drift pins
- 01
Drift pins and temporary (erection) bolt counts in steel-structure pre-assembly and high-strength bolt erection: GB 50205-2020 Clause 9.2.2, GB 50755-2012 Clauses 10.2.6 / 7.4.3
Two scenarios: (1) Physical pre-assembly (GB 50205-2020 Clause 9.2.2, GB…
GB 50205-2020 · Standard for Acceptance of Construction Quality of Steel Structures 第9.2.2条GB 50755-2012 · Code for Construction of Steel Structures 第10.2.6条GB 50755-2012 · Code for Construction of Steel Structures 第7.4.3条2026-09-25 - 02
Erection of steel plate composite girders (steel-concrete composite beams): reference framework and construction safety operation points
Composite girder erection schemes are organized around four links: "temp…
TB 10303-2020 铁路桥涵工程施工安全技术规程TB 10415-2018 铁路桥涵工程施工质量验收标准CJJ 2-2008 城市桥梁工程施工与质量验收规范2026-08-30 - 03
Curved steel truss girder assembly and erection points (assembly sequence, drift-pin and bolt counts, alignment survey and monitoring, allowable deviations)
Steel truss girder (incl. curved bridges) assembly and erection: main tr…
TB 10415-2018 铁路桥涵工程施工质量验收标准 第12.3节TB 10752-2018 高速铁路桥涵工程施工质量验收标准 Table 11.2.8TB 10303-2020 铁路桥涵工程施工安全技术规程 第11.2、11.5节2026-08-11