schedule of price-adjustable key materials
- 01
Selecting between the two methods of contract price adjustment for changes in costs: comparison of applicable conditions, clause-by-clause contrast and same-contract mixing boundaries of the Appendix A.1 index-based adjustment and the Appendix A.2 adjustment based on published price information under GB/T 50500-2024
The two methods share an identical adjustable scope, base time point and…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.3.5 条GB/T 50500-2024 第 8.7.1 条GB/T 50500-2024 第 8.7.2 条2026-10-25 - 02
The mechanism for determining the scope of price-adjustable materials and typical categories (GB/T 50500-2024 appendix G.2)
GB/T 50500-2024 sets no statutory "list of price-adjustable materials"…
GB/T 50500-2024 第3.3.5条GB/T 50500-2024 第8.7.2条GB/T 50500-2024 App. A2026-09-25 - 03
Can published price information directly serve as the basis for material price adjustment: legality + three preconditions (listing / beyond band / tax) (GB/T 50500-2024)
Published price information (government guidance prices) is a price sour…
GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 04
Rules for determining the quantity (Q) of materials subject to price adjustment: contractual agreement takes precedence, and key points on matching the quantity basis and the period (GB/T 50500-2024)
There is no unified statutory formula for the adjustable-factor quantity…
GB/T 50500-2024 建设工程工程量清单计价标准 App. A.2.1/A.2.3/A.2.5GB/T 50500-2024 App. G.2 Table G.2.1-1/Table G.2.1-2GB/T 50500-2024 第8.7.1~8.7.4条2026-09-25