Construction Law: decoration involving the main body or load-bearing structure requires a design scheme from the original design institute first (Article 49 + Article 70 penalties)

For decoration works involving changes to the building's main body or load-bearing structure, the owner must, before construction, entrust the original design institute or a design institute with corresponding qualifications to produce a design scheme; without a design scheme, construction may not proceed (Article 49); unauthorized construction is ordered corrected and fined, with compensation for losses and criminal liability where constituted (Article 70).

Applicable Codes

  • 中华人民共和国建筑法(2019修正)第四十九条
  • 中华人民共和国建筑法(2019修正)第七十条

Topic Positioning

The Construction Law's "mandatory prior design scheme" requirement for decoration works involving the building's main body or load-bearing structure, and the legal liability for unauthorized construction.

Core Conclusions

(1) Precondition: for decoration works involving changes to the building's main body or load-bearing structure, the owner shall, before construction, entrust the original design institute or a design institute with corresponding qualifications to put forward a design scheme; without a design scheme, construction may not proceed (Article 49). (2) Legal liability: unauthorized construction in violation is ordered corrected and fined; losses are compensated; crimes are prosecuted criminally (Article 70). (3) Systemic interface: this precondition echoes Article 28 of the "Regulations on the Administration of Engineering Survey and Design" — the power to modify design documents belongs to the original design institute: structural-change design schemes may not be decided by the contractor, and modification by others requires the original institute's written consent or a qualified institute assuming responsibility per law.

Applicable Boundaries

Applies only to the parts of decoration works involving the building's main body or load-bearing structure; ordinary decoration not involving them triggers no such precondition. The scheme itself must still satisfy structural safety, seismic, and other mandatory codes; design depth follows the corresponding design standards.

Further Reading

"Construction Law of the PRC (2019 amendment)", Articles 49 and 70; companion: "Regulations on the Administration of Engineering Survey and Design", Article 28; structural safety and seismic requirements for building renovation in MOHURD management rules and current structural design codes.