Highway estimate/budget works sub-table codes (JTG 3830-2018 Appendix B): culverts HD, greening and environmental protection LH, the nine two-letter codes, and item numbering within the sub-tables

Per Appendix B of JTG 3830-2018, there are nine works sub-tables, all two-letter codes: subgrade LJ, pavement LM, culverts HD, bridges QL, tunnels SD, traffic safety facilities JA, tunnel electromechanics SJ, greening and environmental protection LH (Tables B.0.1-2 to B.0.1-9). Culvert sub-table (HD, Table B.0.1-4): HD01 pipe culverts, HD02 slab culverts, HD03 box culverts, HD04 arch culverts (m/each). Greening sub-table (LH, Table B.0.1-9): LH01 slope greening through LH09 sound barriers. Unified item numbering is mandatory.

Applicable Codes

  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects App. B(Table B.0.1-1~B.0.1-9)

Topic Positioning

The two-letter codes of the nine works sub-tables of Appendix B "estimate and budget project tables and works sub-tables" of the "Measures for compiling estimates and budgets of highway engineering construction projects" (JTG 3830-2018) (culverts = HD, greening and environmental protection = LH, etc.), and the item numbering inside the culvert and greening sub-tables — for correctly applying the sub-tables when compiling highway estimates and budgets.

Core Conclusions

Appendix B of JTG 3830-2018 lists nine works sub-tables, all with two-letter codes:

  • Subgrade LJ (B.0.1-2); pavement LM (B.0.1-3); culverts HD (B.0.1-4); bridges QL (B.0.1-5); tunnels SD (B.0.1-6); traffic safety facilities JA (B.0.1-7); tunnel electromechanics SJ (B.0.1-8); greening and environmental protection LH (B.0.1-9).

Culvert works sub-table (HD, B.0.1-4), unit m/each:

  • HD01 pipe culverts (graded by diameter and single/double bore)
  • HD02 slab culverts (graded by material and aperture)
  • HD03 box culverts (graded by aperture)
  • HD04 arch culverts (graded by material and aperture)

Greening and environmental protection sub-table (LH, B.0.1-9) items: LH01 slope greening; LH02 site greening and environmental protection; LH03 tree planting; LH04 shrub planting; LH05 climbing plants; LH06 bamboo planting; LH07 palm planting; LH08 hedges; LH09 sound barriers (graded by material and form).

Where the LH sub-table hangs in the main table (B.0.1-1): e.g., "XX maintenance depot greening and environmental protection", "XX toll station greening and environmental protection" (carrying the LH sub-table), "wastewater treatment facilities" (per place, graded by content), "spoil/borrow site greening" (per place, carrying LH); under "109 other works", connecting/branch/connector/access roads (km/place) carry the subgrade, pavement, culvert, bridge, tunnel, and traffic safety sub-tables, and road/river/ditch/canal relocations (m/place) carry the subgrade sub-table.

Appendix B note: the project tables and item codes (text and electronic library) are managed uniformly by the chief-editing unit; unified item numbering shall be applied when compiling estimates and budgets.

Applicable Boundaries

  • Applies to highway estimates and budgets (incl. construction-drawing budgets) compiled under JTG 3830-2018; investment estimates follow the separate JTG 3820-2018 and are outside this card.
  • The sub-table codes are fixed identifiers of Appendix B — do not alter them; the serial numbers and contents of Parts 1-5 and the "items" remain unchanged, missing sub-items added nearby below item level.
  • The local standard text is OCR-based with recognition noise in places (e.g., misreads of "slab culvert", "arch culvert", "aperture"); cite per the official publication.

Further Reading

See JTG 3830-2018 Appendix B: Table B.0.1-1 project table; B.0.1-2 subgrade (LJ); B.0.1-3 pavement (LM); B.0.1-4 culverts (HD); B.0.1-5 bridges (QL); B.0.1-6 tunnels (SD); B.0.1-7 traffic safety (JA); B.0.1-8 tunnel electromechanics (SJ); B.0.1-9 greening and environmental protection (LH). Item-numbering rules in Clauses 2.4.2-2.4.3; companion quota: JTG/T 3832-2018 "Highway works budget quota".