterproofing, 2 sections; waterproofing works not compiled here may use the relevant items of Volume 10 Buildings.
  • Conclusion: under this system, sealing the screed division joints with waterproof mastic is not charged again, but the screed itself remains chargeable.
  1. In systems carrying sealing as an independent item, list per that system's rules - Beijing DB11/T 2382-2024 Appendix A Table A.9.6-2 sealing is measured in metres, work content joint cleaning, filling and pouring:
  • A-9-268 roof concrete division joint sealing: comprehensive class-2 labour 0.0490 workday/m, insulation sealing strip 1.0500 m/m, sealing mastic 0.3255 kg/m;
  • A-9-269 movement joint sealing: comprehensive class-2 labour 0.0610 workday/m, insulation sealing strip 1.0500 m/m, sealing mastic 2.1630 kg/m. So there sealing is a separate item measured by joint length in metres, choosing by joint nature (roof concrete division joint / movement joint); the mastic contents differ about 6.6x - mixing them up departs markedly.
  1. Construction basis (division joints are mandatory and must be sealed): DB11/T 1832.9-2022 Workmanship Rules for Building Works, Part 9 Roofing Works, Article 3.4.8: the screed shall have division joints at spacing preferably not over 6 m both ways, width preferably 5-20 mm; and division joints shall be provided between the screed and parapets and the walls of roof-mounted tank rooms, stair enclosures, vent cowls etc., the joints filled with sealing mastic.

Applicability limits

  • Whether a recharge is barred is decided by the chapter (volume) notes of the system in use; changing system or version requires re-reading the notes - conclusions must not be carried across systems.
  • The included-sealing wording targets the waterproofing items (membrane seams, terminations, screed sealing); where the design provides otherwise or the system carries independent sealing items, list per those items - that is not double counting.
  • Joint spacing up to 6 m and width 5-20 mm are workmanship recommendations (preferably); where the design differs, the design governs.
  • Before deciding BOQ / quota itemisation, run a double-counting check on the principle: what the work content includes is not charged again; what is separately itemised is not charged twice.

Further reading

TB/T 10834-2024 Railway Works Budget Quota Manual, Volume 13 Station and Yard Works, volume notes Chapter 2 (charging boundary of waterproofing and screed); DB11/T 2382-2024 Appendix A Table A.9.6-2 sealing (A-9-268, A-9-269) and the related Table A.9 roofing and waterproofing items; DB11/T 1832.9-2022 Article 3.4.8 (screed division joint construction); the corresponding requirements on division joints and sealing in GB 50345 (technical code for roof engineering).

Keywords

  • 找平层分格缝
  • 嵌缝另计
  • 防水层定额
  • 防水卷材接缝收头
  • 嵌缝膏
  • 密封油膏
  • 分格缝设置间距