programme (of works)
- 01
Linking project cost indicators with the schedule plan: preparation binding → earned value monitoring → synchronized adjustment (GB/T 50502 7.6, GB/T 50326 11.2, GB/T 50358 2.0.8)
Three bonds link cost and schedule: ① preparation — the cost management…
GB/T 50502-2009 建筑施工组织设计规范GB/T 50326-2017 建设工程项目管理规范GB/T 50358-2017 建设项目工程总承包管理规范2026-09-25 - 02
The three anchors of the FIDIC 2017 Red Book time system (Commencement Date / Programme / Time for Completion) mapped against the domestic commencement date, construction schedule, contract duration, and delay damages
The timelines correspond one-to-one but run differently: Commencement Da…
FIDIC Conditions of Contract for Construction (Red Book), 2nd Ed. 2017: Sub-Clause 8.1/8.2/8.8/8.9/10.1/17.6FIDIC Red Book 1999: Sub-Clause 8.1GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.33条、第8.11节2026-09-25 - 03
Layered breakdown of the total duration into milestone, monthly and weekly plans
The total duration is decomposed in a two-level "controlling -> operatio…
GB/T 50326-2017 建设工程项目管理规范GB/T 51235-2017 建筑信息模型施工应用标准RISN-TG 012-2011 建设工程项目经理执业导则2026-09-25