TB/T 10832-2024 railway budget quota Volume 11 water supply and drainage: scope and application rules (with the Chapter 1 water-source special calibers and 2024 revisions)

TB/T 10832-2024 Volume 11 (replacing TZJ 2011-2017, effective 1 January 2025) applies to new and rebuilt railway water supply, drainage, and noise-barrier works — the consumption standard for design estimates (budgets); unpriced materials are booked per design specs; pipe anti-corrosion and insulation may borrow Volume 12 TB/T 10833-2024 items. General rules: bracketed materials / HT-0 concrete / equipment costs not included — book separately; main materials may be swapped with consumptions unchanged; labor/material/plant prices per TB 10811-2024, TB/T 10813-2024, TB/T 10814-2024. Chapter 1 water sources: drilled wells apply by three strata (sand-clay / hard clay-sand-gravel / cobble-shale-slate) in segments; drilling diameter = casing diameter + filter thickness; well screens swapped per design; the well items exclude underground/overhead obstruction treatment.

Applicable Codes

  • 《铁路工程预算定额 第十一册 给水排水工程》TB/T 10832—2024
  • 《铁路工程基本定额》TB/T 10821—2024
  • 《铁路基本建设工程设计概(预)算费用定额》TB 10811—2024
  • 《铁路工程材料基期价格》TB/T 10813—2024
  • 《铁路工程施工机具台班费用定额》TB/T 10814—2024
  • 《铁路工程预算定额 第十二册 机务车辆机械工程》TB/T 10833—2024
  • 《铁路给水排水设计规范》TB 10010
  • 《铁路给水排水工程施工质量验收标准》TB 10422
  • 《铁路声屏障工程设计规范》TB 10505
  • 《铁路声屏障工程施工质量验收标准》TB 10428

Topic Positioning

The positioning, scope, general-note rules (shared by 13 volumes), and volume notes of TB/T 10832-2024 Volume 11, plus Chapter 1 "water sources" special calibers (drilled-well strata, drilling diameter, screen swapping) and the 2024 revisions affecting item selection — for compiling railway water supply/drainage and noise-barrier estimates (budgets).

Core Conclusions

  1. Positioning and scope. Revised from TZJ 2011-2017 per TB 10010 "Code for design of railway water supply and drainage", TB 10422 acceptance, TB 10505 "Code for design of railway noise barrier works", TB 10428 acceptance (issued 2024, effective 1 January 2025). General notes: "applies to new and rebuilt railway works"; "a consumption standard ... the basis for compiling railway design estimates (budgets). Implementation-stage prices are market-determined." 13 volumes; this is Volume 11. Volume notes: "applies to railway water supply and drainage and noise barrier works"; "when compiling estimates (budgets), book the quota's unpriced materials per the design specs"; "pipe anti-corrosion and insulation may use the relevant items of Volume 12 TB/T 10833-2024". Seven chapters: water sources; pipe trenches and pit excavation; outdoor pipe laying; buildings; auxiliary works; mechanical equipment installation; noise barrier works.

  2. General-note rules (13-volume common). Labor: consumptions include basic, auxiliary, and short-haul labor; factory-process items within the temporary yard, others within 50 m; shifts of 8 hours. Materials: net + waste (rates per TB/T 10821-2024); turnover materials amortized per the basic quotas; "bracketed material quantities represent the consumption per quota unit; such items carry no 'material cost' or 'weight' — book per the design materials"; "where the design's main materials differ from the item, swap with consumptions unchanged"; "HT-0" concrete items carry no cost, weight, or constituents (per the basic quotas), other codes included and adjusted when the design differs; ready-mixed concrete "at the local market price including freight — no separate mixing and transport"; sundries in "other material costs". Plant and instruments: rarely used in "other plant costs". Equipment: "installation items exclude equipment cost". Prices: labor per TB 10811-2024; materials per TB/T 10813-2024; plant per TB/T 10814-2024. Limits: "within/below" include the number; unmarked dimensions mm; "weight" is the sum of material weights, excluding auxiliaries, "other material cost" items, water, and plant fuel.

  3. Chapter 1 "water sources" special calibers. Two sections: drilled wells; open wells and others. Drilled-well strata in three classes: (1) sand and clay strata — topsoil, sludge, peat, soft coal, sandy clay, silt, fine and medium sand, clayey soils and new loess with gravel/cobble content under 20%; (2) hard clay, sand, gravel strata — hard clay, frozen soil, coarse sand, gravelly sand, weathered slate, clayey soils and new loess with 20%-50% gravel/cobble; (3) cobble, shale, slate strata — cobbles, shale, slate, weathered limestone, granite, gneiss, and other weathered rock. "When using the drilling quotas, apply the items in segments by stratum class, well diameter, and well depth." "The drilled-well diameter is the casing diameter plus the filter thickness." Screen fabrication and installation may be swapped per the design's screen and wrapping-wire types and local strata. "Sinking excavation by hand assumes hand work with winches within 8 m diameter"; "the drilled-well and open-well items exclude treatment of underground and overhead obstructions — book separately when occurring."

  4. 2024 revisions (directly affecting selection and pricing): Section 2 of Chapter 1 renamed from "open wells and sinking wells" to "open wells and others"; Chapter 2 Section 1 renamed from "earthworks" to "earthworks" and frozen-soil excavation items deleted; hydraulic-breaker excavation of rock in trenches and pits added; socketed cast-iron water pipes with expansive-cement joints obsoleted; socketed cast-iron drainage pipes delete asbestos-cement and cement joints, add rubber-ring joints; reinforced-concrete pipes delete collar asbestos-cement joints; pipe-jacking bentonite drag reduction, cement-slurry displacement, and horizontal directional drilling items added; water-tower items deleted; in the welded-flange-valve items the valve is treated as an unpriced main material.

Applicable Boundaries

  • Verified from the general notes, foreword, Part 1 volume notes, and Chapter 1 notes of TB/T 10832-2024; Chapters 2-7 (trench/pit excavation, outdoor pipes, buildings, auxiliaries, mechanical installation, noise barriers) are outside — consult their chapter notes.
  • For railway water supply/drainage and noise barriers, new and rebuilt only; consumption-standard rules without fee rates — measure fees, indirect costs, and differences per TB 10801-2024 and TB 10811-2024.
  • "Book separately" means separately booking cost/weight/constituents — consumptions unchanged; swaps only with consumptions unchanged.
  • Building-works concrete/mortar per TB/T 10831-2024 Volume 10; frozen-soil items are deleted — determine the pricing of frozen-soil excavation per the project's actual quota caliber.

Further Reading

  • TB/T 10832-2024: general notes, foreword, Part 1 volume notes, Chapter 1 "water sources" notes (drilled wells; open wells and others).
  • Related codes: TB/T 10821-2024 (basic quotas), TB 10811-2024, TB/T 10813-2024, TB/T 10814-2024, TB/T 10833-2024 (Volume 12, pipe anti-corrosion/insulation), TB/T 10831-2024 (Volume 10), TB 10801-2024.
  • Design/acceptance bases: TB 10010, TB 10422, TB 10505, TB 10428.
  • Old edition: TZJ 2011-2017 (superseded; mind the revisions above).