Quota measurement-unit conversion and line-item splitting for fabrication and erection of supports and hangers (pipe supports / metal supports and steelwork): the three bases 100kg, kg and t; the support-quantity reference table where the design is silent; the switch to equipment supports above 50kg per assembly; and the no-double-count test where the cable tray line item already includes support and hanger erection

Quota quantity = support net weight (kg) divided by the quota unit weight: the same net weight of 100.381kg gives 1.004 under the pipe-support fabrication line item in '100kg' units, 100.381 under the metal-support fabrication line item in 'kg' units, and 0.100381 t under the railway 't' unit - conversion is division only, and wastage is already inside the item and must not be multiplied in again. Under DB11/T 2382-2024 table C.10.23-1, C10-4-1 fabrication and C10-4-2 erection of general pipe stands are per 100kg (section steel 105kg per 100kg, implying about 5% wastage), steelwork-type metal supports are per kg, and railway items such as TB/T 10832-2024 PY-365~370 are per t; where the design is silent, pipe support quantities may be taken as the kg/m reference values of table 6.10.39 x pipe length; where one assembly weighs more than 50kg, equipment-support fabrication and erection applies. The cable tray erection line item already includes support and hanger erection, so the site-fabrication route adds only the 'fabrication' item - erection must not be charged again.

Applicable Codes

  • DB11/T 2382-2024 第6.10.39~6.10.46条、第6.3.44条、App. C Table C.10.23-1/C.4.117-1/C.4.93-1
  • 京建发〔2021〕201号 通用安装第四册 第十一章章说明、第十三章第一节
  • GB/T 50856-2024 第3.0.10条、App. N、App. M
  • SJG 181.7-2024 第2.1.8条
  • TB/T 10832-2024 Vol. 11 PY-365~PY-370
  • TB/T 10829-2024 Vol. 8 DY-1216~DY-1220
  • TB/T 10831-2024 Vol. 10 FY-2251~FY-2256

Positioning

Sets out the quota-side treatment of supports and hangers (pipe supports, cable tray supports and hangers, metal supports and steelwork) fabricated and erected on site: how a computed net weight (kg) converts across quota measurement units (100kg / kg / t), how pipe-support and metal-support (steelwork) line items are split and applied, how support quantities are taken where the design is silent, when the switch to equipment supports happens, and the no-double-count test where the cable tray line item already includes support and hanger erection.

Core conclusions

1. The main conversion line

quota quantity = support net weight W (kg) / quota unit weight

The same batch of supports (net weight 100.381kg) written under three units: under the pipe-support fabrication line item in '100kg' units -> 1.004; under the metal-support fabrication line item in 'kg' units -> 100.381; under the railway 't' item -> 0.100381 t. Conversion is division only; fabrication wastage is already embodied in the item's consumption, and no wastage factor may be applied to the quantity.

2. Three unit systems and line-item splitting

a. 100kg - pipe support fabrication and erection (DB11/T 2382-2024 table C.10.23-1)

  • C10-4-1 fabrication, general pipe stands, unit 100kg: composite labour, grade II, 4.27 workdays; section steel 105kg, welding electrodes 2.93kg, acetylene 2.3391m3, steel shims 0.092, nylon grinding discs d100 1.728 pieces; welding machine (composite) 2.062, electric bending machine 0.010, cut-off machine d500 2.707 machine-shifts, other plant 3%. Work content: handling within the yard, lofting, cutting, straightening, hot bending, drilling, bevelling, welding, fabrication.
  • C10-4-2 erection, general pipe stands, unit 100kg: composite labour, grade II, 2.646 workdays; welding electrodes 3.783kg, acetylene 2.2708m3, rubber sheet 3~5mm 0.51kg, hammer-drill bits d16 44.71 sets, dry-mix mortar 48.412kg; welding machine (composite) 1.805 machine-shifts. Work content: surveying, positioning, drilling expansion bolts, matching and assembling, fixing pipe stands.
  • Notes under the table: timber-cushioned and spring-type pipe stands execute the corresponding pipe-support fabrication and erection items, with anti-corrosion timber cushions and spring vibration dampers as separately charged prime cost; where outdoor piping uses above-ground section-steel stands, the corresponding items of Annex C.3 (fabrication and erection of static equipment and process steelwork) apply.

