工程量清单编制
- 01
BOQ item characteristics vs quantity calculation rules: the characteristics column must not stipulate calculation rules; supplementary rules belong in the BOQ calculation-rules statement and become contract terms
Item characteristics and calculation rules are two parallel independent…
GB 50860-2013《构筑物工程工程量计算规范》第4.2.1、4.2.4、4.2.5条(强制性条文)GB/T 50854-2024《房屋建筑与装饰工程工程量计算标准》第4.2.6条GB/T 50500-2024《建设工程工程量清单计价标准》第4.1.7条、第7.1.1条、附录D D.4.12026-09-12 - 02
Reviewing tender bills of quantities: methods and criteria for detecting omissions, errors, and duplications
Check the BOQ against four baselines—tender documents, construction draw…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-08-11