Railway 2024 budget quota: CFG piles and deep soil-mixing (cement) columns use the Volume 1 subgrade works (TB/T 10822-2024) ground-treatment LY items and their measurement rules (pile length in 100 m as the main rule; T-shaped mixing pile in 10 m3 the exception)
The railway 2024 budget quota has 13 volumes, Volume 10 being "Housing works" TB/T 10831-2024. CFG piles and deep soil-mixing (cement) columns for subgrade soft-ground treatment both use the LY items of Chapter 4 "ground treatment" in Volume 1 "Subgrade works" TB/T 10822-2024. Main measurement rule: except the T-shaped (nail-shaped) deep soil-mixing column (LY-253, per 10 m3), CFG piles, deep soil-mixing (cement) columns, bidirectional mixing columns etc. are all measured by design pile length in meters (quota unit 100 m); the CFG pile's concrete main material is bracketed and priced separately (per the basic quota TB/T 10821-2024), while cement is already included in the soil-mixing column items.
Applicable Codes
- TB/T 10822—2024 铁路工程预算定额 Vol. 1 路基工程
- TB/T 10821—2024 铁路工程基本定额
- TB 10811—2024 铁路基本建设工程设计概(预)算费用定额
- TB/T 10813—2024 铁路工程材料基期价格
- TB/T 10814—2024 铁路工程施工机具台班费用定额
- TB/T 10831—2024 铁路工程预算定额 Vol. 10 房屋工程
Topic Positioning
In the railway works budget quota (2024 edition, 13 volumes): CFG piles and deep soil-mixing (cement) columns (including bidirectional and T-shaped types) belong to subgrade soft-ground treatment and use the LY items of Chapter 4 "ground treatment" in Volume 1 "Subgrade works" TB/T 10822-2024. This card gives the item numbers, measurement units and the "by pile length or by volume" measurement rules, correcting the common error of "using Volume 10".
Core Conclusions
Volume positioning: the railway 2024 budget quota has 13 volumes (Volume 1 subgrade works, Volume 2 bridge and culvert works ... Volume 10 housing works, Volume 11 water supply and drainage ...); Volume 10 is "Housing works" TB/T 10831-2024. CFG piles and deep soil-mixing (cement) columns for subgrade soft-ground treatment are not in Volume 10 but in Chapter 4 "ground treatment" of Volume 1 "Subgrade works" TB/T 10822-2024.
CFG pile items (quota unit 100 m): LY-266 CFG pile, diameter 40 cm, hole-enlargement coefficient 20%; LY-268 CFG pile, diameter 50 cm, hole-enlargement coefficient 20%; LY-269 CFG pile, diameter 50 cm, hole-enlargement coefficient +/-1% (adjustment item, includes other plant and small tools cost and tyre-loader consumption). The same section also has companion items for CFG pile caps (cast/precast concrete, reinforcement, installation) and rafts (concrete, reinforcement).
Deep soil-mixing (cement) column items: LY-251 deep soil-mixing (cement) column, cement content 55 kg/m (single-shaft slurry injection, 100 m, includes ordinary Portland cement P.O 42.5 5603.885 kg/100 m ~= 56 kg/m and water 3.000 t/100 m, plant is a single-shaft slurry-jet mixing rig); LY-252 deep soil-mixing (cement) column, cement content +/-5 kg/m (100 m, contains only cement 509.444 kg/100 m and water 0.300 t/100 m, no labor or plant); LY-254 bidirectional deep soil-mixing (cement) column, diameter 50 cm, cement content 70 kg/m (100 m, bidirectional mixing rig d<=800); LY-253 T-shaped (nail-shaped) deep soil-mixing column, cement content 16% (10 m3, T-shaped cement pile rig d<=500). The same section also has cement-mortar deep mixing columns, jet-grouting piles, dry powder jet-mixing columns etc. — see the quota text.
Measurement rules:
- Main rule: CFG piles, standard deep soil-mixing (cement) columns, bidirectional mixing columns etc. are all measured by design pile length in meters (quota unit 100 m), not by volume — where drawings give "m3/pile", convert back to pile length first.