b. kg - the steelwork / metal support basis

  • Steelwork is measured by mass as shown on the design drawings (Jing Jian Fa [2021] No. 201, general installation, volume 4, chapter 13 ancillary works, section 1: 13-1 metal support fabrication, 13-2 metal support erection); DB11/T 2382-2024 table C.4.117-1, metal support fabrication and erection (e.g. C4-13-4 switchgear-bay frames and busbar-bridge supports, unit kg).
  • The difference between 100kg and kg lies only in the quota unit, not in the algorithm - divide the same net weight by the different unit weights; never apply the consumption of a 100kg item directly on a kg basis.

c. t - the railway system (cross-system borrowing requires conversion)

  • TB/T 10832-2024, volume 11: PY-365~PY-370 pipe-support fabrication/erection, split into general, timber-cushioned and spring-type stands, unit t;
  • TB/T 10829-2024, volume 8: DY-1216~DY-1219 general/lightweight steelwork fabrication and erection, unit t; DY-1220 steelwork spray painting per m2;
  • TB/T 10831-2024, volume 10: FY-2251~FY-2256 pipe-support fabrication (general / cushioned / rolling-sliding) and erection, unit t.

3. Net-weight basis and auxiliary materials

  • Net weight is the mass of the metal members computed from the dimensions shown on the design, and the member mass includes the mass of bolts and of holes and corner cuts (DB11/T 2382-2024 clause 6.3.44) - holes and corner cuts are not deducted.
  • The fabrication items already include electrodes, acetylene, grinding discs and steel shims; the erection items already include hammer-drill bits, dry-mix mortar and the fasteners for expansion bolts. Bolts, nuts, washers, shim plates and electrodes are therefore neither listed as separate items nor merged into the measured mass.
  • Fabrication wastage stays inside, never added outside: C10-4-1 consumes 105kg of section steel per 100kg, implying a composite fabrication wastage of about 5% - usable for procurement and requisition-against-quota estimates only, never as a factor added to the measured quantity.
  • Shenzhen cross-check (SJG 181.7-2024): the steelwork fabrication and erection items apply to the fabrication and erection of all supports within that chapter's scope, including derusting and painting, excluding non-destructive testing, galvanising, tinning, chrome plating and plastic spray coating; lightweight steelwork means members not more than 3mm thick.

4. Support quantities where the design is silent (table 6.10.39)

DB11/T 2382-2024 clause 6.10.39: pipe-support fabrication and erection quantities are computed from the mass shown on the design drawings; where the design is silent, the reference table of indoor steel and cast-iron pipe support quantities (table 6.10.39) may be applied (unit kg/m; quantity = pipe length x the matching kg/m value). Extract (nominal diameter -> water supply / heating / chilled water, uninsulated / insulated; cast iron, main / riser / suspended):

  • DN15: 0.627 / 1.07; DN20: 0.553 / 0.866; DN25: 0.470 / 0.87; DN32: 0.429 / 0.947; DN40: 0.412 / 0.881
  • DN50: 0.797 / 1.167; cast iron 0.824 / 0.825 / 0.904
  • DN70: 0.933 / 1.310; DN80: 1.055 / 1.454; cast iron 1.044 / 0.968 / 1.14
  • DN100: 1.142 / 1.586; cast iron 1.129 / 1.305 / 1.194
  • DN125: 1.014 / 1.311; cast iron 1.919 / 1.511 / 2.205
  • DN150: 0.869 / 1.440; cast iron 2.004 / 2.125 / 2.301
  • DN200: 2.234 / 2.788; cast iron 3.298 / 2.747 / -
  • DN250: 2.409 / 2.986; cast iron 3.853 / - / -
  • DN300: 2.524 / 3.087

Companion rules in the same section: clause 6.10.40, factory-made seismic supports and factory-made pipe clips are counted by the quantities shown on the design (no conversion to mass); clause 6.10.41, equipment-support fabrication and erection is computed by mass shown on the design, distinguished by the weight class of each support assembly; clause 6.10.42, outdoor above-ground section-steel pipe stands execute the corresponding items of the static equipment and process steelwork chapter, and where a pipe support assembly weighs more than 50kg the corresponding equipment-support fabrication and erection items apply; clause 6.10.43, sleeves are counted by number, distinguished by the main pipe diameter; where insulated pipes pass through walls or floors the sleeve item is selected by the outer diameter of the insulation, the sleeve packing is compiled as oiled hemp, and the consumption includes reserving and blocking holes.

