GB/T 50484-2019 scope of lightning protection on construction sites (20m/15m thresholds) and impulse earthing resistance limit (30 ohms)
Per GB/T 50484-2019 Clause 4.1.20: site tower cranes, steel derricks, hoists, steel scaffolds, chimneys, and metal structures under construction 20m or taller, located outside the lightning protection range of adjacent structures, shall have lightning protection; if the tallest structure's air terminal (by the rolling-sphere method) protects the others, they need none. Steel forms above 15m require protection (JGJ 162); isolated rigs in open country below 20m should also be protected by reference. Clause 4.1.22: impulse earthing resistance of lightning protection shall not exceed 30 ohms; except for independent air terminals, it may share other earthing systems; down conductors may use the structure's metal body but shall connect at dedicated earthing bolts (4.1.21).
Applicable Codes
- GB/T 50484-2019 石油化工建设工程施工安全技术标准(第 3.6.2、4.1.20、4.1.21、4.1.22 条)
- GB 50057 建筑物防雷设计规范
- JGJ 162 建筑施工模板安全技术规范
- GB 50194 建设工程施工现场供用电安全规范
- GB 50650-2011 石油化工装置防雷设计规范
Topic Positioning
Compliance requirements for direct-stroke lightning protection of temporary works at petrochemical works construction sites per GB/T 50484-2019: the scope of lightning protection devices (Clauses 4.1.20-4.1.22 of Chapter 4 "Temporary Site Power Supply and Temporary Site Buildings and Structures"), impulse earthing resistance limits and down-conductor practice, together with the rainy-season lightning check requirements of Clause 3.6.2 of Chapter 3 "General Provisions". Applicable to lightning-compliance determination and safety inspection of tower cranes, scaffolds, derricks and other temporary works at petrochemical construction sites.
Core Conclusions
Facilities requiring lightning protection (Clause 4.1.20): on-site tower cranes, metal derricks, construction hoists, steel scaffolds, chimneys and other facilities 20 m or above, as well as metal structures under construction, shall be provided with lightning protection when outside the protection range of the lightning protection devices of adjacent buildings (structures). Where the air terminal (lightning rod) on the tallest facility has a protection range calculated by the rolling-sphere method that can protect the other facilities, those other facilities may be provided with no lightning protection device.
- Setting scale: per the direct-stroke lightning protection rules for Class-III industrial buildings in the current GB 50057 "Code for design protection of structures against lightning"; the protection range of lightning rods/overhead earth wires is determined by the rolling-sphere method, no longer by the former broken-line method.
- Steel formwork exception: steel formwork on site shall be provided with lightning protection as soon as it exceeds 15 m in height (industry standard JGJ 162 "Technical code for safety of building construction formwork"), which is stricter than the 20 m threshold of this standard.
- Supplementary cases: lightning strike to construction facilities relates not only to the frequency of local lightning activity but also to the height and isolation of the facility; for example, an isolated pile driver in open country is highly susceptible to lightning strike even below 20 m, and lightning protection may be provided by reference to this clause.
Impulse earthing resistance (Clause 4.1.22): the impulse earthing resistance of lightning earthing shall not exceed 30 Ω. Except for independent lightning rods, the lightning earthing device may be shared with other earthing devices provided the earthing resistance meets the requirements. Clause commentary: when lightning current is discharged into the ground, the soil is punctured and sparks are produced, which is equivalent to enlarging the cross-section of the earthing resistance and markedly reducing the dispersion resistance, so the impulse earthing resistance is generally lower than the power-frequency earthing resistance; as direct-stroke protection for Class-III industrial buildings, the lightning earthing device should preferably be shared with other earthing devices such as those of electrical installations.
Down conductors (Clause 4.1.21): the lightning down conductors of construction facilities and metal structures under construction may use the metal body of the facility or structure, and reliable electrical connection shall be ensured. The electrical path through a single scaffold coupler bolt is not necessarily guaranteed, so the point of connection of the down conductor to the earthing device shall be made on a dedicated earthing bolt.
Rainy-season checks (Clause 3.6.2): during rainy-season construction, electrical equipment and lines shall be inspected and maintained, and the earthing resistance of lightning protection devices shall be measured; in addition, flood-control materials shall be kept ready, drainage pipes and ditches cleared, temporary buildings (structures) inspected and maintained, anti-slip measures checked, and slope collapse and landslides prevented.
Applicable Boundaries
- The clauses on this card come from GB/T 50484-2019 (a recommended standard; the 2019 edition changed the former Chapter 4 "Temporary Power" to "Temporary Site Power Supply and Temporary Site Buildings and Structures", while the old GB 50484-2008 was mandatory). The clauses are implemented at the direct-stroke lightning protection scale for Class-III industrial buildings.
- 20 m is the general facility threshold; steel formwork is 15 m per JGJ 162 (stricter); facilities below 20 m but tall and isolated (e.g., pile drivers in open country) should likewise be provided with protection by reference.
- The 30 Ω limit is the impulse earthing resistance at the scale of temporary works on construction sites (construction safety); the lightning protection design of the petrochemical plant itself is subject to stricter limits (see GB 50650-2011 "Code for design of lightning protection of petrochemical installations" and other design codes) - the two apply to different objects and shall not be mixed.
- Impulse earthing resistance and power-frequency earthing resistance are not directly comparable: impulse earthing resistance is generally lower than power-frequency earthing resistance, and the impulse value must be used for determination.
Further Reading
- For the original clause text see GB/T 50484-2019, Clause 3.6.2 (Chapter 3 "General Provisions", rainy-season construction), Clause 4.1.20 (scope of lightning protection devices), Clause 4.1.21 (lightning down conductors), Clause 4.1.22 (30 Ω impulse earthing resistance and shared earthing).
- Related standards: GB 50057 "Code for design protection of structures against lightning" (direct-stroke protection for Class-III industrial buildings, rolling-sphere protection range), JGJ 162 "Technical code for safety of building construction formwork" (15 m lightning protection for steel formwork), GB 50194; for lightning protection of the plant itself see GB 50650-2011 "Code for design of lightning protection of petrochemical installations".
- No government (.gov.cn) source links were attached to this task; the full standard text can be verified through standards publishing bodies or the national standards full-text public system.
Keywords
- GB/T 50484
- 石油化工建设工程施工安全技术标准
- 防雷装置
- 冲击接地电阻
- 滚球法
- 临时用电及临建设施
- 施工现场防雷
- 塔式起重机防雷