Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Railway 2024 quota subgrade purchased-fill material fee: when chargeable, how the fill price is built up, and the caliber distinction from material costs (TB 10801-2024 clause 3.5 / TB 10811-2024 clause 2.5.1)

The fill-material fee is charged only for filling materials obtained by **purchase** (soil, rock, permeable material, mineral material etc. not treated as materials), built up as "fill fee = sum(fill consumptions x fill price)" (TB 10801-2024 clause 3.5.2); the fill price is exclusive of deductible input VAT and is determined by investigation and analysis by the design organization (TB 10811-2024 clause 2.5.1) — it does not enter the material library, carries no purchasing and custody charges, and is not subject to price adjustment (for fluctuation). Self-excavated reuse (cut-to-fill) carries no fill fee; land-related costs of borrowing from temporarily occupied land go under Chapter 1 temporary land-use fees. This differs sharply from the clause-3.2 works material cost (norm-based material price for estimating = (material price at source + freight and handling included in the material price) x (1 + purchasing and custody rate)); in practice the test is "whether it appears in the quota consumption table".

Applicable Codes

  • TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.2、3.5条
  • TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.5.1条
  • TB/T 10822-2024 · Budget Quota of Railway Engineering (Volume 1: Subgrade Works) Ch. 1表3及计量规则

Topic Positioning

Under the railway 2024 quota system (TB 10801-2024 compilation measures / TB 10811-2024 norms for on-costs and expenses / TB/T 10822-2024 subgrade volume): when the "fill-material fee" is chargeable, how its price is built up and its measurement caliber, and the boundary test distinguishing it from "works material cost" (clause 3.2).

Core Conclusions

(1) When a fill fee is charged — the test is whether the filling material is obtained by "purchase". TB 10801-2024 clause 3.5.1, as written: "The fill fee means expenses incurred in purchasing filling materials not treated as materials, such as soil, rock, permeable material and mineral material."

  • Purchased only: borrowed soil (purchased from borrow pits), purchased crushed-stone fills, permeable material, mineral material, purchased improved-soil materials — any filling material paid for has its material price proper listed as fill fee;
  • Self-excavated reuse not charged: cut-to-fill allocation within the works ("use of excavated material as fill") involves no purchase outlay — only excavation/haulage, placement-compaction and fill haulage quota fees, no fill fee;
  • Temporary land borrowing: where the design borrows fill from temporarily occupied land, land rental, crop compensation, demolition compensation, rehabilitation and all other land-related costs are not part of the fill fee but, per clause 3.5.1, go under Chapter 1 temporary land-use fees and temporary-land rehabilitation.

(2) Price build-up — TB 10801-2024 clause 3.5.2: fill fee = sum(fill consumptions x fill price).

  • Consumptions: per the subgrade volume's measurement rules, "quantities of fill preparation, fill haulage and placement compaction are measured by design fill cross-sections in compacted volume"; fill crushing is measured in compacted volume; berm earth/rock and quantities to be reserved for settlement enter the fill quantities; the backfill earth/rock between subgrade base clearing/rolling and the original ground enters the fill quantities; subgrade watering is measured per design quantity in tonnes.
  • Weight conversion: purchased group A and B fills are computed at an apparent density of 2.5 t/m3 (TB/T 10822-2024 subgrade volume, Chapter 1, Table 3 note); reference densities in the same table: below subgrade bed (design speed >200 km/h) 2.233 t/m3; lower subgrade bed (design speed >200 km/h) 2.305 t/m3; lower subgrade bed (160 km/h < design speed <=200 km/h) 2.257 t/m3.
  • Fill price: TB 10811-2024 clause 2.5.1, as written: "The fill price is exclusive of deductible input VAT and is determined by investigation and analysis by the design organization." — it does not go through the base-period material-price system, carries no purchasing and custody charges, and has no price adjustment mechanism; it is charged directly as investigation price times volume.

(3) Caliber distinction from works material cost (TB 10801-2024 clause 3.2 vs 3.5):

  • Objects: material cost covers main materials, auxiliary materials, components, parts, semi-products and products consumed in construction that form the permanent works, plus consumables not forming the works and amortized formwork materials; the fill fee covers only filling materials not treated as materials (soil, rock, permeable material, mineral material etc.).
  • Formulas: material cost = sum(quota material consumptions x norm-based material price for estimating); norm-based material price for estimating = (material price at source + freight and handling included in the material price) x (1 + purchasing and custody rate) (3.2.5), the purchasing and custody charges covering purchasing charges, warehousing charges, site storage charges, transport losses, storage losses etc.; the difference between compilation-period and base-period material costs is listed as material price differential (3.2.3). The fill fee has none of these formulas or price adjustment mechanisms.
  • Practical test: whether the material appears in the quota consumption table — what enters the table (hydrated lime, cement, water, gravel, reinforcement, concrete etc.) goes the material-cost route, priced by the material budget-price formula and subject to price adjustment; what does not enter the table and is priced separately by design volume (the soil/rock proper) goes the fill-fee route. Typical combination: improved-soil placement = soil proper (fill fee) + lime/cement admixture (material cost) + preparation/haulage/compaction quota fees.

Applicable Boundaries

  • Applies to compiling railway capital construction design estimates (budgets) (the 2024 quota system around TB 10801-2024, effective 1 January 2025, replacing TZJ 1001-2017 and the old system).
  • Does not apply to: self-quarried/self-processed fill (e.g. machine-made sand from a self-built quarry) — analyzed as material cost with the quarry price as the material price at source, not the fill fee; land-related costs of temporary-land borrowing go under Chapter 1 temporary land-use fees and rehabilitation.
  • Note: 2.5 t/m3 and the Table 3 densities are conventional values for conversion of quota items, not field-measured densities; the fill fee covers the material price proper only — excavation, haulage, placement-compaction and other construction costs are charged by the corresponding quota line items; do not duplicate or omit.

Further Reading

  • TB 10801-2024 "Measures for compiling design estimates (budgets) of railway capital construction projects", clause 3.2 (material cost) and clause 3.5 (fill fee).
  • TB 10811-2024 "Railway capital construction design estimate (budget) norms for on-costs and expenses", clause 2.5.1 (fill price).
  • TB/T 10822-2024 "Railway works budget quota manual, Volume 1: subgrade works", Chapter 1 "subgrade earthworks (earth and rock)" notes: Table 3 (group A/B fill densities, 1 m3 compacted) and the eight measurement rules (fill preparation/haulage/compaction by compacted volume; clearing by design-treated surface area; spoil spreading and rolling by natural in-situ (undisturbed) volume etc.).
  • Extended comparison: formulas for norm-based material prices for estimating and industry caliber differences (railway vs highway); the railway base-period price A/B/C classification — see the related knowledge cards.

Keywords