consumption quota (resource norm)
- 01
Divergent classification of trench, foundation pit and general earthwork: the BOQ measurement standard treats an excavation with bottom width no more than 3m and bottom length over 3 times the bottom width as a trench and anything beyond as a foundation pit (bottom width and bottom length both exclude working space); the consumption quota treats bottom width no more than 7m with bottom length over 3 times the bottom width as a trench, bottom length no more than 3 times the bottom width with bottom area no more than 150m2 as a foundation pit, and anything beyond as general earthwork. The two criteria run on separate tracks and must not be cross-inferred
BOQ itemisation follows the measurement standard: GB/T 50854-2024 Annex…
GB/T 50854-2024 App. A A.4.5、Table A.2.1、A.4.6、A.4.7DB11/T 2382-2024 第7.1.3、7.1.6、8.1.3条TB/T 10831-2024 册说明二2026-10-25 - 02
Contractor's in-house norms vs. local consumption-quota norms: preparing entity, level positioning, uses, and binding force
Contractor's in-house norms are the labour/material/machinery consumptio…
GB/T 50875-2013 工程造价术语标准GB 50501-2007 水利工程工程量清单计价规范GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 03
Differences among consumption quotas, budget quotas and estimate quotas: quantity standards vs pricing quotas, granularity and the compilation chain
A consumption quota is a pure quantity standard (labor/material/plant-sh…
GB/T 50875-2013 工程造价术语标准GB/T 50851-2013 建设工程人工材料设备机械数据标准GB/T 51095-2015 建设工程造价咨询规范2026-09-25 - 04
Determining quota material consumption: net quantity + loss composition, determination by four material classes, and the construction consumption formula
Material consumption = net quantity + unavoidable wastage (including tra…
GB/T 50875-2013 工程造价术语标准DB11/T 2382-2024 建设工程施工消耗量标准TB/T 10821-2024 铁路工程基本定额2026-09-25