合同价格
- 01
FIDIC 合同第 1 条术语 "Cost" 的定义(1999 红皮书 1.1.4.3 vs 2017 版 1.1.19/1.1.20),及 Cost / Cost Plus Profit / 12.3 合理成本加合理利润三种支付口径的区别
FIDIC 中首字母大写的 "Cost" 是第 1 条定义清单中的专用术语:指承包商合理发生的(或将发生的)、场内场外通算、含管理费但不含利润的…
FIDIC Conditions of Contract for Construction (Red Book), 1st Edition 1999, Sub-Clause 1.1.4.3FIDIC Conditions of Contract for Construction, 2nd Edition 2017, Sub-Clauses 1.1.19 & 1.1.20FIDIC Red Book 1999 Sub-Clause 12.3 [Evaluation]2026-09-08 - 02
FIDIC 工程师的计量-估价-付款职责链:红皮书 12.1/12.2/12.3/14.1 与 2017 版差异
是,且是核心职责。FIDIC 红皮书为重新计量(re-measurement)合同:合同价格不是签约时 BOQ 加总,而是工程师按实测量×适用费…
FIDIC Conditions of Contract for Construction, 1st Edition 1999(红皮书)Sub-Clause 3.2/3.5/12.1/12.2/12.3/14.1/14.6/14.7/14.13FIDIC Conditions of Contract for Construction, 2nd Edition 2017(红皮书)Sub-Clause 3.1/3.7/12.2/12.3/14.1FIDIC Conditions of Contract for Plant and Design-Build, 1st Edition 1999(黄皮书)Sub-Clause 3.12026-09-08