5. No double counting: the tray erection items already include support and hanger erection

  • Jing Jian Fa [2021] No. 201, general installation, volume 4, chapter 11 (conduit and wiring), chapter notes: the work content of trunking and tray erection already includes support erection, and fabrication of the non-factory-made metal supports so used executes the metal-support fabrication items of chapter 13, ancillary works. The site-fabrication route therefore adds only 'fabrication' - erection must not be charged twice.
  • DB11/T 2382-2024 takes the same line: the C4-11 series tray erection items (e.g. C4-11-254, steel channel-type tray, 'width + height below 1500mm', unit m) carry the work content 'matching, erecting, fixing, bends, tees or crosses, covers, dividers, accessories and support and hanger erection, earthing, etc.' - support and hanger erection and earthing are included; no separate erection item and no separate earthing charge.
  • The BOQ side follows the same logic: GB/T 50856-2024 clause 3.0.10 - the work content of equipment, piping and accessory erection items includes the fabrication, erection and painting of supports, hangers and base channel steel; where there is a dedicated design requirement, list under the corresponding items of Annex N (other and ancillary works) or Annex M (painting, anti-corrosion and insulation works).
  • Adjustment factors of the tray items themselves (same chapter notes): where the design thickness of the main structure of a steel tray exceeds 3mm, labour days and machine-shifts x 1.2; stainless steel trays execute the steel tray items with labour days and machine-shifts x 1.1; the earthing wire of mesh trays is compiled as BV insulated wire, earthing bolts being deemed supplied with the tray.

Application boundaries

  • Line-item codes and consumption vary by region and edition: DB11/T 2382-2024 (Beijing 2024 consumption standard), Jing Jian Fa [2021] No. 201 (Beijing 2021 budget consumption standard), SJG 181.7-2024 (Shenzhen) and TB/T 10829/10831/10832-2024 (railway) must not be mixed; across systems only measurement units and process may be converted - never copy consumption.
  • The 100kg / kg / t difference exists only at the quota-unit level; conversion is division only, with no wastage or conversion factor on top.
  • Table 6.10.39 is a reference for the 'design silent' case; where the design shows the mass explicitly, the design governs (e.g. cable tray supports weighed position by position per support spacing).
  • 'Above 50kg per assembly, switch to equipment supports' is the pipe-support rule of DB11/T 2382-2024; other systems must check their own volume notes.
  • Factory-made supports and hangers and factory-made seismic supports are counted per set or per piece and must not be converted into kg to apply fabrication and erection items.
  • The quota rule 'included in work content, no separate charge' cannot override the BOQ pricing rules - the BOQ side is judged under GB/T 50856-2024 clause 3.0.10 and its annexes.

Further reading

  • DB11/T 2382-2024 'Construction works consumption standard': clauses 6.10.39~6.10.46 (section V, supports, sleeves and others, including table 6.10.39), the table at 6.3.38 (labour-material-plant proportions for process steelwork fabrication and erection), 6.3.44 (member mass includes bolts, holes and corner cuts); Annex C, table C.10.23-1 (C10-4-1/C10-4-2 pipe-support fabrication and erection, 100kg), table C.4.117-1 (metal supports, kg), table C.4.93-1 and C4-11-254 (steel channel-type tray, m).
  • Jing Jian Fa [2021] No. 201, 'Beijing construction works pricing basis - budget consumption standard', general installation, volume 4, electrical equipment installation (lower volume): chapter 11 conduit and wiring, chapter notes (tray includes support erection; main-structure thickness over 3mm x 1.2; stainless steel x 1.1); chapter 13 ancillary works, section 1, steelwork (13-1 metal support fabrication, 13-2 metal support erection).
  • GB/T 50856-2024 clause 3.0.10, Annex N, Annex M.
  • SJG 181.7-2024 'Municipal works consumption standard, volume 7, power ducts, telecommunication pipes and lighting works', clause 2.1.8 (scope of steelwork; definition of lightweight steelwork).
  • Railway: TB/T 10832-2024 'Railway works budget quota, volume 11, water supply and drainage', chapter 3, section 3, item 2, pipe-support fabrication and erection (PY-365~PY-370, unit t); TB/T 10829-2024, volume 8, power works, chapter 3, steelwork fabrication and erection (DY-1216~DY-1220); TB/T 10831-2024, volume 10, building works, chapter 3, section 1, item 5, pipe-support fabrication and erection (FY-2251~FY-2256).
  • Unit theoretical masses of section steel (GB/T 706-2016 tables; formulas for angle, channel, flat and round bar) and the build-up of position-by-position support weights: see the companion card on material-weight algorithms for site-fabricated cable tray supports.

Keywords

  • 支吊架制作安装
  • 管道支架
  • 金属支架制作
  • 铁构件
  • 定额计量单位100kg
  • 支架用量参考表
  • 定额工程量换算
  • 桥架安装含支架