Ground-based scaffold standing-pole foundation requirements: level, firm, drained ground; bearing verification formula and characteristic-value modification; staged inspection during use (GB 51210-2016 cl. 6.2.18/6.2.19/9.0.3/9.0.12)
Per GB 51210-2016: (1) erection ground shall be level, firm, well drained and free of standing water; backfilled ground shall be compacted before erection (cl. 9.0.3); (2) standing-pole foundation bearing must satisfy P = Nd/Ad <= gamma-u x fa, with gamma-u = 1.363 for permanent-load-governed combinations and 1.254 for variable-load-governed, fa being the characteristic bearing value modified per cl. 6.2.19 (cl. 6.2.18); (3) the characteristic value may be set comprehensively from load tests, other in-situ tests, formula computation and experience, modified for soil type and state (cl. 6.2.19); (4) staged inspection, monitoring, maintenance and upkeep during use (cl. 9.0.12).
Applicable Codes
- GB 51210-2016 建筑施工脚手架安全技术统一标准 第6.2.18条、第6.2.19条、第9.0.3条、第9.0.12条
- GB 55023-2021 施工脚手架通用规范(2022-01-01实施,全文强制)
Topic Positioning
This card organizes the three aspects of ground-based scaffold standing-pole foundations in GB 51210-2016: erection ground (cl. 9.0.3), foundation bearing verification (cl. 6.2.18, 6.2.19) and inspection/maintenance during use (cl. 9.0.12), with original text and commentary, for direct citation in special schemes, foundation checks and site safety inspection.
Core Conclusions
Ground requirements (cl. 9.0.3, erection and dismantling chapter). Original: "The erection ground of scaffolds shall be level and firm, with unobstructed drainage and no standing water. The concrete strength at points where the scaffold attaches to the building structure shall satisfy safe bearing." Commentary: ground-based scaffolds stand on the ground or on the structure — "level, firm, no standing water" targets scaffolds on the ground; backfilled ground shall be compacted before erection; cantilever and attached climbing scaffolds demand attention to concrete strength at embedded anchors.
Standing-pole bearing verification (cl. 6.2.18, design chapter). Required: P = N_d / A_d <= gamma_u x f_a, where P = design value of average pressure under the standing-pole base (N/mm2); N_d = design axial force in the standing pole (N); A_d = base area of the pole baseplate (mm2); gamma_u = weighted average of permanent/variable partial factors, 1.363 for permanent-governed and 1.254 for variable-governed combinations; f_a = modified characteristic bearing value (N/mm2) per cl. 6.2.19. Commentary: computation uses the characteristic pole axial force as the design value with the characteristic bearing value; the standard simplifies by substituting N_d and correspondingly magnifying f_a by gamma_u; because pole foundations are highly exposed to seasonal weather and rain, their bearing computation differs from permanent buildings and the characteristic value must be duly modified.
Characteristic bearing value (cl. 6.2.19). Original: "The characteristic value of foundation bearing capacity may be determined comprehensively by load tests or other in-situ testing, formula computation and engineering experience. In scaffold foundation verification, the characteristic value shall be modified for soil type, state and other factors."
During-use requirements (cl. 9.0.12). Original: "Scaffolds shall undergo staged inspection, monitoring, maintenance and upkeep during use." Commentary: scaffolds serve long periods; strengthened inspection keeps them in good working condition — especially cantilever support scaffolds, spanning support scaffolds and those with large height-to-width ratios; monitor them closely and respond promptly to anomalies.
Applicable Boundaries
- This card targets standing-pole foundations of ground-based scaffolds (on ground or structure); cantilever and attached climbing scaffolds hinge on concrete strength at embedded anchors.
- Bearing verification addresses the pole baseplate area A_d (including sole board/baseplate effects); compact backfilled ground before erecting.
- Cl. 9.0.12 links with the periodic-inspection requirements of Chapter 11 safety management (no ponding, no loose or suspended pole bottoms); execute both chapters together on site.
- Some GB 51210-2016 provisions were repealed by the all-mandatory General Code for Scaffolds GB 55023-2021 (effective 2022-01-01); foundation and detailing requirements covered by the new general code follow it wherever applicable.
Further Reading
- GB 51210-2016 Chapter 6 "Design" (cl. 6.1.4 — ground-based working scaffold design contents include foundation bearing; cl. 6.2.18/6.2.19), Chapter 8 "Detailing" (cl. 8.2.5 — bottom sweeping tubes), Chapter 9 "Erection and Dismantling" (cl. 9.0.3, 9.0.12), Chapter 11 "Safety Management".
- Companion: General Code for Scaffolds GB 55023-2021 (all-mandatory, effective 2022-01-01) — the general bottom line for scaffold works (foundations, detailing, erection, use, dismantling), applied with GB 51210-2016.
Keywords
- 脚手架
- 立杆地基承载力
- GB 51210-2016
- 搭设场地
- 平整坚实
- 无积水
- 回填土夯实
- 使用期检查
- γu分项系数
- 地基承载力特征值