Suspended-basket scaffold quota-item selection: exterior paint/insulation/curtain wall per work type — FY-444/FY-445/FY-443 (TB/T 10831-2024 Volume 10, Building Works)
Exterior painting adopts the "painting (oil) paint" item (FY-444); exterior insulation (insulation-mortar plastering, bonding mortar and other mortar-type work) adopts the "mortar" item (FY-445); tiled and curtain-wall work adopts the "block-facing curtain wall" item (FY-443). Where several works proceed consecutively in the same basket, only one item is selected by the principal work type — two items must not be applied duplicatively; basket assembly/disassembly (including testing of the electric device, safety lock, and balance controller) is already included in the work contents and not charged separately. Basis: TB/T 10831-2024 Volume 10, Building Works.
Applicable Codes
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
Topic Positioning
Quota-item selection guidance for suspended-basket scaffolds used for exterior insulation, painting, and curtain-wall work on railway building works, per Chapter 1, Section 4, "Scaffold Works - Individual Scaffolds - Suspended-basket Scaffold" of TB/T 10831-2024 Volume 10, Building Works (Railway Budget Quota).
Core Conclusions
The suspended-basket scaffold is an individual scaffold; the item is selected by work content: exterior painting (oil-paint brushing type work) adopts the "painting (oil) paint" item (FY-444); exterior insulation (insulation-mortar plastering, board-bonding mortar and other mortar-type work) adopts the "mortar" item (FY-445); exterior tiling and curtain walls (block facing) adopt the "block-facing curtain wall" item (FY-443). Where insulation and painting proceed consecutively in the same basket, only one item is charged by the principal work type — two items must not be applied duplicatively. The quota work contents already cover material handling, basket installation, testing of the electric device/safety lock/balance controller, and basket dismantling — basket assembly and disassembly are not charged again.
Applicable Boundaries
Applies only to railway building works (TB/T 10831-2024 Volume 10) and only in projects "unsuitable for the comprehensive scaffold" — the comprehensive scaffold and individual scaffolds must not both be charged on the same work (see the scaffold-system overview card). Not applicable to local building quotas: the Beijing 2021/2024 building and decoration quota has no dedicated basket item, normally handled as actual rental cost or a measures cost; where the local quota of the project's locality conflicts, the current local quota prevails. Item prices are base-period quota prices; actual pricing must adjust for labor, material, and machinery price differences at the compilation period.
Further Reading
See TB/T 10831-2024 "Railway Budget Quota, Volume 10: Building Works", Chapter 1, Section 4, Scaffold Works, "II. Individual Scaffolds, (3) Suspended-basket Scaffold" — the work contents and base-price composition tables of items FY-443 to FY-445; read with the same volume's rules on the applicability relation between the comprehensive scaffold and individual scaffolds and the quantity-calculation rules.
Keywords
- suspended (cradle) scaffold
- 电动提升式吊篮
- 外墙涂料
- 外墙保温
- individually priced scaffolds
- FY-444
- FY-445
- 铁路房屋定额