Quantity calculation of manholes, gully inlets (stormwater inlets), and pipe joints: BOQ and quota dual-caliber rules (incl. the manhole-deduction rule for pipe length and anti-duplication points for joints)

Manholes in the BOQ are counted per "unit" by design quantity (GB/T 50857-2024 Appendix E Table E.4.1, code 040504); quotas count by manhole type (standard manholes per unit; non-standard masonry by volume m3 deducting pipe volume; precast assembled by chamber concrete volume; plastic manholes per set; risers per unit); gully-inlet bodies per unit/set, connecting pipes listed under E.1 pipeline-laying codes in meters; sewer pipeline laying is measured in meters by the centerline length from manhole center to manhole center minus manhole lengths (SJG 181.4-2024, Clause 1.2.3; per-manhole deduction in Table 1.2.3); Shenzhen counts pipe joints per "count" of actual joints (Clause 1.2.12), while Beijing/railway ordinary joints are included in laying quotas counted in meters, with only socket-pipe cast-in-place concrete collar joints having a separate "additional fee" sub-item per count. Calibers must be unified within one project to prevent double counting of "both meters and counts".

Applicable Codes

  • GB/T 50857-2024 · Standard for Measurement of Quantities of Municipal Works App. E(Table E.4.1 管道附属构筑物 040504、E.5.6 雨水口连接管、E.1 管道铺设)
  • SJG 181.4-2024 · Consumption Standard for Municipal Works (Volume 4: Water Supply and Drainage Pipeline Networks) (Shenzhen) 第1.2.3、1.2.12条
  • 北京 2021《市政工程消耗量标准》第五章管道铺设(5-395/5-404/5-421、5-164/5-173/5-182)、第六章排水管道附属构筑物(6-54~6-57、6-435~6-453、6-442)
  • 图集 06MS201-3 圆形混凝土污水检查井、16S518 雨水口
  • 北京 DB11/T 2382-2024 附录D 管道铺设工作内容

Topic Positioning

Measurement rules for three items in sewer networks — manholes, gully inlets, and pipe joints: the correspondence and differences between the national BOQ caliber (GB/T 50857-2024 Appendix E) and local quota calibers (Shenzhen SJG 181.4-2024, Beijing 2021 municipal quota), including the manhole-deduction rule for pipe length and anti-duplication points.

Core Conclusions

  1. Pipe length (the basis of joint measurement): sewer pipeline laying quantities are computed in meters by the design centerline length from manhole center to manhole center minus manhole lengths; the deduction per manhole is looked up in the table (SJG 181.4-2024, Clause 1.2.3, Table 1.2.3). The Beijing quota likewise measures center-to-center, with deduction rules per the quota chapter notes applied.
  2. Manholes: BOQ per design quantity in "units" (GB/T 50857-2024 Appendix E Table E.4.1, code 040504 pipeline appurtenant structures), with item features describing manhole type, diameter, depth, material, etc. Quotas count by type — standard manholes per unit, sub-itemed by standard-drawing model, diameter, and pipe ID (Beijing 2021 Chapter 6: 6-54 circular concrete sewage manhole diameter 1000, 6-56 diameter 1250 D=600~800, 6-57 diameter 1500 D=800~1000, drawing 06MS201-3); non-standard masonry manholes by design volume in m3 deducting pipe volume, with plastering and pointing in m2 deducting pipe area; precast assembled reinforced concrete manholes by chamber concrete volume in m3 deducting pipe volume; plastic manholes per set; riser masonry by height class per unit; covers and seats listed separately per design quantity.
  3. Gully inlets: the body per "unit" (or set) by type, material, and size; the connecting pipe is not merged into the body — "gully-inlet connecting pipes shall be listed under the relevant codes of Appendix E.1 pipeline laying" (GB/T 50857-2024 Appendix E, E.5.6), measured in meters by design centerline length. Beijing quota counts the body per unit, by gutter type/flat-grate type, single-grate/three-grate, depth H (6-435 concrete module masonry 16S518 gutter-type single-grate, 6-437 three-grate, 6-439 precast assembled H=0.72 m flat-grate single-grate, etc.); each additional grate has a dedicated adjustment sub-item (6-442); multi-grate inlets = base + additional-grate sub-items applied separately.
  4. Pipe joints: Shenzhen quota — "concrete drainage pipe joints, by diameter and method, shall be counted per 'count' of actual joints" (SJG 181.4-2024, Clause 1.2.12); Beijing/railway calibers include ordinary joints (cement-mortar caulking, spigot-socket rubber rings, etc.) in the pipeline-laying quota work content, counted in meters with the pipe and not listed separately, with laying sub-items graded by joint method (e.g., 90/120/180-degree cement-mortar caulking joints, applied with pipe length by pipe ID). Exception: cast-in-place concrete collar joints of large-diameter socket pipes have a separate "collar-joint additional fee" sub-item per "count" (Beijing 5-395 concrete base 120-degree socket pipe D=600~1200, 5-404/5-421 D=1350~3000), charged only when the design uses socket pipes + cast-in-place collars — not conflicting with per-meter laying and not duplication.
  5. Practical joint-count algorithm: joint count = total pipe sections - pipe segments (each segment breaks at the manhole at both ends with no joint), for per-count sub-items such as collar joints.

Applicable Boundaries

BOQ quantities follow the current GB/T 50857-2024 Appendix E; quota calibers differ by region — this card uses Shenzhen SJG 181.4-2024 and Beijing 2021 municipal quotas as the main examples with the railway caliber for contrast. One project must unify its caliber: when the BOQ pipe is in meters, joints are not listed separately; under the Shenzhen quota joints are counted separately; under Beijing/railway ordinary joints are already in the laying meters — never count both pipe meters and joint counts; only socket-pipe cast-in-place collar joints charged per count as an "additional fee" are not duplication. Beijing quota manhole deductions follow the applied quota volume chapter notes (verify where full chapter notes are not locally held). Pipe-jacking joints counted per joint material in count or m2 are another rule and outside this card.

Further Reading

GB/T 50857-2024 "Standard for measurement of municipal works" Appendix E: Table E.4.1 pipeline appurtenant structures (code 040504), E.5.6 gully-inlet connecting pipe listing, E.1 pipeline laying; SJG 181.4-2024 "Municipal works consumption standard, Volume 4: water supply and sewer networks" Clause 1.2.3 (center-to-center minus manhole length, Table 1.2.3 per-manhole deduction), Clause 1.2.12 (joints per count); Beijing 2021 "Municipal works consumption standard" (source beijing_municipal_2021) Chapter 5 pipeline laying (5-395/5-404/5-421 socket-pipe cast-in-place collar joint additional fee, 5-164/5-173/5-182 spigot-socket concrete pipe 90/120/180-degree caulking joints), Chapter 6 sewer appurtenant structures (6-54~6-57 circular concrete sewage manholes 06MS201-3, 6-435~6-453 gully inlets 16S518 and additional-grate adjustment 6-442); Beijing DB11/T 2382-2024 Appendix D pipeline laying work content; railway TB/T 10832-2024 pipe-laying quota (joints included in work content).