funding gap
- 01
Rolling forecast method for a project's estimated total cost, estimated gross profit and funding gap
Rolling forecast = each month replace forecast figures with actuals and…
GB/T 50358-2017 建设项目工程总承包管理规范2026-09-25 - 02
Measuring the advance-funding peak and capital occupation period of construction projects (monthly cumulative cash flow method + weighted occupation period formula + simplified estimation)
Advance-funding peak (exact method) = the absolute value of the lowest p…
GB/T 50500-2024 第9.1.7、9.2.2、10.2.4条GB/T 51095-2015 第7.2.1条DBJ/T 15-153-2019 第5.11.2条2026-09-25 - 03
Preparing the construction project cash flow forecast (funds utilization plan): dual bases of contract × project execution plan, dual revenue/expenditure lines, dual-basis closure
Preparing the cash flow forecast = translating the contract payment term…
GB/T 51095-2015 第7.2.1条DBJ/T 15-153-2019 第5.11.2条GB/T 51111-2015 第6.2.3条2026-09-25