TB/T 10829-2024 railway budget quota Volume 8 power works: scope and application rules (including the overhead power lines chapter's special calibers)

TB/T 10829-2024 Volume 8, revised from TZJ 2008-2017, applies to new and rebuilt railway works and is the consumption standard for railway power-works design estimates (budgets). General rules: bracketed main materials carry no "material cost"/"weight" — book per design; HT-0 concrete per the basic quotas; installation items exclude equipment cost; labor/material/plant prices per TB 10811-2024, TB/T 10813-2024, TB/T 10814-2024. Chapter 1 overhead power lines: poles/tube towers/conductors as bracketed main materials; angle-tower mass per metre = mass (t) / total height (m); live crossings multiply labor and plant by 4.0; rivers within 20 m not counted as crossings; same-class obstacles within one span spaced <=50 m count as one spot.

Applicable Codes

  • TB/T 10829—2024 铁路工程预算定额 Vol. 8 电力工程
  • TB/T 10821—2024 铁路工程基本定额
  • TB 10811—2024 铁路基本建设工程设计概(预)算费用定额
  • TB/T 10813—2024 铁路工程材料基期价格
  • TB/T 10814—2024 铁路工程施工机具台班费用定额
  • TB 10008 铁路电力设计规范
  • TB 10420 铁路电力工程施工质量验收标准

Topic Positioning

The positioning, scope, general-note rules, and Chapter 1 "overhead power lines" special calibers (bracketed main materials, obstacle crossings per "spot") of TB/T 10829-2024 Volume 8 (the 2024 system's eighth volume) — for compiling railway power-works estimates (budgets).

Core Conclusions

  1. Positioning and scope. Revised from TZJ 2008-2017 per TB 10008 "Code for design of railway power supply" and TB 10420 acceptance. Volume 8 of 13 (subgrade, bridge and culvert, tunnel, track, communication, signaling, information, power, traction power supply, buildings, water supply and drainage, locomotive/car/machinery, station yards). General notes: "This quota applies to new and rebuilt railway works"; "a consumption standard of labor, materials, construction plant, and instruments per unit of divided works, and the basis for compiling railway design estimates (budgets). Implementation-stage prices are market-determined." 15 chapters: overhead power lines; cable lines; foundations; busbar structures/wall bushings and protection; insulators and busbars; conduits and wiring; lighting; lightning protection and grounding; substation equipment; distribution equipment; control-room equipment; low-voltage apparatus; PV power stations; automation systems; electrical system commissioning.

  2. General-note rules (common to 13 volumes). Labor: consumptions include basic, auxiliary, and short-haul labor; factory-process items cover within the temporary yard, others within 50 m; shifts of 8 hours. Materials: consumption = net + waste (rates per TB/T 10821-2024); turnover materials amortized per the basic quotas; "bracketed material quantities represent the consumption per quota unit; such items carry no 'material cost' or 'weight' — book per the design materials"; swap main materials with consumptions unchanged where they differ; "HT-0" concrete carries no cost, weight, or constituents (per the basic quotas); ready-mixed concrete at the local market price including freight (no separate mixing and transport); sundry materials in "other material costs". Plant and instruments: rarely used items in "other plant costs". Equipment: "installation items exclude equipment cost" — always booked separately. Prices: labor per TB 10811-2024; materials per TB/T 10813-2024; plant per TB/T 10814-2024. Limits: "within/below" include the number; unmarked dimensions mm; "work content" covers every step from preparation to cleanup, listed or not.

  3. Chapter 1 "overhead power lines" special calibers. Item range: pit excavation; pole and tower erection; cross-arm installation up to 1 kV/10 kV/35 kV; conductor stringing; crossings; stays; base and collar plates; auxiliaries. Main materials separate: poles, tube towers, conductors bracketed — no "material cost"/"weight"; book per design. Angle-tower erection: mass per metre = tower mass (t) / total height (m) selects the item. 10 kV cross-arm models reference atlases such as 03D103 "Installation of overhead lines up to 10 kV". Crossings (per "spot"): the 10 kV and 35 kV crossing items assume de-energized work on power and low-voltage (weak-current) lines — live crossings multiply labor and plant by 4.0; river crossings apply only to water-carrying rivers (lakes), rivers within 20 m not counted; "where one span contains several adjacent same-class obstacles, spacing <=50 m counts as one spot and >50 m as two; where one span contains several kinds, count by number."

  4. 2024 revisions vs TZJ 2008-2017 (note old-new differences when selecting): removed service-drop stringing and blast-excavated pole pits; added angle-tower erection; added concrete cable manhole casting, 35 kV single-core cable laying and cold-shrink joint items; added waterlogged/flowing-sand/rock pit excavation and cable junction/joint-box foundation casting; added wall/floor slotting and drilling; fluorescent to LED luminaires; adjusted 35 kV transformer and 10 kV dry-type regulator installation; added fire-emergency lighting; added electrical-fire monitoring, fire-power-supply monitoring, fire-door monitoring, storage-yard fire video monitoring, and tunnel disaster-relief mechanical/electrical monitoring items.

Applicable Boundaries

  • Verified from the general notes, Chapter 1 volume notes, and foreword of TB/T 10829-2024; scope limited to new and rebuilt railway works.
  • The application rules (labor/materials/plant/equipment/prices) are the common general notes of all 13 volumes, not unique to Volume 8; Chapters 2-15 (cable lines, foundations, substation, distribution, etc.) have their own chapter notes — consult before applying.
  • "Book separately" means separately booking cost/weight/constituents only — quota consumptions must not change; swaps only with consumptions unchanged.
  • Terrain factors, high-altitude work, and demolition factor tables were not re-verified here — follow the original text.

Further Reading

  • TB/T 10829-2024: general notes; Chapter 1 volume notes (with the crossing measurement rules as written).
  • Companions: TB/T 10821-2024 (waste rates, amortization, HT-0); TB 10811-2024; TB/T 10813-2024; TB/T 10814-2024.
  • Basis: TB 10008, TB 10420; atlas 03D103.
  • Old edition: TZJ 2008-2017 (superseded; mind the revisions above when selecting items).