design estimate (approved cost ceiling)
- 01
Classification, compilers and roles of stage-wise investment control documents (class A13) in railway construction projects - TB 10443-2010 Section 5.13
Per TB 10443-2010 Code for Management of Railway Construction Project Re…
TB 10443-2010 铁路建设项目资料管理规程 第5.13节(投资控制资料 A13)2026-10-11 - 02
Should the construction-installation cost in a design estimate carry provisional sums? — the stage division of provisional sums (BOQ/contract level) vs reserve funds (estimate level)
No. The construction-installation cost (works cost) in a design estimate…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.13、1.0.2、8.3.1 条T/ZBD 100.3-2022 · Work Guideline for Compilation of Design Estimates of Construction Projects 第 4.1.1、4.5.1、4.5.4 条及App. A、App. ETB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第 2.6 节2026-09-25 - 03
What the "approved (validated) documents" point to in the basis of the highway revised estimate: for a revised estimate, the preliminary-design approval document (JTG 3830-2018 Clause 2.2.1 item 4)
Verbatim from Clause 2.2.1 item 4 of JTG 3830-2018 "Measures for compili…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.2节JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects2026-09-25 - 04
Approved design estimate (approved cost ceiling) as the investment ceiling of highway works construction projects under the 2018 system: JTG 3830-2018 general provisions Clauses 1.0.1-1.0.9 (status of preliminary estimates and budgets, scope, and the control chain)
Per the general provisions of JTG 3830-2018《administrative compilation r…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 1 章总则(第 1.0.1~1.0.9 条)2026-09-25