designer's change instruction
- 01
Whether a variation without the design unit's confirmation can serve as the basis for settlement: the evidentiary status of design confirmation and the five-tier classification
A design change notice is the construction basis and the pricing precond…
T/ZBD 100.4-2023 建设工程造价鉴定作业指引T/ZBD 100.5-2023 建设工程结算审核作业指引GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 02
Formal documents must be issued before implementing a design change: construction only with complete certification and sign-off; verbal instructions are no substitute
Mandatory. Before a design change is implemented, the design unit must i…
建设工程质量管理条例 第二十八条中华人民共和国建筑法 第五十八条建设工程勘察设计管理条例(国务院令第687号)第二十八条2026-09-25 - 03
Design variations in construction works: definition, distinction from variation and site instruction / variation record, and the basic procedure
A design variation is the activity of the design organization modifying…
CJJ/T 91-2017 风景园林基本术语标准DB37/T 5164-2020 建筑施工现场管理标准DBJ41/T 208-2018 建设工程监理工作标准2026-09-25 - 04
Difference between work consultation records and design changes: nature, initiating party, effect, conversion relationship, and signature requirements
A work consultation record is a process record of negotiation among the…
GB 55032-2022 建筑与市政工程施工质量控制通用规范国务院令第687号 建设工程勘察设计管理条例JGJ/T 185-2009 建筑工程资料管理规程2026-09-25