Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

TB/T 10823-2024 railway bridge quota bored-hole item selection: rotary-excavation/impact/circulating-rotary drills stepped by pile diameter x stratum (QY-88~147)

In "Section 4: bored and dug piles" of Chapter 1 substructure of TB/T 10823-2024 Volume 2, land boring items are stepped in three dimensions — rig type x diameter step x stratum step — not by hole depth, all measured per 10 m: rotary-excavation drills have a single "soil" stratum (QY-88~92, dia <=0.8~<=2.0 m); impact drills cover five strata — sandy gravel, soft rock, cobble, sub-hard rock, hard rock (QY-93~117, dia <=0.8~<=2.0 m); circulating-rotary drills cover the same five strata (QY-118~147, dia <=0.8~<=2.5 m). Wrong stratum or rig is costly: within one rig type the hard-rock vs sandy-gravel base-price ratio is about 5.7x, and misapplying the rotary soil item to cobble stratum gives an about 8.6x price gap — apply by segments per the borehole column log.

Applicable Codes

  • TB/T 10823-2024 · Budget Quota of Railway Engineering (Volume 2: Bridge and Culvert Works) Ch. 1 下部工程 第四节 钻孔桩与挖孔桩(QY-88~147)

Topic Positioning

The selection rules for land bored-pile hole-forming items in "Section 4: bored and dug piles", Chapter 1 substructure, TB/T 10823-2024 Volume 2 (bridge and culvert works): by what dimensions the rotary-excavation, impact, and circulating-rotary rig items are stepped (diameter x stratum, not depth), the item number ranges, work-content calibers, and the cost magnitude of misapplication — for item selection and audit of railway bored-pile budgets/BOQs.

Core Conclusions

  1. Stepping dimensions: hole-forming items step on "rig type x diameter step x stratum step" — not by hole depth; all units 10 m; base prices include labor, materials, and plant (quota base-period prices).
  2. Land rotary-excavation drilling (QY-88~92): work content "erect/remove the slurry circulation system and make slurry, prepare tooling, erect/remove/move the rig frame and rig, erect/remove drill rods and bits; drill, feed slurry, clear cuttings; clean the hole". One stratum — soil; five diameter steps <=0.8, <=1.0, <=1.25, <=1.5, <=2.0 m.
  3. Land impact drilling (QY-93~117): work content "erect/remove the slurry circulation system and make slurry, prepare tooling, erect/remove/move the rig, erect/remove the bit; drill, feed slurry, clear cuttings; clean the hole". Five strata — sandy gravel, soft rock, cobble, sub-hard rock, hard rock; diameter steps <=0.8, <=1.0, <=1.25, <=1.5, <=2.0 m; 5x5 = 25 items.
  4. Land circulating-rotary drilling (QY-118~147): same content caliber as impact. Five strata as above; six diameter steps <=0.8, <=1.0, <=1.25, <=1.50, <=2.0, <=2.5 m — 30 items; only circulating-rotary covers diameters above 2.0 m (to <=2.5 m).
  5. Selection essentials: rotary-excavation has only soil; on sandy gravel and harder strata you must switch to the corresponding impact or circulating-rotary stratum item; impact and circulating-rotary are applied by layers per the geological column log — one pile may take different stratum items by segment.
  6. Cost of error (relative ratios, <=1.25 m step): the impact-drill hard-rock base price is about 5.7x the sandy-gravel step; adjacent stratum steps differ by about 21%-100% (sub-hard to hard rock about +76%); at equal stratum, impact runs about 18%-37% above circulating-rotary (measured 17.6%-36.9% across the five strata at <=1.25 m); misapplying the rotary soil item on cobble makes the correct item about 8.6x the wrong one — a high-value audit focus.

Applicable Boundaries

  • Applies only to the land drilling items of Section 4 "bored and dug piles", Chapter 1, TB/T 10823-2024 Volume 2; over-water drilling and dug piles (manual excavation, etc.) are other items of the section, per their own steps and calibers.
  • This card carries no base-price figures; price by the current quota base-period prices, with differences adjusted per the railway estimate (budget) compilation measures (TB 10801 series); quota base prices are a uniform national base level, unrelated to local market prices.
  • Diameter and stratum steps are judged by the design pile diameter and the ground investigation; apply by stratum segments along the pile — never one step for the whole pile.

Further Reading

  • TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works", Chapter 1 Section 4: (1) land rotary-excavation drilling QY-88~92, (2) land impact drilling QY-93~117, (3) land circulating-rotary drilling QY-118~147; bored-pile concreting (QY-202~207) and dug-pile items listed elsewhere in the section.
  • Misapplication detection: see the cited card "audit of pricing by applying quota line items: identifying over-application, misapplication, and duplicate application — the three-way comparison method"; excavation and pumping rules: see the card "railway bridge quota foundation excavation and pit pumping (TB/T 10823-2024 Volume 2)"; quota base-price vs market cost gaps: see the card "framework of causes for differences between quota and actual market construction costs".

Keywords

Cited By