Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-15

Splitting the laying mode of fire low-current conduit (fire PA, fire telephone and fire door monitoring circuits of automatic fire alarm systems): by exposed / concealed wiring, not by the structural-embedding / decorative-stage construction phase - with the material constraints, measurement and quota item bases

The wire conduit of fire PA, fire telephone and fire door monitoring circuits is banded in pricing by the design laying mode, not by construction stage - quota items offer only exposed / concealed (including within suspended ceilings) bands; embedded-with-structure corresponds to concealed and decorative-stage exposed runs to exposed. Concealed means the conduit runs inside the structural layer of walls, floors, slabs or columns, enclosed by non-combustible structure with cover at least 30 mm (GB 50116-2013 Article 11.2.3 preferably not under 30 mm; GB 50166-2019 Article 3.2.2 not under 30 mm); exposed means on wall / ceiling surfaces, within ceilings or on supports with the pipe visible. Material constraints: concealed may use metal conduit, flexible (metal) electrical conduit or rigid plastic conduit of class B1 or better; exposed only metal conduit, flexible (metal) electrical conduit or closed metal trunking (no plastic) - so exposed runs take the metal-conduit exposed items. Measurement per GB/T 50856-2024 Appendix D Table D.12.1 (code 030412): conduit by drawn length in m, boxes per piece, chases under Appendix N.

Applicable Codes

  • GB 50116-2013 火灾自动报警系统设计规范 第11.2.3条
  • GB 50166-2019 火灾自动报警系统施工及验收标准 第3.2.2条
  • GB/T 50856-2024 通用安装工程工程量计算标准 App. D Table D.12.1(code 030412)
  • DBJ/T 15-226-2021 民用建筑电线电缆防火技术规程 第6.2.3条

Scope of the question

The laying-mode split (exposed / concealed) of the wire-protection conduit of fire PA, fire telephone, fire door monitoring and other automatic fire alarm system (FAS) circuits, the resulting material choice and quota item correspondence, and the measurement and itemisation rules.

Core conclusions

1. The split: by design laying mode (exposed / concealed), not by construction stage Quota conduit items band only by exposed / concealed (and configurations such as within ceilings) - no structural-stage / decorative-stage items exist. The site jargon embedded conduit (laid with the structural works) corresponds in pricing to concealed, and exposed conduit (laid on walls / ceilings at the decoration stage) to exposed - both must be translated into a laying mode before applying items. The test is whether the pipe is enclosed by non-combustible structure with cover at least 30 mm:

  • Concealed: conduit within the structural layer of walls, floors, slabs or columns, concrete cover at least 30 mm;
  • Exposed: on wall / ceiling surfaces, within suspended ceilings, on trusses or supports, pipe visible.

2. Code wording (source texts)

  • GB 50116-2013 Code for Design of Automatic Fire Alarm Systems, Article 11.2.3: concealed wiring shall be protected in metal conduit, flexible (metal) electrical conduit or rigid plastic conduit of class B1 or better, laid within the structural layer of non-combustible construction with cover preferably not under 30 mm; exposed wiring shall be protected in metal conduit, flexible (metal) electrical conduit or closed metal trunking. Mineral-insulated non-combustible cables may run exposed directly.
  • GB 50166-2019 Standard for Construction and Acceptance of Automatic Fire Alarm Systems, Article 3.2.2: concealed conduit of all kinds shall be laid within non-combustible structure with cover not under 30 mm.
  • DBJ/T 15-226-2021 Technical Code for Fire Protection of Wires and Cables in Civil Buildings, Article 6.2.3: concealed wiring preferably in metal conduit or flame-retardant rigid plastic conduit within non-combustible structure; FAS wiring concealed shall be in metal conduit or rigid plastic conduit of class B1 or better; concealed circuits of fire-power equipment, fire linkage control, automatic extinguishing control, fire communication, fire emergency lighting and fire PA shall be in metal conduit within non-combustible structure with cover not under 30 mm.

3. Material constraints (deciding the item)

  • Concealed: metal conduit, flexible (metal) electrical conduit or rigid plastic conduit of class B1+ (metal or flame-retardant rigid plastic);
  • Exposed: only metal conduit, flexible (metal) electrical conduit or closed metal trunking - no plastic; only mineral-insulated non-combustible cables may run exposed directly;
  • so the exposed runs of fire PA, telephones and door monitoring generally take galvanised steel (or thin-wall / flexible metal) conduit exposed items, never PVC flame-retardant exposed items; only concealed runs may count B1+ rigid plastic;
  • note DBJ/T 15-226-2021 Article 6.2.3 sets stricter terms than GB 50116-2013's general rule for fire-power, linkage, extinguishing control, communication, emergency lighting and PA circuits - concealed such circuits shall be in metal conduit, so even concealed runs preferably count as metal.

4. Measurement and itemisation (GB/T 50856-2024 Appendix D Table D.12.1, code 030412)

  • Conduit names cover thin-wall, galvanised steel, explosion-proof, flexible metal sleeve, plastic, metal hose, corrugated and press-fit KBG conduit; configurations cover exposed, concealed, in ceilings, on steel supports, on catenaries, buried, submerged, in tanks and vessels, in masonry ducts etc.;
  • Conduit by drawn length in m;
  • Junction and pull boxes: one added per 40 m (no bend), 30 m (1 bend), 20 m (2 bends), 10 m (3 bends); vertically, pull boxes per 30 m (conductors up to 50 mm2), 20 m (70-95 mm2) and 18 m (120-240 mm2). Where the design is silent, box counts follow these rules;
  • Switch and socket boxes itemise under the junction-box codes;
  • Chasing and grooving for conduit runs itemises under Appendix N ancillary works;
  • Reserved lengths of wiring entering boards, cabinets and panels per Table D.17.3-8.

Applicability limits

  • Applies to the laying-mode test, material choice and pricing basis of FAS wire-protection conduit (fire PA, telephone, door monitoring, power monitoring, arc-fault monitoring and the like - all FAS companion subsystems).
  • Embedding is site jargon only - not every pipe laid with the structure prices as concealed: only pipes enclosed in non-combustible structure with cover at least 30 mm count as concealed; runs within suspended ceilings fail the test and count as exposed.
  • Item numbers vary by region and version (e.g. Beijing DB11/T 2382-2024) - match the local volume's material + laying-mode bands; this card gives the basis, not item numbers.
  • General fire protection of electrical circuits also involves GB 55036-2022 and GB 50016-2014 (2018) Article 10.1.10 (which counts runs within suspended ceilings as exposed).

Further reading

  • GB 50116-2013 Article 11.2.3; GB 50166-2019 Article 3.2.2.
  • GB/T 50856-2024 Appendix D Table D.12.1 (030412) notes 1-10; Appendix N (031301).
  • DBJ/T 15-226-2021 Article 6.2.3.
  • Local installation consumption standards, conduit exposed / concealed chapters (e.g. DB11/T 2382-2024).

Keywords

  • 消防弱电配管
  • 明敷 暗敷
  • 火灾自动报警系统 配管
  • 预埋配管 计量
  • 明配 暗配 定额子目
  • 保护层厚度30mm
  • GB/T 50856-2024 配管配线
  • 030412