- Where cement content differs from the quota, adjust with the "+/-5 kg/m" adjustment item (e.g. LY-252); the quantity is likewise pile length.
- The CFG pile quota is compiled with a hole-enlargement coefficient of 20% (two steps: 40 cm and 50 cm); where the actual coefficient of a 50 cm pile differs from 20%, adjust with LY-269 per each 1% increment/decrement; the quantity is still design pile length — do not additionally multiply the enlargement coefficient.
- Sole exception: the T-shaped (nail-shaped) deep soil-mixing column LY-253 is measured in 10 m3; convert before applying.
Material content differences (to prevent omissions): in the consumables of CFG items LY-266/268 the materials are only "other material fees" — the base price excludes the concrete main-material cost; concrete must be priced separately per the design strength grade under the "Railway works basic quota" TB/T 10821-2024 (including mix proportions, mixing and haulage). Deep soil-mixing (cement) columns are the opposite: cement is inside the item (LY-251 content 5603.885 kg/100 m matches the quota content of 55 kg/m). Per the general notes: bracketed material quantities represent the consumption of that material for completing the quota unit; such items do not price "material cost" and "weight" — price them separately per the materials adopted in the design.
Mixing warning: for CFG piles of housing works (not subgrade), Volume 10 "Housing works" has FY-204 "CFG pile, bored hole (diameter <=500)" in unit 10 m3, which must not be mixed with the subgrade volume's LY items.
Applicable Boundaries
- The quota is based on current railway design, construction and quality-acceptance standards, compiled for normal construction conditions and a reasonable site organization and construction methodology; it applies to new and rebuilt railway works and is the basis for compiling railway design estimates (budgets); prices at implementation stage are market-determined (general notes 2 and 3).
- Labor unit prices follow the "Railway capital construction project design estimate (budget) fee quota" TB 10811-2024, material unit prices follow the "Railway works material base-period prices" TB/T 10813-2024, and plant rates per machine-shift follow the "Railway works construction plant and small tools machine-shift rate quota" TB/T 10814-2024 (general note 8).
- In the quota, "within" and "below" are inclusive of the number itself; "beyond" and "above" are exclusive; dimensions without stated units are in mm (general note 9).
- This card covers only CFG piles and deep soil-mixing (cement) columns of the "ground treatment" chapter of Volume 1 subgrade works. Bored piles of bridge/culvert works use Volume 2 TB/T 10823-2024 (QY series, stepped by rig type x pile diameter x stratum, unit 10 m) — different steps and measurement rules; this card does not apply.
- Item consumption figures are per the current valid text of TB/T 10822-2024; this card contains no project-, region- or contract-specific price information.
Further Reading
- "Railway works budget quota, Volume 1: subgrade works" TB/T 10822-2024, Chapter 4 "ground treatment": item tables and chapter notes for CFG piles (replacement piles) and deep soil-mixing (cement) columns (soil-cement stabilization columns).
- Same volume general notes: 5, materials (bracketed materials priced separately, main-material substitution, concrete and mortar mix-proportion and mixing/haulage conversion, ready-mixed concrete priced at local market price including haulage with no further mixing/haulage fee); 7, installation items exclude equipment cost; 8, documents governing labor/material/plant machine-shift unit prices; 9, other notes ("within/below" inclusive; unstated dimensions in mm).
- Companion quotas: "Railway works basic quota" TB/T 10821-2024, "Railway capital construction design estimate (budget) fee quota" TB 10811-2024, "Railway works material base-period prices" TB/T 10813-2024, "Railway works construction plant and small tools machine-shift rate quota" TB/T 10814-2024, "Railway works budget quota, Volume 10: housing works" TB/T 10831-2024 (CFG pile boring for housing works: FY-204).
- The list of the 13 volumes is in the general notes of TB/T 10822-2024.
Keywords
- CFG桩
- deep soil-mixing (cement) columns
- 钉型水泥搅拌桩
- 双向水泥搅拌桩
- 地基处理
- LY-266
- LY-251
- railway works budget quota manual (China Railway)
- TB/T 10822