original design organization (designer of record)
- 01
Contractors may not make design variations on their own: the legal red line (Regulations art. 28 / Construction Law art. 58 / Decree 687 art. 28 / Railway Decree 35 art. 29), the compliant procedure chain and consequences of unauthorized variation
A contractor has no right to modify design documents or implement design…
《建设工程质量管理条例》(国务院令第279号,2017修订)第二十八条《中华人民共和国建筑法》(2011修正,主席令第46号)第五十八条《建设工程勘察设计管理条例》(国务院令第687号,2017修订)第二十八条2026-09-25 - 02
Rights to propose, compile and approve design variations: any of four parties may propose, only the original designer may modify, three-level approval
Any of the employer, designer, contractor or supervisor may propose a de…
《建设工程勘察设计管理条例》(国务院令第687号,2017修订)CJJ/T 91-2017 风景园林基本术语标准DB13(J)/T 8161-2019 建设工程监理工作标准2026-09-25 - 03
Construction Law: decoration involving the main body or load-bearing structure requires a design scheme from the original design institute first (Article 49 + Article 70 penalties)
For decoration works involving changes to the building's main body or lo…
中华人民共和国建筑法(2019修正)第四十九条中华人民共和国建筑法(2019修正)第七十条2026-09-25