TB/T 10827-2024 railway budget quota Volume 6 signaling works: scope and application rules (non-standard equipment booked separately, demolition factors 0.7/0.5, bracketed materials booked separately)

TB/T 10827-2024 "Railway works budget quota, Volume 6: signaling works" applies to new and rebuilt (expanded) railway signaling; items for non-standard and variable-count equipment (assemblies, relays, ZPW-2000 track circuits and coding equipment) include only installation labor and plant shifts, not the equipment — booked separately per design quantities; demolition books only labor and plant shifts by the factor table: outdoor cables and indoor wiring 0.7/0.7; equipment and apparatus 0.5/0.5. Bracketed materials, HT-0 concrete, and equipment costs are not included — book separately; labor/material/plant prices per TB 10811-2024, TB/T 10813-2024, TB/T 10814-2024.

Applicable Codes

  • TB/T 10827—2024 · Budget Quota of Railway Engineering (Volume 6: Signaling Works) 总说明、册说明
  • TB/T 10821—2024 · Basic Quota of Railway Engineering
  • TB 10811—2024 · Quota of Expenses for Capital Construction Design Estimates and Budgets of Railway Projects
  • TB/T 10813—2024 · Base Period Prices of Materials for Railway Engineering
  • TB/T 10814—2024 · Quota for Shift Costs of Construction Machinery and Tools of Railway Engineering
  • TB 10801—2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects

Topic Positioning

The scope and application rules of the general and volume notes of TB/T 10827-2024 Volume 6: what consumptions are inside the quotas when budgeting signaling works, what must be booked separately or factor-adjusted, and the price bases for labor, materials, and plant shifts.

Core Conclusions

  1. Scope: the general notes provide "this quota applies to new and rebuilt railway works" (common to all 13 volumes); the volume notes: "this volume applies to new and rebuilt (expanded) railway signaling works".
  2. Non-standard equipment booked separately: "For non-standard and variable-count equipment (assemblies, relays, ZPW-2000 track circuits and coding equipment, etc.), the items include the labor and plant shifts needed for installation but not the equipment; book the equipment separately per design quantities."
  3. Demolition factors: when used for demolition, "only labor and plant shifts are booked", per Table 1: outdoor cables and indoor wiring — labor 0.7, plant 0.7; equipment and apparatus — labor 0.5, plant 0.5.
  4. Bracketed materials: bracketed quantities are the consumptions per quota unit; such items carry no "material cost" or "weight" — book per design materials; where the design's main materials differ from the item, swap with consumptions unchanged.
  5. Concrete and mortar: (1) "HT-0" concrete items carry no "material cost", "weight", or constituents — book per the basic quotas; other codes carry them and adjust per the basic quotas when the design differs; (2) when using basic-quota mixing/transport/mix items, multiply the design solid volume by the consumption-to-solid conversion factor; (3) with ready-mixed concrete, "price it at the local market price including freight; do not book mixing and transport again".
  6. Equipment cost: "installation items exclude equipment cost" — equipment purchase costs booked separately per design.
  7. Price bases: labor per TB 10811-2024; materials per TB/T 10813-2024; plant per TB/T 10814-2024.
  8. Site short-haul: factory-process items cover within the temporary yard; other items within 50 m unless noted; labor shifts are 8 hours.
  9. Other calibers: "within/below" include the number, "beyond/above" exclude it; unmarked dimensions mm; "weight" is the sum of material weights, excluding auxiliary materials, materials in "other material costs", water, and plant fuel.

Applicable Boundaries

  • This card targets signaling (Volume 6); the general notes on labor/materials/plant/prices are common to all 13 volumes — other volumes (subgrade, bridge, tunnel, track, communication, information, power, etc.) may consult them, but volume-note differences (e.g., demolition factor tables) follow each volume.
  • The quota is a consumption standard (labor, materials, plant, instruments) without fee rates; measure fees, indirect costs, and price differences follow TB 10801-2024 and TB 10811-2024. "Implementation-stage prices are market-determined."
  • The demolition factors apply only to the two classes of Table 1 (outdoor cables/indoor wiring; equipment and apparatus).
  • Material waste rates per TB/T 10821-2024 basic quotas; building works per TB/T 10831-2024 Volume 10 — outside this card.

Further Reading

  • TB/T 10827-2024 Volume 6 "general notes" (13 volumes: subgrade, bridge and culvert, tunnel, track, communication, signaling, information, power, electric traction power supply, buildings, water supply and drainage, locomotive/car/machinery, station yards) and "volume notes, Part 1 general notes" (three clauses: scope, non-standard equipment, demolition Table 1).
  • Related codes: TB/T 10821-2024 (basic quotas, waste rates and amortization), TB 10811-2024 (fee quotas, labor prices), TB/T 10813-2024 (material base prices), TB/T 10814-2024 (plant shift quotas), TB 10801-2024 (compilation measures), TB/T 10831-2024 (buildings).
  • Design and acceptance bases of this edition: TB 10007 "Code for design of railway signaling", TB 10069 "Code for design of hump signaling and yard automation systems", TB 10419 "Standard for constructional quality acceptance of railway signaling works", TB 10756 "Standard for constructional quality acceptance of high-speed railway signaling works".

Keywords

  • TB/T 10827-2024
  • 信号工程预算定额
  • 铁路工程预算定额 第六册
  • 非定型器材另行计列
  • 拆除系数
  • 带括号材料
  • 套用规定
  • ZPW-2000 轨道电路

Cited By