standardized chapter schedule of estimates
- 01
Highway estimate/budget project-table compilation rules: ten items of Part 1 cost of works (temporary works through special fees) and the part-item-sub-item-section-detail five-level coding (JTG 3830-2018 Section 2.4, Appendix B)
Per Clause 2.4.2 Figure 2.4.2 of JTG 3830-2018 (see Appendix B Table B.0…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.4节、App. B2026-09-25 - 02
Highway 2018 system item-numbering rule for estimates and budgets: five levels - part (1 digit), item (2), sub-item (2), section (2), detail (2) (JTG 3830-2018 Clause 2.4.3; see Appendix B)
Per Clause 2.4.3 of JTG 3830-2018 "Measures for compiling estimates and…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.4节(第2.4.1~2.4.3条)及App. B2026-09-25 - 03
Sub-table codes of the highway estimate/budget project tables: traffic safety facilities JA, tunnel electromechanics SJ, tunnel structure SD (JTG 3830-2018 Appendix B)
Per JTG 3830-2018 Appendix B.0.1, the estimate/budget project tables hav…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects App. B(Table B.0.1-1~B.0.1-9)JTG 3830-2018 第2.4.3条(分项编号规则)JTG 3830-2018 App. C(设备与材料的划分标准)2026-09-25