excavation retention (support) system
- 01
Soil nail grouting water-cement ratio and re-grouting control: calibers of JGJ 120-2012 / DB11 489-2016 / DBJ/T 15-70-2021 / JGJ 167-2009
The control indicator of soil nail grouting is the water-cement ratio (w…
JGJ 120-2012 建筑基坑支护技术规程 第5.4.5条DB11 489-2016 建筑基坑支护技术规程 第6.3.14条DBJ/T 15-70-2021 土钉支护技术规程 第6.8.3条2026-09-25 - 02
Procedure for applying prestress (pre-axial force) to steel struts: jack calibration -> node inspection -> symmetric synchronized staged loading -> hold then lock -> weld fix ends -> monitor and re-apply
Prestressing of steel struts follows the procedure "calibrate equipment…
JGJ 120-2012 建筑基坑支护技术规程 第4.10.6条DB11/T 1832.1-2021 建筑工程施工工艺规程 第1部分:地基基础工程 第29.4.10条DB62/T 3019-2018 建筑地基基础工程施工工艺规程 第6.3.6条2026-09-25 - 03
Diaphragm-wall guide walls: construction and detailing requirements per GB 51004-2015 clause 6.6.2, with key parameters compared across local codes
Per GB 51004-2015 "Code for construction of building foundation works" c…
GB 51004-2015 建筑地基基础工程施工规范 第6.6.2条DBJ/T 15-20-2016 建筑基坑工程技术规程 第9.2.1条DBJ/T 15-152-2019 建筑地基基础施工规范 第24.3.2条及Table 24.3.22026-09-25