Luminaire classes and listing notes for the lighting installation bill (code 030413) of GB/T 50856-2024
Per GB/T 50856-2024 Annex D table D.13.1 (lighting installation, code 030413) notes: luminaires divide into ordinary lamps, decorative lamps, factory lamps, high-point (obstruction) lamps, medical lamps, neon, campus street lamps, landscape lamps and lighting switches; neon covers tubes, strips, transformers, controllers, relays, timers and control boxes - all components; mid-mast lamps mount on poles 19 m high or less, high-mast lamps on poles over 19 m; where measured in "m" the item description shall state the lamp width, in "m2" the lamp size.
Applicable Codes
- GB/T 50856-2024 · Standard for measurement of general mechanical, electrical, plumbing and fire services App. D 电气设备安装工程 Table D.13.1 照明器具安装(编码:030413)
Topic Positioning
The luminaire classes, item descriptions and listing requirements of lighting installation (code 030413) in Annex D (electrical installation) of GB/T 50856-2024 (quantity take-off standard for general building services).
Core Conclusions
Notes to table D.13.1 lighting installation (code 030413), original key points: 1 Ordinary lamps include globe and semi-globe ceiling lamps, square ceiling lamps, flex pendants, lampholders, chain pendants, waterproof pendants and wall lamps. 2 Decorative lamps include pendant, ceiling, fluorescent and geometric-combination artistic lamps, sign lamps, directional decorative lamps, point-source artistic lamps, dance-hall lamps and the like. Measured in "m", the description shall state the lamp width; in "m2", the lamp size. 3 Factory lamps include factory-duty, waterproof, dust-proof, tungsten-halogen, spot, flood, enclosed, sodium, mixed-light, damp-proof, oval deck and tubular xenon lamps serving factory lighting. 4 High-point (obstruction) lamps include chimney, tower and rooftop obstruction markers. 5 Medical lamps include ward indicator and night lamps, ultraviolet sterilisers and shadowless lamps. 6 Neon covers tubes, strips, transformers, controllers, relays, timers, control boxes - all components. Measured in "m", the description shall state the lamp width. 7 Campus street lamps include single (double) arm bracket lamps, large street elbow lamps, courtyard lamps, bridge-rail lamps, high-mast and mid-mast lamps; mid-mast lamps mount on poles 19 m high or less, high-mast lamps on poles over 19 m. 8 Landscape lamps include column lamps, tree-string festoon lamps, lawn fittings, ground-projectors, facade point sources, floodlights, facade outline lamps and the like. Measured in "m", state the width; in "m2", the size. 9 Lighting switches include ordinary switches and sound (light) controlled delay switches (controllers). 10 Support hangers of combination decorative luminaires list under Annex N.1 (other and ancillary works); city landscape lighting and intelligent lighting control systems likewise. 11 Fibre sun-collector fibre conduits, fibre laying and power conduits and wiring list under the corresponding items; solar-powered luminaires are inside this annex's luminaire sets - list under the corresponding items.
Applicability Boundaries
- For bills compiled on GB/T 50856-2024 (code 030413); quota itemisation may differ (Beijing DB11/T 2382-2024 Annex C clause 6.4.117 items by lamp type and mounting) - never mix the two.
- Strip lamps may class as "neon" or "decorative" per the design and descriptions; anything measured in "m" must state the width, in "m2" the size.
- Mid-mast versus high-mast split at 19 m pole height: 19 m exactly is still mid-mast.
- Solar luminaires list no separate items - inside the annex's luminaire sets; fibre sun-collector conduits, laying and power conduits and wiring list separately.
Further Reading
- GB/T 50856-2024, Annex D, table D.13.1 notes; the same annex's conduit / wiring and ancillary chapters for conduit, wiring and hangers.
- Quota cross-check: local installation consumption / budget quotas, "lighting luminaire installation" chapters (Beijing DB11/T 2382-2024 Annex C 6.4 XIII).