Sub-table codes of the highway estimate/budget project tables: traffic safety facilities JA, tunnel electromechanics SJ, tunnel structure SD (JTG 3830-2018 Appendix B)

Per JTG 3830-2018 Appendix B.0.1, the estimate/budget project tables have nine sub-tables: subgrade LJ, pavement LM, culverts HD, bridges QL, tunnels SD, traffic safety facilities JA, tunnel electromechanics SJ, greening and environmental protection LH; traffic safety facilities = JA (Table B.0.1-7), tunnel electromechanics = SJ (Table B.0.1-8), tunnel civil structure = SD (Table B.0.1-6); unified item numbering shall be applied when compiling estimates and budgets.

Applicable Codes

  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects App. B(Table B.0.1-1~B.0.1-9)
  • JTG 3830-2018 第2.4.3条(分项编号规则)
  • JTG 3830-2018 App. C(设备与材料的划分标准)

Topic Positioning

The letter codes and correspondences of the nine sub-tables of Appendix B "estimate and budget project tables" of the "Measures for compiling estimates and budgets of highway engineering construction projects" (JTG 3830-2018) — especially traffic safety facilities = JA, tunnel electromechanics = SJ, tunnel civil structure = SD — for looking up the unified sub-table codes when compiling estimates (budgets).

Core Conclusions

Per Clause B.0.1 of Appendix B of JTG 3830-2018, the project tables have nine sub-tables with unified codes:

  • Estimate/budget project table: Table B.0.1-1;
  • Subgrade works sub-table (LJ): Table B.0.1-2;
  • Pavement works sub-table (LM): Table B.0.1-3;
  • Culvert works sub-table (HD): Table B.0.1-4;
  • Bridge works sub-table (QL): Table B.0.1-5;
  • Tunnel works sub-table (SD): Table B.0.1-6;
  • Traffic safety facilities sub-table (JA): Table B.0.1-7;
  • Tunnel electromechanics sub-table (SJ): Table B.0.1-8;
  • Greening and environmental protection sub-table (LH): Table B.0.1-9.

That is: traffic safety facilities use JA, tunnel electromechanics SJ, and the tunnel civil structure SD — three different sub-tables, not interchangeable. Appendix B notes: "The project tables and item codes (text and electronic library) are managed uniformly by the chief-editing unit of these measures. Unified item numbering shall be applied when compiling estimates and budgets." JA/SJ are sub-table letter codes; details are numbered digitally within the tables (e.g., SJ01, SJ0101).

Visible detail structure of the tunnel electromechanics (SJ) sub-table (verbatim): SJ01 tunnel monitoring (SJ0101 monitoring equipment cost, SJ0102 monitoring equipment installation, SJ0103 monitoring-system power distribution); SJ02 tunnel power supply and lighting (SJ0201 power equipment cost, SJ0202 lighting installation); SJ03 tunnel ventilation (unit km, by single-bore length, incl. SJ0301 ventilation equipment cost, SJ0302 installation); SJ04 tunnel fire protection (unit km, by single-bore length, incl. SJ0401 equipment cost, SJ0402 installation); SJ06 chamber doors (unit: leaf, graded by chamber type, incl. SJ0601 roller shutters, SJ0602 access doors).

Visible detail structure of the traffic safety facilities (JA) sub-table (verbatim): JA09 demolition class (JA0909 removing raised pavement markers, unit: block; JA0910 erasing markings, unit m2/m); JA10 bus-stop canopies (JA1001 steel canopy, JA1002 reinforced concrete canopy, unit: each; JA1003 bus-stop paving, unit m2).

Applicable Boundaries

  • This code system applies only to estimate and budget compilation (JTG 3830-2018 Appendix B); unified item numbering is mandatory — no self-made numbering.
  • The investment-estimate stage has its own project-table numbering under JTG 3820-2018, different from these sub-table codes.
  • Bidding BOQ pricing follows the chapter numbering of the ministry's "Standard highway construction bidding documents" (e.g., tunnels Chapter 500, safety facilities and embedded conduits Chapter 600), not these sub-table codes.
  • The details here cover only the visible parts of the desktop evidence (some of SJ01-SJ06, JA09/JA10); JA01-JA08 and SJ05 do not appear; the complete items/sections/details are governed by the official publication and the chief-editing unit's electronic library.

Further Reading

  • See JTG 3830-2018 Appendix B Tables B.0.1-1 to B.0.1-9 and Clause 2.4.3 (five-level item numbering: part 1 digit - item 2 - sub-item 2 - section 2 - detail 2).
  • Complete sub-table contents per the official publication and the uniformly managed electronic library.
  • Equipment/material division per Appendix C (C.0.1-C.0.3) of the same measures.